Permit Information
Permit NumberBLD15-03313
StatusFinaled
Name HAYWARD HOMES LLC
Site Address 3691 W QUAIL HOLLOW CT
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A; Fire sprinklers are required. Permit for the construction of a new 3,282 sq. ft., one story single family dwelling with 3 bedrooms, 3 bathrooms, approximately 372 sq. ft. of covered patio/porch and a 1,497 sq. ft. attached garage per the approved plans, engineering, ACCA report and any notations. A-1 zoning and setbacks per planning.//leg *** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/17/20166/21/20166/22/2016PDONE
DetailsTony Young
Jerad Phone #: ###-####
DOC - Permit Finaled6/22/20166/22/20166/22/2016PPASS
DetailsTony Young
PubWorks Occupancy Approval6/22/20166/22/20166/22/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final6/14/20166/17/20166/17/2016PPEND
DetailsTony Young
Jerad Phone #: ###-####
BLD-Final6/13/20166/14/20166/14/2016APEND
DetailsTony Young
Jerad Phone #: ###-####
BLD-Final6/10/20166/13/20166/13/2016PPEND
DetailsTony Young
Jerad Phone #: ###-####,, ok pending hillside public works approval
BLD-Final6/9/20166/10/20166/10/2016PCANC
DetailsTony Young
Jerad Phone #: ###-####,, ok pending PW final
BLD-Final6/8/20166/9/20166/9/2016APEND
DetailsTony Young
Jerad Phone #: ###-####
BLD-Final6/7/20166/8/20166/8/2016PPEND
DetailsTony Young
Jerad Phone #: ###-####,, ok pending hillside
BLD-Aging Inspection5/26/20165/26/20165/27/2016 PEND
DetailsTony Young
BLD-Aging Inspection5/25/20165/25/20165/26/2016 PEND
DetailsTony Young
BLD-Framing/Rough-in1/11/20161/12/20161/12/2016APASS
DetailsTony Young
Jerry Phone #: ###-####
BLD-Energy code compliance1/11/20161/12/20161/12/2016APASS
DetailsTony Young
Jerry Phone #: ###-####
BLD-Other1/11/20161/12/20161/12/2016APASS
DetailsTony Young
fire soffit; Jerry Phone #: ###-####
BLD-Framing/Rough-in1/6/20161/7/20161/7/2016APART
DetailsTony Young
Jerry ###-#### Phone #: ###-#### Inspection requested via web by Jerry Hayward,, c/n, (truss bracing nailing,, girder nailing,, top plate strap, etc.) ok to insulate,, need to see soffits yet
BLD-Wall Bracing12/4/201512/4/201512/4/2015PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Jerry Hayward
Plan Modification Accepted  11/27/2015 DONE
new manual j report
Routing - MECHANICAL11/27/2015 11/27/2015 PASS
DetailsTroy James
resubmitted manual j report
BLD-Foundation10/29/201510/29/201510/29/2015PPASS
DetailsJim Sly
Bill Phone #: ###-####
BLD-Footing10/26/201510/27/201510/27/2015PPASS
DetailsTony Young
Bill Phone #: ###-####
PubWorks Subgrade Approval10/27/201510/27/201510/27/2015 DONE
DetailsJason C. Taylor

****ENTIRE FOUNDATION & COLUMNS ARE APPROVED****A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
OVERRIDE  10/21/2015  
Inspection Record Card- Bld  10/21/2015 DONE
Telephone call  10/21/2015 DONE
Left a message for Jerry informing him the permit is ready to be picked up and the fee amount that is due
Issue PAID IN FULL permit  10/21/2015 DONE
Routing - PLAN CHECK10/21/2015 10/21/2015 PASS
DetailsTisha Gallop
Case Summary (BLD)  10/21/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/21/2015 DONE
Permit Ready to Issue  10/21/2015 DONE
requirements met
Plan assigned to (LEG) Tisha9/21/2015 10/21/2015 DONE
DetailsTisha Gallop
1st review 10/12; L2
Plan Reviewer's activity  10/20/2015 DONE
DetailsAdele J Schaffeld-Griffin
***Jerry brought back resubmittals with stamps and signed plans by the engineer. All taken back to Adele. 10-20-15 blh*** spoke with Jerry, he will be comming in today to pick up re submittals, the elevations need to be on the resubmittals just like they are on the original submittals and hillside ordinance requires engineer stamp on foundations and portions of the buidling that are engineered. None of the revised sheet were engineered.
Plan resubmittals received  10/15/2015 DONE
Two copies of Engineering packet, two copies of sheets 2, 3, 4, 5 and 7. Taken to Tisha
Routing - PLAN CHECK9/28/2015 10/12/2015 FAIL
DetailsTisha Gallop
1st review completed  10/12/2015 FAIL
pending plan check
Routing - FIRE9/24/2015 9/28/2015 PASS
DetailsScott Arellano
Fire Sprinklers are required. A separate fire sprinkler permit is required. All portions of this structure shall comply with the provisions of BMC 7-01-69 section 4920 for defensible space for wildland fire, and are subject to Fire Department inspection.
Routing - MECHANICAL9/25/2015 9/25/2015 PASS
DetailsTroy James
Routing - PLANNING9/24/2015 9/24/2015 PASS
DetailsColleen T Carroll
Applicant provided easement.
Driveway width can not exceed 33' in front setback!
Routing - MECHANICAL  9/24/2015 FAIL
emailed rubin corrections
Routing - Erosion and Sediment9/24/2015 9/24/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

Permit for the construction of a new 3,282 sq. ft., one story single family dwelling with 3 bedrooms, 3 bathrooms, approximately 188 sq. ft. of covered patio/porch and a 1,497 sq. ft. attached garage per the approved plans, plan review report and any notations.
Routing PW Grading-Hillside  9/23/2015 PASS
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.

Routing PW Sewer Rating9/23/2015 9/23/2015 PASS
DetailsConnie Baumgartner
Routing - Addressing9/21/2015 9/23/2015 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS9/21/2015 9/23/2015 PASS
DetailsConnie Baumgartner
Routing - PLANNING9/23/2015 9/23/2015 FAIL
DetailsColleen T Carroll
Does not meet the WUI requirement on east side
Plans ACCEPTED BY PLAN TECH  9/21/2015 DONE
Intake Approval  9/21/2015 PASS
Recd Pcfee & Taken To Pln CK  9/21/2015 DONE
Intake Approval  9/14/2015 FAIL
DetailsChristina Prado
Need engineers stamp on faoundation sheet as well as structural calcs, all other requirements met
Application received 9/14/2015