Second Notice | | 9/23/2016 | 9/16/2016 | | DONE |
|
|
|
This permit finaled on the web by Leonard Butler
|
First Notice | | 9/2/2016 | 9/13/2016 | | DONE |
Candy A. Nichols
|
|
|
|
Print Occupancy Form | | | 8/23/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/23/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/23/2016 | | DONE |
|
|
|
|
BLD-Final | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | PASS |
Mike Jordan
|
|
|
Ready for full final now that electrical work by owners vendor has been inspected and finaled. Phone #: ###-#### Inspection requested via web by Mike Walling. ok for perm occ.
|
BLD-Final | 3/25/2016 | 3/25/2016 | 3/25/2016 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Mike Walling. Ok for temp occ. Will be ok for perm. occ. once electrical signs perm.
|
FIRE-Final Inspection | 3/24/2016 | 3/24/2016 | 3/24/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Door hardware was not installed on doors but was on site and appeared correct. It would be installed prior to the building inspection
|
PubWorks Occupancy Approval | 3/24/2016 | 3/24/2016 | 3/24/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 3/23/2016 | 3/23/2016 | 3/23/2016 | | PASS |
Josh Wilson
|
|
|
|
BLD-Framing/Rough-in | 3/1/2016 | 3/1/2016 | 3/1/2016 | A | PASS |
Mike Jordan
|
|
|
Framing and shear wall inspection Phone #: ###-#### Inspection requested via web by Mike Walling. INterior steel stud framed walls and shear walls ok.
|
BLD-Conference | 2/10/2016 | 2/10/2016 | 2/10/2016 | A | PASS |
Mike Jordan
|
|
|
Progress inspection. Structural steel complete with special inspection. Conference on railing at ramp. Thanks. Phone #: ###-#### Inspection requested via web by Mike Walling
|
BLD-Concrete | 1/14/2016 | 1/14/2016 | 1/14/2016 | P | PART |
Mike Jordan
|
|
|
Grout for first lift at North elevation at 3:00. Thanks!! Phone #: ###-#### Inspection requested via web by Mike Walling. Work in progress. Pending special inspection.
|
BLD-Conference | 1/5/2016 | 1/6/2016 | 1/6/2016 | P | PASS |
Mike Jordan
|
|
|
Grout for 4th lift at 4:00 p.m. Phone #: ###-#### Inspection requested via web by Mike Walling. Work in progress on 12ft. to 16ft. elevation south east and west walls.
|
BLD-Other | 12/22/2015 | 12/23/2015 | 12/23/2015 | A | PASS |
Mike Jordan
|
|
|
Structural block, 4'' lift Phone #: ###-#### Inspection requested via web by Mike Walling. East, west and south walls, 0fty. to 4ft. elevation. Special inspector on site, ICC cert. verified.
|
BLD-Other | 12/22/2015 | 12/22/2015 | 12/22/2015 | P | CANC |
Mike Jordan
|
|
|
Structural block first lift at lower footing step.
Phone #: ###-#### Inspection requested via web by Mike Walling. Moved to 12-23 in the am.
|
CHANGE STATUS TO (ISS) | | | 11/18/2015 | | DONE |
|
|
|
fees for plan modification have been paid
|
BLD-Footing | 11/17/2015 | 11/17/2015 | 11/17/2015 | P | PART |
Jim Sly
|
|
|
Mike Phone #: ###-#### MTI employee Brad Gehlen Certification verified ....OK Stem walls OK pending M T I special inspection, tests and approvals.
|
OVERRIDE | | | 11/16/2015 | | |
|
|
|
|
Plan assigned to (TLW) | 10/23/2015 | | 11/16/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 11/9/2015 | | 11/16/2015 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/16/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/16/2015 | | DONE |
Christina Prado
|
|
|
DO NOT RE-ISSUE
|
BLD-Foundation | 11/10/2015 | 11/10/2015 | 11/10/2015 | P | PART |
Mike Jordan
|
|
|
Tim gave ok for inspection plan mod is being done on the walls. Any questions talk with Tim W // Leonard Phone #: ###-####. Placement completed when arrived on site. Special inspector on site, need to confirm ICC cert.
