Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-03318
StatusFinaled
Name EKC INC
Site Address 720 E PARK BLVD Unit: 107
Project NameBMC TI suite #107
Customer NumberBLD15-03301 & BLD15-00319
ePlanReviewNo
Description
**(BMC – WASHINGTON GROUP CENTRAL PLAZA – Suite #107)** Permit is to remodel an existing 2,366 sq. ft. tenant space previously permitted under BLD04-01656. Approval contingent upon adhering to the approved plans on file. Work to include: installation of a new nonbearing wall to create 1 office, new door opening at office 107-5, new office furniture with electrical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/20/201510/21/201510/21/2015APASS
DetailsDave Hannah
Tim Phone #: ###-####
FIRE-Final Inspection10/19/201510/20/201510/20/2015APASS
DetailsJim Page
Life fire safety passed/complete
FIRE-Final Inspection10/2/201510/5/201510/5/2015APART
DetailsJim Page
Partial final life fire safety passed/complete, contractor Tim, phone number ###-####, will schedule a final inspection once all office furniture/fixtures are in place. One fire sprinkler head needs to be moved to accomidate new wall, currently fire sprinkler is spaced to far off of wall.
BLD-Framing/Rough-in9/21/20159/22/20159/22/2015APASS
DetailsMike Jordan
Tim// please call 20 min prior Phone #: ###-####
Print Occupancy Form  9/21/2015 DONE
Issue PAID IN FULL permit  9/21/2015 DONE
Plan assigned to (JG)9/14/20159/14/20159/16/2015 PASS
DetailsJavier Guzman
9/18 L1 BMC TI suite #107
Routing - PUBLIC WORKS9/14/2015 9/16/2015 PASS
DetailsBeverly Mountain
Routing - PLAN CHECK9/14/2015 9/16/2015 PASS
DetailsJavier Guzman
1st review completed  9/16/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  9/16/2015 DONE
Permit Ready to Issue  9/16/2015 DONE
NEED GC and Cert of value-requirements met-CAN scanned
Routing - Addressing9/14/2015 9/14/2015 PASS
DetailsEmily Dixon
Application received 9/14/2015