BLD-Final | 9/9/2016 | 9/9/2016 | 9/9/2016 | P | PASS |
Jim Storey
|
|
|
Rick Phone #: ###-####
|
DOC - Permit Finaled | 9/9/2016 | 9/9/2016 | 9/9/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | NR |
Jim Storey
|
|
|
Rick Phone #: ###-#### handrail height/return at exterior/ 5/8 gyp understair/fireplace sign off
|
BLD-Energy code compliance | 2/24/2016 | 2/25/2016 | 2/26/2016 | A | PASS |
Jim Storey
|
|
|
Insulation // Leann Phone #: ###-####
|
BLD-Framing/Rough-in | 2/18/2016 | 2/19/2016 | 2/19/2016 | P | PART |
Jim Storey
|
|
|
Vance Phone #: ###-#### fire blk/chase/clip porch trusses/ air seal check at insulation insp.
|
Plan Modification Accepted | | | 2/17/2016 | | DONE |
|
|
|
resubmitted manual j report
|
Routing - MECHANICAL | 2/17/2016 | | 2/17/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 12/31/2015 | 12/31/2015 | 12/31/2015 | P | PASS |
Jim Storey
|
|
|
shear // Rick Phone #: ###-####
|
OVERRIDE | | | 10/9/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 9/15/2015 | 9/15/2015 | 10/9/2015 | | DONE |
Brian McGowan
|
|
|
1st Review Completed, failed. 9-23. due 9/28
|
Routing - PLAN CHECK | 10/9/2015 | | 10/9/2015 | | PASS |
Tisha Gallop
|
|
|
per BJM
|
Routing - PLAN CHECK | 10/9/2015 | | 10/9/2015 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/9/2015 | | DONE |
|
|
|
all requirements met
|
Telephone call | | | 10/9/2015 | | DONE |
Christina Prado
|
|
|
Called Richard to advise permti is ready and gave fees due
|
Inspection Record Card- Bld | | | 10/9/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/9/2015 | | DONE |
|
|
|
|
1st review completed | | | 10/8/2015 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/8/2015 | | DONE |
Brian McGowan
|
|
|
|
Plan Modification Accepted | | | 10/6/2015 | | DONE |
|
|
|
One copy Structural Design Calculations, one copy main floor joists support, one copy of sheet right elevation and two copies of sheet A2.0. Taken to Brian
|
1st review completed | | | 9/23/2015 | | FAIL |
Brian McGowan
|
|
|
Required more details and new Second floor framing plan
|
Routing - PLAN CHECK | 9/21/2015 | | 9/23/2015 | | FAIL |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 9/15/2015 | | 9/21/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/15/2015 | | 9/15/2015 | | PASS |
Sue Cummings
|
|
|
|
Plan assigned to (LEG) Tisha | 9/14/2015 | | 9/15/2015 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 9/14/2015 | | 9/15/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/14/2015 | | DONE |
|
|
|
|
Intake Approval | | | 9/14/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/14/2015 | | DONE |
|
|
|
|
Routing - Addressing | 9/14/2015 | | 9/14/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Application received | | 9/11/2015 | | | |
|
|
|
|