Second Notice | | 10/5/2017 | 10/3/2017 | | DONE |
|
|
|
This permit finaled on the web by Ami Tracy
|
First Notice | | 9/18/2017 | 9/25/2017 | | DONE |
|
|
|
|
BLD-Final | 9/8/2017 | 9/8/2017 | 9/8/2017 | P | PASS |
Dave Hannah
|
|
|
for perm occ
|
DOC - Permit Finaled | | | 9/8/2017 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/7/2017 | 9/7/2017 | 9/7/2017 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection passed/complete
|
BLD-Final | 8/30/2017 | 8/31/2017 | 8/31/2017 | A | CANC |
Dave Hannah
|
|
|
Final for 201 and 202 Phone #: ###-#### Inspection requested via web by Ami Tracy
|
BLD-Final | 8/21/2017 | 8/22/2017 | 8/22/2017 | P | PART |
Dave Hannah
|
|
|
First level town homes Phone #: ###-#### Inspection requested via web by Ami Tracy ok to occ units 105,106 and 107
|
BLD-Framing/Rough-in | 6/26/2017 | 6/26/2017 | 6/26/2017 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ami Tracy
|
Zoning Approval Temp | 6/14/2017 | 6/14/2017 | 6/14/2017 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Conference | 6/12/2017 | 6/12/2017 | 6/12/2017 | P | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ami Tracy
|
BLD-Energy code compliance | 5/26/2017 | 5/30/2017 | 5/30/2017 | A | PASS |
Dave Hannah
|
|
|
6th Floor Trash Chute Phone #: ###-#### Inspection requested via web by Ami Tracy
|
BLD-Energy code compliance | 5/22/2017 | 5/23/2017 | 5/23/2017 | A | PEND |
Dave Hannah
|
|
|
1st floor - Jason Phone #: ###-####
|
BLD-Energy code compliance | 5/5/2017 | 5/5/2017 | 5/7/2017 | P | PART |
Dave Hannah
|
|
|
6th Floor Trash Chute Phone #: ###-#### Inspection requested via web by Ami Tracy
|
BLD-Conference | 4/12/2017 | 4/17/2017 | 4/17/2017 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ami Tracy
|
BLD-Framing/Rough-in | 3/16/2017 | 3/17/2017 | 3/17/2017 | A | PEND |
Dave Hannah
|
|
|
Trash Chute Walls Phone #: ###-#### Inspection requested via web by Ami Tracy ok to cover all but for sixth floor shaft does not up though attic must cut attic trusses to get shaft though roof
|
BLD-Energy code compliance | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | NR |
Dave Hannah
|
|
|
6th Floor Rescheduled Phone #: ###-#### Inspection requested via web by Ami Tracy
|
BLD-Wall cover | 2/20/2017 | 2/21/2017 | 2/21/2017 | A | PART |
Jim Sly
|
|
|
Level 6 Ceiling.....and Townhome insulation...3 units Phone #: ###-#### Inspection requested via web by Ami Tracy
|
BLD-Energy code compliance | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | PASS |
Dave Hannah
|
|
|
6th Floor Insulation Phone #: ###-#### Inspection requested via web by Ami Tracy
|
BLD-Energy code compliance | 2/1/2017 | 2/2/2017 | 2/2/2017 | A | NR |
Dave Hannah
|
|
|
6th Floor Insulation Phone #: ###-#### Inspection requested via web by Ami Tracy
|
BLD-Energy code compliance | 1/30/2017 | 1/30/2017 | 1/30/2017 | P | PASS |
Dave Hannah
|
|
|
Insultion // Jason Phone #: ###-####
|
BLD-Energy code compliance | 1/26/2017 | 1/27/2017 | 1/27/2017 | A | PASS |
Dave Hannah
|
|
|
Unit 601 insulation - Jesse will be on site Phone #: ###-#### Inspection requested via web by Ami Tracy
|
BLD-Energy code compliance | 12/30/2016 | 1/3/2017 | 1/3/2017 | A | PASS |
Dave Hannah
|
|
|
6th Floor Ceilings Phone #: ###-#### Inspection requested via web by Ami Tracy
|
BLD-Ceiling Grid Inspection | 12/27/2016 | 12/28/2016 | 12/28/2016 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### 5th floor drops ok to cover
|
BLD-Energy code compliance | 12/22/2016 | 12/22/2016 | 12/22/2016 | P | PART |
Dave Hannah
|
|
|
Insulation Phone #: ###-#### Inspection requested via web by Ami Tracy ok to cover 501-504
|
