BLD-Final | 3/25/2016 | 3/28/2016 | 3/28/2016 | A | PASS |
Tony Young
|
|
|
3283 Inspection requested via web by David Wipper
|
DOC - Permit Finaled | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 3/23/2016 | 3/24/2016 | 3/24/2016 | A | NR |
Jim Storey
|
|
|
Larry Phone #: ###-#### open mech
|
PubWorks Occupancy Approval | 3/23/2016 | 3/23/2016 | 3/23/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
FIRE-Final Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 | P | PASS |
Jim Page
|
|
|
Drive way width inspection passed/complete
|
BLD-Other | 12/8/2015 | 12/9/2015 | 12/9/2015 | A | PASS |
Tony Young
|
|
|
Larry// fire soffit Phone #: ###-####
|
BLD-Energy code compliance | 12/7/2015 | 12/8/2015 | 12/9/2015 | P | PASS |
Tony Young
|
|
|
Larry Phone #: ###-####
|
BLD-Other | 12/7/2015 | 12/8/2015 | 12/8/2015 | P | PART |
Tony Young
|
|
|
Larry// fire soffit Phone #: ###-####,, work in progress
|
BLD-Framing/Rough-in | 12/2/2015 | 12/2/2015 | 12/2/2015 | P | PASS |
Tony Young
|
|
|
Larry Phone #: ###-####,, ok to insulate
|
BLD-Wall Bracing | 11/6/2015 | 11/6/2015 | 11/6/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by David Wipper
|
BLD-Foundation | 10/8/2015 | 10/9/2015 | 10/9/2015 | A | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, late am
|
BLD-Footing | 10/8/2015 | 10/8/2015 | 10/8/2015 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-####
|
BLD-Footing | 10/7/2015 | 10/8/2015 | 10/8/2015 | A | NR |
Tony Young
|
|
|
Chris Phone #: ###-####,, need soils report
|
PubWorks Subgrade Approval | 10/8/2015 | 10/8/2015 | 10/8/2015 | | DONE |
Jason C. Taylor
|
|
|
*ALL MAIN LEVEL FOUNDATIONS***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
(F) Reprint permit | | | 10/7/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 10/5/2015 | | |
|
|
|
|
Plan assigned to (DAF) | 9/18/2015 | 9/18/2015 | 10/5/2015 | | PASS |
David Ferguson
|
|
|
due 10/8 L2 ePlan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/5/2015 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Issue PAID IN FULL permit | | | 10/5/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/5/2015 | | DONE |
|
|
|
|
Routing - FIRE | 10/2/2015 | 10/2/2015 | 10/2/2015 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing - PLAN CHECK | 9/29/2015 | | 9/29/2015 | | PASS |
David Ferguson
|
|
|
|
1st review completed | | | 9/25/2015 | | DONE |
David Ferguson
|
|
|
Missing sections for WUI compliance
|
Routing - PLAN CHECK | 9/17/2015 | | 9/25/2015 | | FAIL |
David Ferguson
|
|
|
|
Routing PW Grading-Hillside | 9/17/2015 | | 9/23/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - FIRE | 9/17/2015 | 9/17/2015 | 9/21/2015 | | FAIL |
Katie Marron
|
|
|
Comments attached to case and emailed to applicant.
|
Routing - MECHANICAL | 9/17/2015 | | 9/18/2015 | | PASS |
Troy James
|
|
|
|
Plan assigned to (LEG) Tisha | 9/17/2015 | | 9/18/2015 | | DEFR |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/17/2015 | | DONE |
|
|
|
|
Intake Approval | | | 9/17/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/17/2015 | | DONE |
|
|
|
|
Routing - PLANNING | 9/17/2015 | | 9/17/2015 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 9/17/2015 | | 9/17/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 9/17/2015 | | 9/17/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 9/17/2015 | | 9/17/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 2714 sq. ft., two story (first story 2164 sq. ft., second story 550 sq. ft.) single family dwelling with 5 bedrooms, 3 bathrooms, approximately 305 sq. ft. of covered patio/porch and a 1480 sq. ft. attached garage
|
Application received | | | 9/14/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 14 2015 12:23PM
|