Third Notice | | 9/17/2016 | 10/4/2016 | | DONE |
|
|
|
This permit finaled on the web by Kelsey Stickney
|
Second Notice | | 8/20/2016 | 9/12/2016 | | DONE |
|
|
|
Mailed 9-13-16
|
First Notice | | 6/19/2016 | 8/10/2016 | | DONE |
|
|
|
Mailed 7-15-16 and again 8-11-16
|
Permanent Occupancy | | | 6/9/2016 | | DONE |
|
|
|
|
Telephone call | | | 5/27/2016 | | DONE |
|
|
|
called to let know they need to come get the perm c of o and take care of the bond-left message on work phone
|
BLD-Aging Inspection | 4/18/2016 | 4/18/2016 | 4/18/2016 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 4/18/2016 | 4/18/2016 | 4/18/2016 | A | PASS |
Jim Storey
|
|
|
|
Zoning Approval | 3/21/2016 | 3/21/2016 | 3/21/2016 | | DONE |
Andrea Tuning
|
|
|
|
Temporary Occupancy | 2/18/2016 | 5/18/2016 | 2/18/2016 | | DONE |
Candy A. Nichols
|
|
|
Pending Structural and Zoning-please call when ready for inspections
|
BLD-Final | 2/16/2016 | 2/17/2016 | 2/17/2016 | P | PART |
Jim Storey
|
|
|
would like call ahead; Chelsea Phone #: ###-#### 3 handrail extitions/ 1.5 grip clerance
|
Zoning Approval Temp | 2/16/2016 | 2/16/2016 | 2/16/2016 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 2/5/2016 | 2/8/2016 | 2/8/2016 | A | PASS |
Jim Page
|
|
|
Previously notated items addressed/repaired. No Fire sprinklers, fire alarms are stan alone and tested, fire extinguishers have current inspection tag. Life fire safety passed/complete.
|
FIRE-Final Inspection | 2/2/2016 | 2/4/2016 | 2/4/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware for Door 111A , provide exit discharge light at south exit door, provide correct remote annunciators for the duct smoke detectors and test. Mechanical inspector approved pizza ovens not to be type 1.
|
BLD-Final | 12/17/2015 | 12/17/2015 | 12/17/2015 | P | NR |
Jim Storey
|
|
|
Insulation // Kelsey Phone #: ###-#### pending others for cover
|
BLD-Energy code compliance | 12/17/2015 | 12/17/2015 | 12/17/2015 | P | PART |
Jim Storey
|
|
|
Insulation // Kelsey Phone #: ###-####
|
BLD-Framing/Rough-in | 12/8/2015 | 12/9/2015 | 12/9/2015 | A | PART |
Jim Storey
|
|
|
Kelsey Phone #: ###-#### c/n made ok //ok to cover all areas othere than restaroom and ceilling with hvac.
|
BLD-Footing | 12/4/2015 | 12/8/2015 | 12/8/2015 | A | PASS |
Jim Storey
|
|
|
Dustin Phone #: ###-####
|
BLD-Framing/Rough-in | 11/30/2015 | 11/30/2015 | 11/30/2015 | P | PART |
Jim Storey
|
|
|
Kelsie Phone #: ###-#### need insulation backing covered or removed to meet flame spread/ fire blk ceilling unusable spaces/ seal air top bottom penatrations./ need plm permit/ backing for ada.
