BLD-Final | 11/14/2016 | 11/15/2016 | 11/15/2016 | A | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
DOC - Permit Finaled | 11/15/2016 | 11/15/2016 | 11/15/2016 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 11/15/2016 | 11/15/2016 | 11/15/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Concrete | 4/26/2016 | 4/27/2016 | 4/27/2016 | A | CANC |
Phil Shearer
|
|
|
Eric-Soffit Phone #: ###-####
|
BLD-Other | 4/27/2016 | 4/27/2016 | 4/27/2016 | P | PASS |
Phil Shearer
|
|
|
Eric-Soffit Phone #: ###-####
|
BLD-Energy code compliance | 4/7/2016 | 4/8/2016 | 4/8/2016 | A | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 4/8/2016 | 4/8/2016 | 4/8/2016 | P | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 4/1/2016 | 4/4/2016 | 4/4/2016 | A | PART |
Phil Shearer
|
|
|
Eric Phone #: ###-####. Truss bracing, truss hangers missing nails, double king studs for window in master and man door in garage, lower stair landing. OK to insulate
|
Plan Modification Accepted | | | 3/3/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 3/3/2016 | | 3/3/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 3/1/2016 | 3/1/2016 | 3/1/2016 | P | PASS |
Phil Shearer
|
|
|
Shear // Erci Phone #: ###-####
|
BLD-Foundation | 12/2/2015 | 12/2/2015 | 12/2/2015 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 11/23/2015 | 11/23/2015 | 11/23/2015 | P | PASS |
Phil Shearer
|
|
|
Ben Phone #: ###-####
|
PubWorks Subgrade Approval | 11/20/2015 | 11/20/2015 | 11/20/2015 | | DONE |
Jason C. Taylor
|
|
|
**ALL MAIN LEVEL FOOTINGS AND COLUMNS***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 11/3/2015 | 11/3/2015 | 11/3/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears. Bacement walls
|
BLD-Footing | 10/27/2015 | 10/28/2015 | 10/28/2015 | A | PART |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears. Bacement only
|
PubWorks Subgrade Approval | 10/28/2015 | 10/28/2015 | 10/28/2015 | | DONE |
Jason C. Taylor
|
|
|
***LOWER BUILDING FOOTINGS ONLY**A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 10/6/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 10/5/2015 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/5/2015 | | DONE |
|
|
|
|
Telephone call | | | 10/5/2015 | | DONE |
|
|
|
Spoke with Eric informing him the permit is ready to be picked up and the fee amount that is due
|
Plan assigned to (LEG) Tisha | 9/15/2015 | | 10/5/2015 | | DONE |
Tisha Gallop
|
|
|
10/6 L2
|
Routing - PLAN CHECK | 9/23/2015 | | 10/5/2015 | | PASS |
Tisha Gallop
|
|
|
|
Routing - PLANNING | 10/5/2015 | | 10/5/2015 | | PASS |
David Moser
|
|
|
|
Case Summary (BLD) | | | 10/5/2015 | | |
|
|
|
|
1st review completed | | | 10/5/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/5/2015 | | DONE |
|
|
|
ALL REQUIREMENTS MET
|
Routing - FIRE | 9/28/2015 | 9/28/2015 | 9/28/2015 | | PASS |
Katie Marron
|
|
|
Revised report attached to plans
|
Plan resubmittals received | | | 9/28/2015 | | DONE |
|
|
|
Two copies of sheet 1 of 18 taken to Katie (455)
|
Routing - FIRE | 9/22/2015 | 9/15/2015 | 9/23/2015 | | FAIL |
Katie Marron
|
|
|
Comments attached to case and emailed to applicant.
|
Routing - Erosion and Sediment | 9/21/2015 | | 9/22/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 4,717 sq. ft., two story with a basement level (first story 3,606 sq. ft., second story 509 sq. ft., basement level 602 sq. ft.) single family dwelling with 6 bedrooms, 4.5 bathrooms, approximately 800 sq. ft. of covered patio/porch and a 1,257 sq. ft. attached garage
|
Routing - MECHANICAL | 9/18/2015 | | 9/21/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | | | 9/18/2015 | | PASS |
David Moser
|
|
|
CFH15-00052
|
Routing - PUBLIC WORKS | 9/17/2015 | | 9/18/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 9/15/2015 | | 9/17/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing PW Grading-Hillside | | | 9/17/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 9/15/2015 | | DONE |
|
|
|
|
Intake Approval | | | 9/15/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/15/2015 | | DONE |
|
|
|
|
Application received | | 9/14/2015 | | | |
|
|
|
|