Print Statement | | | 10/18/2016 | | DONE |
|
|
|
|
Third Notice | | 9/24/2016 | 10/10/2016 | | DONE |
|
|
|
sent with a letter
|
Third Notice | | 8/16/2016 | 9/19/2016 | | DONE |
|
|
|
|
Third Notice | | 7/16/2016 | 8/11/2016 | | DONE |
|
|
|
|
Second Notice | | 6/20/2016 | 7/11/2016 | | DONE |
|
|
|
Mailed 7-12-16
|
First Notice | | 5/23/2016 | 6/10/2016 | | DONE |
|
|
|
Mailed 6-13-16
|
Print Occupancy Form | | | 5/13/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/13/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/13/2016 | | DONE |
|
|
|
|
BLD-Final | 5/12/2016 | 5/12/2016 | 5/12/2016 | P | PASS |
Mike Jordan
|
|
|
David Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 5/9/2016 | 5/9/2016 | 5/9/2016 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Zoning Approval | 5/6/2016 | 5/6/2016 | 5/6/2016 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Conference | 5/4/2016 | 5/4/2016 | 5/4/2016 | P | DONE |
Mike Jordan
|
|
|
David Phone #: ###-####. walk through with contractor. Noted vertcal grab bars installed to far from rear wall. New handrails not yet installed.
|
BLD-Ceiling Grid Inspection | 4/8/2016 | 4/8/2016 | 4/8/2016 | P | PASS |
Mike Jordan
|
|
|
David Phone #: ###-####
|
BLD-Conference | 3/23/2016 | 3/23/2016 | 3/23/2016 | P | PASS |
Mike Jordan
|
|
|
David Phone #: ###-####. Went over new ADA ramp. prior to concrete placement.
|
BLD-Conference | 3/21/2016 | 3/21/2016 | 3/21/2016 | P | DONE |
Mike Jordan
|
|
|
David Phone #: ###-####. noted new ADA ramp at south side of building has greater than 9% slope.
|
BLD-Conference | 3/14/2016 | 3/15/2016 | 3/15/2016 | A | DONE |
Mike Jordan
|
|
|
David Phone #: ###-####
|
BLD-Conference | 2/16/2016 | 2/17/2016 | 2/17/2016 | A | DONE |
Mike Jordan
|
|
|
|
BLD-Wall cover | 2/16/2016 | 2/17/2016 | 2/17/2016 | A | PART |
Mike Jordan
|
|
|
David Phone #: ###-####. Reviewed new 1hr. wall details. Contractor to get detail for 1hr. roof ceiling.
|
BLD-Conference | 2/16/2016 | 2/16/2016 | 2/16/2016 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 2/11/2016 | 2/12/2016 | 2/12/2016 | P | PART |
Jim Storey
|
|
|
David// prefers as late as possible Phone #: ###-#### ok to cover all BUT gas rm need fire barrior details for opening protection and roof listing 1 hr / fire riser rm opening protection
|
CHANGE STATUS TO (ISS) | | | 2/11/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/11/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 2/10/2016 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/10/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/10/2016 | | DONE |
Christina Prado
|
|
|
DO NOT RE-ISSUE - PLAN MOD APPROVED 2/10/16 - All requirements met for Plan Mod
Applicant must pay plan mod fees in full prior to changing status to ISS
|
Plan assigned to (JG) | 2/4/2016 | | 2/10/2016 | | PASS |
Javier Guzman
|
|
|
Plan Mod - River City Surgical Center
|
Routing - PLAN CHECK | 2/8/2016 | | 2/10/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 2/8/2016 | 2/8/2016 | 2/8/2016 | | PASS |
Scott Arellano
|
|
|
Modifications to room sizes reviewed. No additional comments required.
|
Plan Modification Accepted | | | 2/4/2016 | | DONE |
Christina Prado
|
|
|
Plan Mod to enlarge the exisitng operating rooms which results in various rooms including storage, restrooms and office rooms reducing in size
|
FIRE-Conference | 12/23/2015 | 12/23/2015 | 12/23/2015 | P | DONE |
Jim Page
|
|
|
Discussed exit signage/egress lighting and direction of travel per city approved plans. Slight modification for exit lights will be made before final inspection.
|
Issue PAID IN FULL permit | | | 12/4/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/4/2015 | | DONE |
|
|
|
|
Plan assigned to (JG) | 9/25/2015 | 9/25/2015 | 11/3/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 10/21 Level 3 TI - ePlanReview - River City Surgical Center, pendng fire
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/3/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/3/2015 | | DONE |
Christina Prado
|
|
|
***ALL REQUIRMENTS MET 12-3-15 /CEV Need GC, Revised Certificate of value for issuance
|
Routing - FIRE | 11/2/2015 | 11/2/2015 | 11/2/2015 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing - PLAN CHECK | 10/27/2015 | | 10/27/2015 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 10/15/2015 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - PLAN CHECK | 9/25/2015 | | 10/15/2015 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - Erosion and Sediment | 9/25/2015 | | 9/30/2015 | | PASS |
Evan Jenkins
|
|
|
(RIVER CITY SURGICAL CENTER) THE OWNER OF A 2808 SF SINGLE STORY COMMERCIAL BUILDING IS PROPOSING TENANT IMPROVEMENTS CONSISTING OF REMOVING AND ADDING INTERIOR WALLS, RELOCATING OR ADDING EXTERIOR DOORS, AND ADDING ADA ACCESS.
|
Routing - FIRE | 9/25/2015 | 9/25/2015 | 9/29/2015 | | FAIL |
Scott Arellano
|
|
|
Comments attached to case and emailed to architect.
|
Routing PW Sewer Rating | 9/25/2015 | | 9/29/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - MECHANICAL | 9/25/2015 | | 9/28/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 9/25/2015 | | 9/28/2015 | | PASS |
Bill VanDegrift
|
|
|
asse 1070 mixing valves at lavs
additional cross connection protection may be required.
|
Routing - Addressing | 9/25/2015 | | 9/25/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 9/25/2015 | | 9/25/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Pending Assignment by JCB | 9/25/2015 | | 9/25/2015 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 9/25/2015 | | DONE |
Jason Blais
|
|
|
No ACHD impact fees or inspection required per email uploaded into ePlanReview.
|
Routing - Design Review | 9/25/2015 | | 9/25/2015 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH15-00353
|
Intake Approval | | | 9/24/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Javier Guzman and plan review fees paid.
|
Intake Approval | | | 9/16/2015 | | FAIL |
Javier Guzman
|
|
|
• Please provide building plans drawn to scale on 18”x24” minimum size plan sheets.
• Please provide plans stamped and signed by an Idaho licensed architect
|
Application received | | | 9/15/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 15 2015 11:24AM
|