Letter of compliance/Occupancy | | | 12/9/2016 | | DONE |
|
|
|
|
BLD-Final | 12/8/2016 | 12/8/2016 | 12/8/2016 | P | PASS |
Phil Shearer
|
|
|
access 3283 Phone #: ###-#### Inspection requested via web by David Wipper
|
DOC - Permit Finaled | 12/8/2016 | 12/8/2016 | 12/8/2016 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 12/6/2016 | 12/6/2016 | 12/6/2016 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Aging Inspection | 10/14/2016 | 10/14/2016 | 10/14/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 10/13/2016 | 10/13/2016 | 10/14/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Other | 6/27/2016 | 6/27/2016 | 6/27/2016 | P | PART |
Tony Young
|
|
|
soffit cover; Phone #: ###-####,, work in progress,, ok so far
|
BLD-Energy code compliance | 6/1/2016 | 6/1/2016 | 6/1/2016 | P | PASS |
Tony Young
|
|
|
Larry Phone #: ###-####
|
BLD-Framing/Rough-in | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | PASS |
Tony Young
|
|
|
Larry Phone #: ###-####
|
BLD-Wall Bracing | 5/3/2016 | 5/3/2016 | 5/3/2016 | P | PASS |
Jim Storey
|
|
|
Larry Phone #: ###-####
|
BLD-Foundation | 2/24/2016 | 2/25/2016 | 2/25/2016 | A | PASS |
Tony Young
|
|
|
would like call ahead; Chris Phone #: ###-####
|
BLD-Footing | 2/23/2016 | 2/24/2016 | 2/24/2016 | A | PASS |
Tony Young
|
|
|
would like call ahead; Chris Phone #: ###-####
|
PubWorks Subgrade Approval | 2/23/2016 | 2/23/2016 | 2/23/2016 | | DONE |
Jason C. Taylor
|
|
|
* ALL MAIN LEVEL FOUNDATION ELEMENTS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 1/28/2016 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 1/28/2016 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 12/22/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 9/18/2015 | 9/18/2015 | 12/22/2015 | | DONE |
Brian McGowan
|
|
|
due 10/8 L2 ePlan. 1st review failed 10-14
12-9-15 - Requested engineering
12-17-15 - Requested engineering
|
Routing - PLAN CHECK | 12/17/2015 | | 12/22/2015 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 12/22/2015 | | 12/22/2015 | | PASS |
Tisha Gallop
|
|
|
per BJM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/22/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/22/2015 | | DONE |
Christina Prado
|
|
|
All requirements met
|
1st review completed | | | 10/14/2015 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/17/2015 | | 10/14/2015 | | FAIL |
Brian McGowan
|
|
|
Additional engineering required on cantilevered beams, garage man door location or grading needs reviewing.
|
Routing PW Grading-Hillside | 9/17/2015 | | 9/23/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - FIRE | 9/17/2015 | 9/17/2015 | 9/21/2015 | | PASS |
Katie Marron
|
|
|
Plans reviewed for fire department vehicle access and water availability.
|
Plan assigned to (LEG) Tisha | 9/17/2015 | | 9/18/2015 | | DEFR |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/17/2015 | | DONE |
|
|
|
|
Intake Approval | | | 9/17/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/17/2015 | | DONE |
|
|
|
|
Routing - MECHANICAL | 9/17/2015 | | 9/17/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/17/2015 | | 9/17/2015 | | PASS |
Sue Cummings
|
|
|
See minor redline
|
Routing - Addressing | 9/17/2015 | | 9/17/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 9/17/2015 | | 9/17/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 9/17/2015 | | 9/17/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 3148 sq. ft., two story (first story 2343 sq. ft., second story 806 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 453 sq. ft. of covered patio/porch and a 947 sq. ft. attached garage
|
Application received | | | 9/10/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 10 2015 8:19AM
|