|
Print Occupancy Form | | | 11/20/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/20/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/20/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 11/18/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 9/28/2015 | 9/28/2015 | 11/18/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Level 3 TI - ePlanReview - Flying Pie Pizzaria
|
Routing PW Solid Waste | 11/18/2015 | | 11/18/2015 | | PASS |
Peter J. McCullough
|
|
|
signed off in e plan, gate to be replaced
|
Routing - PLAN CHECK | 11/18/2015 | | 11/18/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/18/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Permit Ready to Issue | | | 11/18/2015 | | DONE |
|
|
|
***11-20-15 scanned in GC form so just need RP and rev cert of val CAN****need the RP, GC and rev cert of val from GC
|
Routing - PLAN CHECK | 11/6/2015 | | 11/17/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
pending pw solid waste
|
Routing - MECHANICAL | 11/16/2015 | | 11/16/2015 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 11/6/2015 | | 11/10/2015 | | FAIL |
Troy James
|
|
|
eplan
|
Routing - Erosion and Sediment | 11/6/2015 | | 11/9/2015 | | PASS |
Evan Jenkins
|
|
|
(FLYING PIE PIZZARIA) Major interior remodel of the old Buster's Grill and Bar. Upgrades to the interior flooring, walls, and ceiling. New amenities to be added to match existing Flying Pie services and features. Facade upgrades. West elevation receiving major changes with a new entry, new concrete patio, and bar/fireplace seating outdoors.
|
Routing - Design Review | 11/6/2015 | | 11/6/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Solid Waste | 11/6/2015 | | 11/6/2015 | | FAIL |
Megan Durrell
|
|
|
Need site plan illustrating trash/recycle enclosure and service location. Existing trash enclosure needs improvements.
|
Routing PW Solid Waste | 9/29/2015 | | 10/23/2015 | | FAIL |
Megan Durrell
|
|
|
Trash enclosure must be rebuilt and/or relocated to meet current standards
comments in e plan
|
1st review completed | | | 10/23/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - C.D.H | 9/28/2015 | | 10/23/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 9/28/2015 | | 10/23/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Street Lights | 9/29/2015 | | 10/2/2015 | | PASS |
Mike D Hedge
|
|
|
No new street lighting required.
|
Routing PW Sewer Rating | 9/29/2015 | | 10/1/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Drainage | 9/29/2015 | | 9/30/2015 | | PASS |
Brian Murphy
|
|
|
EXISTING PARKING LOT TO REMAIN
|
Routing - MECHANICAL | 9/28/2015 | | 9/30/2015 | | FAIL |
Troy James
|
|
|
|
Routing - FIRE | 9/28/2015 | 9/28/2015 | 9/29/2015 | | PASS |
Scott Arellano
|
|
|
Report attached to case.
|
Routing PW Environmental | 9/29/2015 | | 9/29/2015 | | PASS |
Rick Christenson
|
|
|
Plumbing Contractor to verify Exterior Grease Interceptor is working properly.
|
Routing - PLUMBING | 9/28/2015 | | 9/29/2015 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - PUBLIC WORKS | 9/28/2015 | | 9/29/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 9/28/2015 | | 9/28/2015 | | FAIL |
Evan Jenkins
|
|
|
ESC Waiver Letter Request Required for Approval along with a Required ESC Permit: Evan Jenkins 794.3958
|
Routing - Design Review | 9/28/2015 | | 9/28/2015 | | FAIL |
Andrea Tuning
|
|
|
The applicant show install van accessible parking and eliminate the loading area.
Andrea Tuning - DRH15-00264
|
Routing - Addressing | 9/28/2015 | | 9/28/2015 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 9/28/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Javier Guzman and plan review fees paid.
|
Pending Assignment by JCB | 9/28/2015 | | 9/28/2015 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 9/25/2015 | | FAIL |
Javier Guzman
|
|
|
Please provide the following:
1. All plans stamped and signed by an Idaho licensed architect
2. Per ePlan submittals all plans must be uploaded in “Landscape” format in the horizontal position.
3. Central District Health Department (CDHD) provide a completed Food Establishment License application and Food Establishment Plan Review and Approval form for any building where food is prepared, manufactured or stored. Form is available at: http://www.cdhd.idaho.gov/EH/food/forms.htm. submittal does NOT require a trip to CDHD if submitting electronically, however, CDHD may require a separate meeting for specific cases.
|
Application received | | | 9/14/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 14 2015 10:30AM
|