BLD-Energy code compliance | 12/20/2016 | 12/20/2016 | 12/20/2016 | P | PART |
Dave Hannah
|
|
|
Insulation // Jason Phone #: ###-#### second floor two east apts ok to cover walls
|
BLD-Conference | 12/15/2016 | 12/15/2016 | 12/16/2016 | P | PART |
Dave Hannah
|
|
|
5th Floor Framing Phone #: ###-#### Inspection requested via web by Ami Tracy second floor live work units two on th eastend ok to cover ext walls and one side int need to check floor pens and fire wall pens 4th floor west uint ok to cover all but for mec chase by front door
|
BLD-Wall cover | 12/2/2016 | 12/2/2016 | 12/2/2016 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ami Tracy
|
BLD-Conference | 12/1/2016 | 12/1/2016 | 12/2/2016 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ami Tracy furred downs on 4th floor
|
BLD-Framing/Rough-in | 11/17/2016 | 11/18/2016 | 11/18/2016 | P | PASS |
Dave Hannah
|
|
|
Level 1,2 & 5 - Jason Phone #: ###-####
|
BLD-Energy code compliance | 11/17/2016 | 11/18/2016 | 11/18/2016 | P | PART |
Dave Hannah
|
|
|
Level 4 insulation - Jason Phone #: ###-#### first two units ok to cover
|
BLD-Framing/Rough-in | 11/14/2016 | 11/15/2016 | 11/15/2016 | A | PART |
Dave Hannah
|
|
|
4th Floor Phone #: ###-#### Inspection requested via web by Ami Tracy ok to insulate
|
BLD-Wall Bracing | 11/14/2016 | 11/15/2016 | 11/15/2016 | A | PASS |
Dave Hannah
|
|
|
4th Floor Phone #: ###-#### Inspection requested via web by Ami Tracy signed off by mti
|
BLD-Framing/Rough-in | 11/14/2016 | 11/14/2016 | 11/14/2016 | P | DEFR |
Mike Jordan
|
|
|
4th Floor Phone #: ###-#### Inspection requested via web by Ami Tracy. OUt of time.
|
BLD-Energy code compliance | 11/10/2016 | 11/10/2016 | 11/10/2016 | P | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### 3rd fl ok to cover
|
BLD-Energy code compliance | 11/8/2016 | 11/9/2016 | 11/9/2016 | A | PEND |
Dave Hannah
|
|
|
Insulation // Jason Phone #: ###-#### walls ok but need to finish fire cualking in drop ceilings
|
BLD-Energy code compliance | 11/7/2016 | 11/8/2016 | 11/8/2016 | A | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### 3rd floor walls ok
|
BLD-Framing/Rough-in | 11/2/2016 | 11/2/2016 | 11/3/2016 | P | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### ok to insulate walls 3rd floor
|
BLD-Framing/Rough-in | 10/25/2016 | 10/26/2016 | 10/26/2016 | A | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Energy code compliance | 10/17/2016 | 10/17/2016 | 10/18/2016 | P | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### ceilings 5th floor
|
BLD-Energy code compliance | 10/12/2016 | 10/13/2016 | 10/13/2016 | A | NR |
Phil Shearer
|
|
|
Jason Phone #: ###-####
|
BLD-Energy code compliance | 9/21/2016 | 9/22/2016 | 9/22/2016 | A | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Energy code compliance | 9/14/2016 | 9/15/2016 | 9/15/2016 | A | PART |
Dave Hannah
|
|
|
Unit 304 & 305 - Jason Phone #: ###-#### ceilings sheetrock also ok
|
BLD-Energy code compliance | 9/14/2016 | 9/14/2016 | 9/14/2016 | P | DEFR |
Jim Storey
|
|
|
Unit 304 & 305 - Jason Phone #: ###-#### out of time
|
BLD-Energy code compliance | 9/8/2016 | 9/8/2016 | 9/8/2016 | P | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### ceilings in first 4 rooms
|
BLD-Framing/Rough-in | 9/2/2016 | 9/6/2016 | 9/6/2016 | A | PASS |
Dave Hannah
|
|
|
Roof - Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 8/24/2016 | 8/24/2016 | 8/24/2016 | P | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### roof sheeting ok to cover
|
BLD-Framing/Rough-in | 8/15/2016 | 8/16/2016 | 8/16/2016 | A | PASS |
Mike Jordan
|
|
|
Nathan Phone #: ###-####. 1st and 2nd. floor exterior steel stud framed walls ok to cover exterior side only.
