Permit Information
Permit NumberBLD15-03325
StatusIssued
Name TITAN POOLS
Site Address 238 N ALTO VIA CT
Project Name 
Customer Number 
ePlanReviewNo
Description
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946. Evan said that the ESC plan for the main house could also be used for this pool permit. **DAF**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection9/21/20169/21/20169/22/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection9/22/20169/22/20169/22/2016 PEND
DetailsDave Hannah
BLD-Final5/6/20165/9/20165/10/2016AFAIL
DetailsDave Hannah
Bernie Phone #: ###-#### no fench around pool
BLD-Conference3/17/20163/17/20163/17/2016PPASS
DetailsDave Hannah
PubWorks Subgrade Approval3/15/20163/15/20163/15/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Foundation3/10/20163/11/20163/11/2016PPEND
DetailsDave Hannah
would like call ahead; Rebar pool // James Phone #: ###-#### ok after geo tech is signed off
OVERRIDE  10/7/2015  
Issue PAID IN FULL permit  10/7/2015 DONE
Routing - PLAN CHECK10/7/2015 10/7/2015 PASS
DetailsDavid Ferguson
Inspection Record Card- Bld  10/7/2015 DONE
DetailsDavid Ferguson
Case Summary (BLD)  10/7/2015 DONE
DetailsDavid Ferguson
Case Summary (BLD)  10/7/2015 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  10/7/2015 DONE
Permit Ready to Issue  10/7/2015 DONE
all requirments met
Routing Walk-In (BLD)9/15/20159/15/20159/15/2015PFAIL
DetailsDavid Ferguson
Routed to Evan for approval
Routing Walk-In (Zoning)9/14/20159/14/20159/14/2015PDONE
DetailsSue Cummings
Routing Walk-In (BLD)9/14/20159/14/20159/14/2015PFAIL
DetailsTisha Gallop
need structural engineering
Routing Walk-In (PW Hillside)9/14/20159/14/20159/14/2015PPASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
1st review completed  9/14/2015 FAIL
DetailsTisha Gallop
Application received 9/14/2015   
Routing - Erosion and Sediment9/15/2015