BLD-Final | 11/23/2015 | 11/24/2015 | 11/24/2015 | P | PASS |
Mike Jordan
|
|
|
Dave Phone #: ###-####
|
DOC - Permit Finaled | 11/24/2015 | 11/24/2015 | 11/24/2015 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 10/19/2015 | 10/20/2015 | 10/20/2015 | P | PASS |
Phil Shearer
|
|
|
David Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/13/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/5/2015 | | DONE |
Christina Prado
|
|
|
all requirements met
|
Routing - PLAN CHECK | 9/30/2015 | | 9/30/2015 | | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 9/30/2015 | | 9/30/2015 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 9/30/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2015 | | DONE |
|
|
|
|
Telephone call | | | 9/30/2015 | | DONE |
|
|
|
Spoke with David informing him that the permit is ready and the fee amount that is due
|
Routing Walk-In (BLD) | 9/10/2015 | 9/10/2015 | 9/14/2015 | A | FAIL |
Tisha Gallop
|
|
|
need engineering to use sunroom engineered wall in place of stick-built to support existing roof, energy code, connection to existing wood frame wall and roof.
|
1st review completed | | | 9/14/2015 | | FAIL |
|
|
|
left vm for Dave Sherman/Champion additional information required.
|
Application received | | | 9/10/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 10 2015 10:09AM
|