Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-03282
StatusFinaled
Name URBAN MODZ
Site Address 1305 E JEFFERSON ST
Project NameEmmons Residence
Customer Number 
ePlanReviewYes
Description
SCOPE-OF-WORK INCLUDES BUT IS NOT LIMITED TO REMODEL TO AN EXISTING SINGLE-FAMILY RESIDENCE OF APPROXIMATELY ±2,101 SF. AND A NEW 2 STOREY ADDITION OF APPROXIMATELT ±847 SF. CONSTRUCTION SHALL CONSIST OF INTERIOR DEMO UNDER SEPERATE PERMIT, STICK FRAME WOOD CONSTRUCTION, STRUCTURAL AND NON-STRUCTURAL WALL REMOVAL AND ADDITION, WOOD WINDOW REPLACEMENT, VARIOUS INTERIOR FINISHES AND CASEWORK, MECHANICAL, PLUMBING AND ELECTRICAL SYSTEMS IMPROVEMENTS. EXTERIOR IMPROVEMENTS INCLUDE UNDERGROUND POWER, COVERED FRONT PORCH AND NEW CONCRETE STOOP AND STEPS, PAINT, EXTERIOR LAWN, VARIOUS PLANTINGS AND EXISTING TREE TRIMMING AND PRUNING.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  9/9/2016 DONE
BLD-Final8/16/20168/16/20168/16/2016PPASS
DetailsMike Jordan
Call 20 mins before // Hans Phone #: ###-####
DOC - Permit Finaled8/16/20168/16/20168/16/2016PPASS
DetailsMike Jordan
BLD-Final8/15/20168/15/20168/15/2016PNR
DetailsMike Jordan
Hanz Phone #: ###-####. Rescheduled for tomorrow. Neds to install handrails.
Zoning Approval8/9/20168/9/20168/9/2016 PASS
DetailsTed Vanegas
Zoning Approval7/13/20167/13/20167/13/2016 PART
DetailsTed Vanegas
Landscaping and decking are not complete and will still need inspection.
BLD-Conference7/11/20167/11/20167/12/2016PDONE
DetailsDave Hannah
Hans Phone #: ###-####
BLD-Energy code compliance4/7/20164/7/20164/7/2016PPASS
DetailsDave Hannah
Manuel Phone #: ###-####
BLD-Framing/Rough-in4/4/20164/4/20164/4/2016PNR
DetailsDave Hannah
Hans Phone #: ###-####
BLD-Framing/Rough-in3/23/20163/24/20163/25/2016PPEND
DetailsDave Hannah
would like call ahead; Bob Phone #: ###-#### ok to insulate needs fire stop around ext fire place and engineering on beam in kitch
BLD-Conference2/19/20162/19/20162/19/2016PPASS
DetailsDave Hannah
Bob Phone #: ###-####
Plan Modification Accepted  2/10/2016 DONE
new manual j report
Routing - MECHANICAL2/10/2016 2/10/2016 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing1/6/20161/6/20161/6/2016PPASS
DetailsDave Hannah
Bob Phone #: ###-####
BLD-Foundation12/30/201512/31/201512/31/2015ACANC
DetailsDave Hannah
Bob Phone #: ###-####
BLD-Wall Bracing12/15/201512/16/201512/16/2015ANR
DetailsDave Hannah
shear // Bob Phone #: ###-####
BLD-Footing10/22/201510/22/201510/22/2015PPART
DetailsDave Hannah
Pat Phone #: ###-#### set backs and grade ok crew still working on rebar
BLD-Footing10/21/201510/22/201510/22/2015ANR
DetailsMike Jordan
Pat Phone #: ###-####. Will reschedule for pm. Discussed rebar dowells to existing footing.
BLD-Footing10/14/201510/15/201510/15/2015ACANC
DetailsDave Hannah
Pat Phone #: ###-####
PLANS/APPL TAKEN TO FRONT DESK  10/13/2015 DONE
DetailsDavid Ferguson
Permit Ready to Issue  10/13/2015 DONE
***ALL REQUIRMENTS MET //CEV 10-13-15 Needs; Responsible Person
Issue PAID IN FULL permit  10/13/2015 DONE
Inspection Record Card- Bld  10/13/2015 DONE
Routing - MECHANICAL10/12/2015 10/12/2015 PASS
DetailsTroy James
Plan assigned to (DAF)9/11/20159/11/201510/9/2015 DONE
DetailsDavid Ferguson
due 9/25 ePlan - Pending Manual J submittal
Routing - PLAN CHECK10/9/2015 10/9/2015 PASS
DetailsDavid Ferguson
Routing - PLANNING10/9/2015 10/9/2015 PASS
DetailsJosh Wilson
Revised Landscape Plan complies with conditions of approval from DRH15-00276.
Routing - PLAN CHECK9/11/2015 9/21/2015 FAIL
DetailsDavid Ferguson
Need stair detail and Manual J
Routing - MECHANICAL9/11/2015 9/21/2015 FAIL
DetailsTroy James
took in plans w/o manual J. Customer is unsure if he will use geothermal or manual J
Still waiting for decision.
1st review completed  9/21/2015 FAIL
DetailsDavid Ferguson
Need stair detail and Manual J
Routing - PLANNING9/11/2015 9/14/2015 FAIL
DetailsMatthew A Halitsky
Landscaping plan does not reflect the conditions of approval required by the Historic Preservation Commission.
Intake Approval  9/11/2015 PASS
manual J will be a deferred submittal. Building permit will not be issued until approval of mamual j.
Application received  9/10/2015 DONE
Application submitted via PDS Online on Sep 10 2015 12:56PM
Intake Approval  9/10/2015 FAIL
DetailsChristina Prado
Need Manual J prior to routing