|
BLD-Framing/Rough-in | 8/3/2016 | 8/4/2016 | 8/5/2016 | A | NR |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 8/3/2016 | 8/3/2016 | 8/3/2016 | P | DEFR |
Jim Storey
|
|
|
Jason Phone #: ###-#### out of time rolled to am
|
BLD-Conference | 6/30/2016 | 6/30/2016 | 6/30/2016 | P | PASS |
Dave Hannah
|
|
|
Two hour radiant // Jason Phone #: ###-####
|
BLD-Conference | 6/8/2016 | 6/9/2016 | 6/9/2016 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Conference | 6/6/2016 | 6/7/2016 | 6/7/2016 | A | PASS |
Dave Hannah
|
|
|
Requests 9AM - Jason Phone #: ###-####
|
BLD-Foundation | 5/2/2016 | 5/2/2016 | 5/3/2016 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Framing/Rough-in | 3/10/2016 | 3/11/2016 | 3/14/2016 | A | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-#### frist level pt dick work in progress mti will signoff this afternoon
|
BLD-Other | 3/9/2016 | 3/9/2016 | 3/10/2016 | P | NR |
Dave Hannah
|
|
|
Jason-post tension deck Phone #: ###-####
|
BLD-Foundation | 2/18/2016 | 2/18/2016 | 2/19/2016 | P | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Foundation | 2/10/2016 | 2/10/2016 | 2/11/2016 | P | DEFR |
Mike Jordan
|
|
|
Jason Phone #: ###-####. As per Jason foundation already placed. he noted that foundation had special inspection. Inspection was scheduled for 2-10. Did not recieve request until this afternoon.
|
BLD-Footing | 1/29/2016 | 2/1/2016 | 2/4/2016 | P | PEND |
Dave Hannah
|
|
|
Rebar for columns & footings - Jason Phone #: ###-#### ok after s/i sign off
|
BLD-Foundation | 1/25/2016 | 1/25/2016 | 1/28/2016 | P | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Footing | 1/21/2016 | 1/22/2016 | 1/22/2016 | A | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-#### ok after spec/insp sign off
|
BLD-Foundation | 1/11/2016 | 1/11/2016 | 1/15/2016 | P | PASS |
Dave Hannah
|
|
|
Jason-shear walll rebar and column rebar Phone #: ###-####
|
BLD-Footing | 1/6/2016 | 1/7/2016 | 1/7/2016 | A | PEND |
Dave Hannah
|
|
|
Jay-footings, calumns & Shear walls Phone #: ###-####
|
BLD-Foundation | 12/31/2015 | 12/31/2015 | 1/4/2016 | P | PEND |
Dave Hannah
|
|
|
Rebar // Jason Phone #: ###-####
|
BLD-Foundation | 12/29/2015 | 12/30/2015 | 12/31/2015 | P | PART |
Dave Hannah
|
|
|
Rebar // Jason Phone #: ###-#### ok after mti sign off
|
BLD-Foundation | 12/21/2015 | 12/22/2015 | 12/23/2015 | P | PART |
Dave Hannah
|
|
|
rebar; Jason Phone #: ###-#### ok after mti does final on rebar
|
Issue PAID IN FULL permit | | | 11/12/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/12/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/12/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 10/30/2015 | | |
|
|
|
|
Plan assigned to (CJW) | 9/16/2015 | 9/16/2015 | 10/30/2015 | | PASS |
Carl Westfall
|
|
|
(1st done) AFTON PODIUM (Oct 5 - 15 days)
|
Routing - PLAN CHECK | 10/27/2015 | | 10/30/2015 | | PASS |
Carl Westfall
|
|
|
Podium phase approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/30/2015 | | DONE |
|
|
|
***ALL REQUIRMENTS MET 11-12-15 CEV Needs; ACHD approval
|
Routing Off Site - STRUCTURAL | 10/27/2015 | | 10/29/2015 | | PASS |
Carl Westfall
|
|
|
Jared Bauder
|
Plan resubmittals received | | | 10/27/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/14/2015 | | 10/21/2015 | | PASS |
Carl Westfall
|
|
|
Last item resolved
|
Plan resubmittals requested | | | 10/21/2015 | | DONE |
|
|
|
|
Routing - PLUMBING | 10/14/2015 | | 10/20/2015 | | PASS |
Bill VanDegrift
|
|
|
Bill Vandegrift
|
Routing Off Site - STRUCTURAL | 10/14/2015 | | 10/19/2015 | | FAIL |
Carl Westfall
|
|
|
Jared Bauder with CH2M Hill
|
Routing PW Sewer Design | 10/14/2015 | | 10/15/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Kyle Rosenmeyer
|
Plan resubmittals received | | | 10/14/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/14/2015 | | 10/14/2015 | | FAIL |
Carl Westfall
|
|
|
Item #2 is not resolved
|
Routing - FIRE | 10/14/2015 | | 10/14/2015 | | PASS |
Katie Marron
|
|
|
Updated report attached to case.
