Print Statement | | | 4/23/2018 | | DONE |
|
|
|
sent 1st late notice 4-24-18
|
Print Statement | | | 1/19/2018 | | DONE |
|
|
|
|
Third Notice | | 12/17/2017 | 1/12/2018 | | DONE |
|
|
|
Mailed 1-12-18
|
Third Notice | | 11/19/2017 | 12/12/2017 | | DONE |
|
|
|
Mailed 12-13-17
|
Third Notice | | 10/17/2017 | 11/14/2017 | | DONE |
|
|
|
Mailed 11-15-17
|
Second Notice | | 9/29/2017 | 10/12/2017 | | DONE |
|
|
|
Mailed 10-13-17
|
First Notice | | 8/12/2017 | 9/19/2017 | | DONE |
|
|
|
Mailed 9-20-17
|
BLD-Final | 8/2/2017 | 8/2/2017 | 8/2/2017 | P | PASS |
Dave Hannah
|
|
|
Ryan Phone #: ###-####
|
Permanent Occupancy | | | 8/2/2017 | | DONE |
|
|
|
|
BLD-Aging Inspection | 7/20/2017 | 7/20/2017 | 7/28/2017 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 5/12/2017 | 8/10/2017 | 5/12/2017 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 5/11/2017 | 5/11/2017 | 5/11/2017 | P | PEND |
Dave Hannah
|
|
|
ok for temp occ needs other trades to final and fix ada rest room
|
Zoning Approval | 5/11/2017 | 5/11/2017 | 5/11/2017 | | DONE |
Andrea Tuning
|
|
|
|
Print Occupancy Form | | | 5/11/2017 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/17/2017 | 3/17/2017 | 3/17/2017 | P | PASS |
Jim Page
|
|
|
Previously noted items have been repaired, no fir sprinklers, in duct detectors are stand-alone, no fire alarms, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 2/17/2017 | 2/21/2017 | 2/21/2017 | A | FAIL |
Jim Page
|
|
|
Round type door handle on north exit door needs to be replaced with single action lever type door hardware. Same northside exit door has wood and bracketing across the door securing the door shut, wood and bracket needs to be removed permenantly for emergency egress at all times. Thumb-turn deadbolt on main front entry needs to be changed to a double-key deadbolt and the proper signage installed on main door as specified in fire code review comments. No fire extingusher on site at time of inspection, fire extinguisher will need to be tagged with the correct inspection tag and mounted before final fire inspection.
|
BLD-Aging Inspection | 11/1/2016 | 11/1/2016 | 11/3/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 11/2/2016 | 11/2/2016 | 11/3/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 6/20/2016 | 6/20/2016 | 6/20/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 6/20/2016 | 6/20/2016 | 6/20/2016 | P | PASS |
Dave Hannah
|
|
|
Call ten minutes before to meet // Ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 5/31/2016 | 5/31/2016 | 5/31/2016 | P | PASS |
Dave Hannah
|
|
|
Please call ahead for access, or leave message with questions - Ryan Phone #: ###-#### k to insulate after elec rough in
|
Plan assigned to (CJW) | 9/11/2015 | 9/11/2015 | 11/19/2015 | | PASS |
Carl Westfall
|
|
|
(1st done) CLAIRVOYANT BREWERY (Sept 30 - 15 days) Level 3 TI - ePlanReview
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/19/2015 | | DONE |
|
|
|
***ALL REQUIRMENTS MET 11-19-15 //CEV Needs ACHD approval, GC Form, Revised Cert of Value
|
Issue PAID IN FULL permit | | | 11/19/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/19/2015 | | DONE |
|
|
|
|
Routing - PLUMBING | 11/16/2015 | | 11/18/2015 | | PASS |
Bill VanDegrift
|
|
|
Plumbing changes - again
|
Routing - PLAN CHECK | 11/13/2015 | | 11/16/2015 | | PASS |
Carl Westfall
|
|
|
Last item resolved
|
Routing PW Sewer Rating | 11/16/2015 | | 11/16/2015 | | PASS |
Beverly Mountain
|
|
|
Changed plumbing fixtures again
|
Routing - MECHANICAL | 11/16/2015 | | 11/16/2015 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 11/13/2015 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 11/9/2015 | | DONE |
|
|
|
|
Routing - MECHANICAL | 10/29/2015 | | 11/6/2015 | | FAIL |
Troy James
|
|
|
Talked to mechanical engineer. Playing phone tag with owner to get the info on the kettle and mash tank
|
Routing - PLUMBING | 10/29/2015 | | 11/5/2015 | | PASS |
Bill VanDegrift
|
|
|
Additional and revised plumbing plans were provided
per plans and ISPC
|
Routing PW Environmental | 10/29/2015 | | 11/4/2015 | | PASS |
Rick Christenson
|
|
|
See Pretreatment Comment (under Agency Comments) in ePlan Review.
Please remove the changemark on Sheet P0.0. If you want to add a note, please put a redline on the drawings.
|
Routing PW Sewer Rating | 10/29/2015 | | 11/2/2015 | | PASS |
Beverly Mountain
|
|
|
Urinal added
|
Routing - PLAN CHECK | 10/29/2015 | | 10/29/2015 | | FAIL |
Carl Westfall
|
|
|
Item #5 not resolved
|
Plan Reviewer's activity | | | 10/29/2015 | | DONE |
|
|
|
Uploaded revised Cert. of Value. See the Documents tab in Tidemark.
|
Plan resubmittals received | | | 10/29/2015 | | DONE |
|
|
|
|
1st review completed | | | 10/2/2015 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 10/2/2015 | | DONE |
|
|
|
|
Routing - FIRE | 9/11/2015 | | 10/2/2015 | | PASS |
Scott Arellano
|
|
|
Review attached to case.
|
Routing - PLAN CHECK | 9/11/2015 | | 10/1/2015 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing PW Environmental | 9/14/2015 | | 9/17/2015 | | PASS |
Rick Christenson
|
|
|
|
Routing - MECHANICAL | 9/11/2015 | | 9/16/2015 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 9/11/2015 | | 9/15/2015 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing PW Sewer Rating | 9/14/2015 | | 9/15/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Design Review | 9/11/2015 | | 9/15/2015 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - CZC13-00178
|
Routing - Addressing | 9/11/2015 | | 9/14/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 9/11/2015 | | 9/14/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 9/11/2015 | | 9/14/2015 | | PASS |
Andy J. Long
|
|
|
No ESC permit or plan required due to internal TI with no external excavation per letter from project architect. Saw cutting and floor replacement less than standards established on form #707. Low risk project
|
Pending Assignment by JCB | 9/11/2015 | | 9/11/2015 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 9/11/2015 | | DONE |
Jason Blais
|
|
|
Emailed architect to have him contact ACHD to evaluate if any additional impact fees are due. Written verification from ACHD shall be provided to our Permit Counter prior to the building permit being issued.
|
Routing - PLANNING | 9/11/2015 | | 9/11/2015 | | PASS |
David Moser
|
|
|
David Moser - CUP14-00083
|
Plan Reviewer's activity | | | 9/10/2015 | | PASS |
|
|
|
Plan intake review passed
|
Intake Approval | | | 9/10/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Carl Westfall and plan review fees paid.
|
Intake Approval | | | 9/4/2015 | | FAIL |
|
|
|
(9-4-15) Please resolve each circled item on the Plan Intake Checklist.
|
Application received | | | 9/3/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 3 2015 12:10PM
|