BLD-Final | 11/27/2015 | 11/30/2015 | 11/30/2015 | A | PASS |
Mike Jordan
|
|
|
Alex-please call 1/2 hour prior to meet Phone #: ###-####
|
DOC - Permit Finaled | 11/30/2015 | 11/30/2015 | 11/30/2015 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 11/6/2015 | 11/6/2015 | 11/6/2015 | P | PASS |
Mike Jordan
|
|
|
Call half hour to meet // Alex Phone #: ###-####
|
BLD-Other | 10/14/2015 | 10/15/2015 | 10/15/2015 | A | PASS |
Dave Hannah
|
|
|
Poles in floodplain // Alex Phone #: ###-####
|
OVERRIDE | | | 10/5/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/5/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/5/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2015 | | DONE |
|
|
|
|
Telephone call | | | 10/5/2015 | | DONE |
|
|
|
Spoke with Alex (Representative) and informed him that the permit was ready and the fee amount that is due
|
Permit Ready to Issue | | | 10/5/2015 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 9/28/2015 | | 10/5/2015 | | DONE |
Tisha Gallop
|
|
|
walk in 9/28; pole barn, routed to floodplain
|
Routing - PLAN CHECK | | | 10/5/2015 | | PASS |
Tisha Gallop
|
|
|
|
Routing PW Flood Plain | 9/30/2015 | | 10/2/2015 | | PASS |
Jim Wyllie
|
|
|
|
Routing Walk-In (BLD) | 9/28/2015 | 9/28/2015 | 9/28/2015 | A | CANC |
Tisha Gallop
|
|
|
level 2
|
Routing Walk-In (BLD) | 9/17/2015 | 9/17/2015 | 9/17/2015 | A | FAIL |
David Ferguson
|
|
|
need land surveyed for base flood elevation and submit site plan showing elevations. Must build structure according to engineered design or submit design change from engineeer.
|
Routing Walk-In (BLD) | 9/10/2015 | 9/10/2015 | 9/10/2015 | A | FAIL |
Tisha Gallop
|
|
|
pole structure needs to be fully engineered.
|
Routing Walk-In (Zoning) | 9/4/2015 | 9/4/2015 | 9/4/2015 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 9/4/2015 | 9/4/2015 | 9/4/2015 | P | FAIL |
David Ferguson
|
|
|
|
1st review completed | | | 9/4/2015 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 9/4/2015 | | | |
|
|
|
|