|
Routing - Design Review | 10/14/2015 | | 10/14/2015 | | PASS |
Josh Wilson
|
|
|
Ok- podium only.
|
Route to Impact Fee Review | 10/6/2015 | 10/9/2015 | 10/7/2015 | | PASS |
Cindy M. Gould
|
|
|
No commercial or dwellings on this phase of th project.
|
Routing PW Environmental | 9/16/2015 | | 10/6/2015 | | PASS |
Rick Christenson
|
|
|
Interceptor shown for future use.
|
1st review completed | | | 10/6/2015 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 10/6/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/16/2015 | | 10/6/2015 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing - FIRE | 9/16/2015 | | 10/6/2015 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing PW Drainage | 9/16/2015 | | 10/5/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 9/16/2015 | | 9/30/2015 | | FAIL |
Carl Westfall
|
|
|
Jared Bauder with CH2M Hill
|
Routing PW Street Lights | 9/16/2015 | | 9/25/2015 | | PASS |
Rob Bousfield
|
|
|
|
Routing PW Sewer Design | 9/16/2015 | | 9/25/2015 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Please update sewer standard notes to the October 2014 version, available on City of Boise's website.
Type C connection for 6" Services not allowed. 2% minimum slope required inside Public Works easement area.
|
Routing - Design Review | 9/25/2015 | | 9/25/2015 | | PASS |
Josh Wilson
|
|
|
Ok for concrete podium only.
|
Routing - Addressing | 9/16/2015 | | 9/21/2015 | | PASS |
Emily Dixon
|
|
|
Correct address is 611 S 8th St. 32 additional address for apartments and suites.
|
Routing PW Geothermal | 9/16/2015 | | 9/18/2015 | | PASS |
Jon R. Gunnerson
|
|
|
Not using geothermal.
|
Routing - Design Review | 9/18/2015 | | 9/18/2015 | | FAIL |
Josh Wilson
|
|
|
Drawings including building elevations, site plan, landscape plan, and floor plans do not match approved drawings for DRH14-00262. Please submit revised drawings or apply for a Modification to DRH14-00262.
|
Routing - PLUMBING | 9/16/2015 | | 9/17/2015 | | FAIL |
Daryl Spivey
|
|
|
1) address suds relief through out
2) vent interceptors
|
Routing - PLANNING Land Div | 9/16/2015 | | 9/16/2015 | | PASS |
Dave Abo
|
|
|
Parcel A of ROS 10203.
|
Pending Assignment by TLW | 9/16/2015 | | 9/16/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 9/16/2015 | | 9/16/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 9/16/2015 | | 9/16/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Afton condominiums - Phase I, 28 condos, retail and 2-story parking structure (This phase includes only the concrete podium)
|
Plan Reviewer's activity | | | 9/15/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Spoke with Dave, verificationof legal lot form completed.
|
Plan Reviewer's activity | | | 9/15/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Spoke with Josh Wilson, planning good to take in podium.
|
Intake Approval | | | 9/15/2015 | | PASS |
|
|
|
|
Application received | | | 9/14/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 14 2015 3:24PM
|