BLD-Aging Inspection | 3/16/2016 | 3/16/2016 | 3/17/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/17/2016 | 3/17/2016 | 3/17/2016 | | PEND |
Dave Hannah
|
|
|
|
Fees Due Hold | 11/6/2015 | | 11/10/2015 | | DONE |
Rita DeYoung
|
|
|
fees paid through JV
|
OVERRIDE | | | 11/5/2015 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/5/2015 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 11/5/2015 | | DONE |
|
|
|
|
Fees Due Hold | 10/30/2015 | | 11/5/2015 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (AJS) | 10/30/2015 | 10/30/2015 | 11/4/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
my review completed Plan Mod. - ePlanReview - Boise Library
|
Routing - Design Review | 11/3/2015 | | 11/4/2015 | | PASS |
Josh Wilson
|
|
|
Ok per CZC15-00211
|
Routing - PLAN CHECK | 11/3/2015 | | 11/4/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/4/2015 | | DONE |
|
|
|
|
BLD-Foundation | 11/2/2015 | 11/3/2015 | 11/3/2015 | A | PART |
Dave Hannah
|
|
|
Colin Phone #: ###-####
|
BLD-Footing | 10/29/2015 | 10/29/2015 | 10/30/2015 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
Plan Modification Accepted | | | 10/30/2015 | | DONE |
Christina Prado
|
|
|
Received request from Stephanie at Trout Architects to revise plan sheets and omit the window replacement portion since a seperate permit was already pulled (BLD15-03256)
|
Issue & PRINT to be Invoiced | | | 10/29/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/29/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 10/6/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 9/18/2015 | 9/18/2015 | 10/6/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Level 3 TI - ePlanReview - Boise Library
|
Routing PW Drainage | 10/6/2015 | | 10/6/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLAN CHECK | 10/6/2015 | | 10/6/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/6/2015 | | DONE |
|
|
|
NEED GC AND REVISED CERT OF VALUE
|
1st review completed | | | 10/2/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 9/18/2015 | | 10/2/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Design | 9/21/2015 | | 9/25/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Drainage | 9/21/2015 | | 9/24/2015 | | FAIL |
Brian Murphy
|
|
|
Need O&M Manual
|
Routing - Design Review | 9/18/2015 | | 9/23/2015 | | PASS |
Josh Wilson
|
|
|
Ok per CZC15-00211
|
Routing - FIRE | 9/18/2015 | 9/18/2015 | 9/22/2015 | | PASS |
Scott Arellano
|
|
|
Work is exterior and changes to sidewalk. Plans were reviewed for fire department vehicle access. No report required.
|
Routing PW Street Lights | 9/21/2015 | | 9/22/2015 | | PASS |
Mike D Hedge
|
|
|
|
Routing PW Geothermal | 9/21/2015 | | 9/21/2015 | | PASS |
Jon R. Gunnerson
|
|
|
Please be aware of underground geothermal utilities around the construction area. Jon Gunnerson ###-####
|
Routing - PUBLIC WORKS | 9/18/2015 | | 9/21/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 9/18/2015 | | 9/21/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required prior to Earth Disturbance Activities)
(BOISE LIBRARY) Selective demolition and replacement of (e) sidewalk, retaining wall, landscaping, stairs, accessible ramp, parking lot surface, modification of existing curb cuts, construction of new handrails, permeable paving, parking stall striping and exterior window work and pane replacement
|
Routing - Addressing | 9/18/2015 | | 9/18/2015 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 9/18/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Tim Woodard and plan review fees paid.
|
Pending Assignment by JCB | 9/18/2015 | | 9/18/2015 | | DONE |
Jason Blais
|
|
|
|
Application received | | | 9/4/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 4 2015 8:06AM
|