|
Plan resubmittals received | | | 11/9/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/9/2015 | | 11/9/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 10/23/2015 | | 11/5/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 10/23/2015 | | 11/5/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - Design Review | 10/23/2015 | | 10/30/2015 | | PASS |
Josh Wilson
|
|
|
|
Plan Modification Accepted | | | 10/23/2015 | | DONE |
|
|
|
Modifications submitted; (A8.1, A1.0, A1.4. E0.1, S0.1, S1.1, S8.1 S9.1) & Structural Calculations
|
Issue PAID IN FULL permit | | | 10/22/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/22/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 10/13/2015 | | |
|
|
|
|
Routing - Addressing | 10/9/2015 | | 10/13/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PLAN CHECK | 10/9/2015 | | 10/13/2015 | | FAIL |
Jason Blais
|
|
|
Unable to approve project due to failed Addressing review. Need proof that record of survey has been completed.
|
Routing - PLAN CHECK | 10/13/2015 | | 10/13/2015 | | PASS |
Jason Blais
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/13/2015 | | DONE |
Jason Blais
|
|
|
|
Permit Ready to Issue | | | 10/13/2015 | | DONE |
|
|
|
***MET*** GC, Certificate of Value, RP, and ACHD
|
Plan assigned to (TLW) | 9/16/2015 | | 10/13/2015 | | PASS |
Tim L. Woodard
|
|
|
1st Review Complete. TLW
|
Routing - MECHANICAL | 10/9/2015 | | 10/12/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/30/2015 | | 10/8/2015 | | PASS |
Brent Moore
|
|
|
Approved in E-Plan. TLW
|
Routing - MECHANICAL | 9/30/2015 | | 10/7/2015 | | FAIL |
Troy James
|
|
|
|
Route to Impact Fee Review | 9/30/2015 | 10/3/2015 | 10/5/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Addressing | 9/30/2015 | | 10/1/2015 | | FAIL |
Emily Dixon
|
|
|
Record of survey not completed.
|
Plan resubmittals received | | | 9/30/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/30/2015 | | 9/30/2015 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 9/29/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/16/2015 | | 9/29/2015 | | FAIL |
Tim L. Woodard
|
|
|
Corrections are in E-Plan Review. TLW
|
Routing - PLANNING | 9/16/2015 | | 9/29/2015 | | FAIL |
Brent Moore
|
|
|
Failed in E-Plan. ROS not complete. TLW
|
Routing Off Site - STRUCTURAL | 9/16/2015 | | 9/29/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 9/16/2015 | | 9/29/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 9/16/2015 | | 9/29/2015 | | PASS |
Megan Durrell
|
|
|
Approved in eplan review. TLW
|
Routing - FIRE | 9/16/2015 | 9/16/2015 | 9/21/2015 | | PASS |
Katie Marron
|
|
|
Report attached to case.
|
Routing PW Environmental | 9/16/2015 | | 9/21/2015 | | PASS |
Rick Christenson
|
|
|
Flammable Liquids Interceptor Shown.
|
Routing - MECHANICAL | 9/16/2015 | | 9/18/2015 | | FAIL |
Troy James
|
|
|
|
Routing - Design Review | 9/16/2015 | | 9/18/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLUMBING | 9/16/2015 | | 9/16/2015 | | PASS |
Daryl Spivey
|
|
|
install a dcva at the water service entrance pipe 1 ¼” to fixtures then to the rpbp for shop non-potable water
|
Pending Assignment by TLW | 9/16/2015 | | 9/16/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing PW Sewer Rating | 9/16/2015 | | 9/16/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 9/16/2015 | | 9/16/2015 | | FAIL |
Emily Dixon
|
|
|
Parcels need to be consolidated.
|
Routing - PUBLIC WORKS | 9/16/2015 | | 9/16/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 9/16/2015 | | 9/16/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(LYLE PETERSON - ACURA SERVICE BUILING) Applicant proposes to construct a new service building behind adjacent existing automotive dealerships. New building will consist of CMU with a bar joist and metal deck roof.
|
Intake Approval | | | 9/10/2015 | | PASS |
|
|
|
|
Application received | | | 9/4/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 4 2015 2:21PM
|
Intake Approval | | | 9/4/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please see check list for comments.
|