Permit Information
Permit NumberBLD15-03338
StatusFinaled
Name MARK GUHO CONSTRUCTION COMPANY
Site Address 10118 W OVERLAND RD
Project NameRiver City Surgical Center
Customer Number 
ePlanReviewYes
Description
(RIVER CITY SURGICAL CENTER - BUILDING #1)**(PLAN MODIFICATION - To enlarge operating rooms, enlarge the sterile room, enlarge the janitors room, enlarge and reconfigure restroom 117, removing storage room 116, shift the exterior door 123b opening, shift med gas room, shift nurse station/hallway wall, adding wall and new door at break room.) JG ** Permit is to remodel an existing 2808 sq. ft. tenant space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of interior nonbearing walls leaving only the mechanical room walls in place, remove window and portion of exterior wall for new door at riser room and ADA Ramp, new construction of interior non-bearing walls to create (med gas room, two operating rooms, sterile room, janitors closet, compressor room, three ADA compliant restrooms, laundry room, locker room with ADA compliant roll in shower, break room, IT closet, two offices, riser room, reception/waiting area, storage room, four pre/post operation rooms, nurse’s station area and hallways), new ADA compliant exterior ramp, relocated front entry door, code compliant stoop with steps, electrical work, mechanical work, plumbing work and interior finishes in compliance with Ch. 8 of the 2012 IBC. Note: Med Gas room to have 1 hour fire barrier walls up to the underside of the roof deck. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  10/18/2016 DONE
Third Notice 9/24/201610/10/2016 DONE
sent with a letter
Third Notice 8/16/20169/19/2016 DONE
Third Notice 7/16/20168/11/2016 DONE
Second Notice 6/20/20167/11/2016 DONE
Mailed 7-12-16
First Notice 5/23/20166/10/2016 DONE
Mailed 6-13-16
Print Occupancy Form  5/13/2016 DONE
Print Occupancy Form  5/13/2016 DONE
Permanent Occupancy  5/13/2016 DONE
BLD-Final5/12/20165/12/20165/12/2016PPASS
DetailsMike Jordan
David Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection5/9/20165/9/20165/9/2016PPASS
DetailsTroy Cobbley
life safety passed
Zoning Approval5/6/20165/6/20165/6/2016 DONE
DetailsAndrea Tuning
BLD-Conference5/4/20165/4/20165/4/2016PDONE
DetailsMike Jordan
David Phone #: ###-####. walk through with contractor. Noted vertcal grab bars installed to far from rear wall. New handrails not yet installed.
BLD-Ceiling Grid Inspection4/8/20164/8/20164/8/2016PPASS
DetailsMike Jordan
David Phone #: ###-####
BLD-Conference3/23/20163/23/20163/23/2016PPASS
DetailsMike Jordan
David Phone #: ###-####. Went over new ADA ramp. prior to concrete placement.
BLD-Conference3/21/20163/21/20163/21/2016PDONE
DetailsMike Jordan
David Phone #: ###-####. noted new ADA ramp at south side of building has greater than 9% slope.
BLD-Conference3/14/20163/15/20163/15/2016ADONE
DetailsMike Jordan
David Phone #: ###-####
BLD-Conference2/16/20162/17/20162/17/2016ADONE
DetailsMike Jordan
BLD-Wall cover2/16/20162/17/20162/17/2016APART
DetailsMike Jordan
David Phone #: ###-####. Reviewed new 1hr. wall details. Contractor to get detail for 1hr. roof ceiling.
BLD-Conference2/16/20162/16/20162/16/2016PCANC
DetailsMike Jordan
BLD-Framing/Rough-in2/11/20162/12/20162/12/2016PPART
DetailsJim Storey
David// prefers as late as possible Phone #: ###-#### ok to cover all BUT gas rm need fire barrior details for opening protection and roof listing 1 hr / fire riser rm opening protection
CHANGE STATUS TO (ISS)  2/11/2016 DONE
(F) Reprint permit  2/11/2016 DONE
OVERRIDE  2/10/2016  
PLANS/APPL TAKEN TO FRONT DESK  2/10/2016 DONE
Permit Ready to Issue  2/10/2016 DONE
DetailsChristina Prado
DO NOT RE-ISSUE - PLAN MOD APPROVED 2/10/16 - All requirements met for Plan Mod

Applicant must pay plan mod fees in full prior to changing status to ISS
Plan assigned to (JG)2/4/2016 2/10/2016 PASS
DetailsJavier Guzman
Plan Mod - River City Surgical Center
Routing - PLAN CHECK2/8/2016 2/10/2016 PASS
DetailsJavier Guzman
Routing - FIRE2/8/20162/8/20162/8/2016 PASS
DetailsScott Arellano
Modifications to room sizes reviewed. No additional comments required.
Plan Modification Accepted  2/4/2016 DONE
DetailsChristina Prado
Plan Mod to enlarge the exisitng operating rooms which results in various rooms including storage, restrooms and office rooms reducing in size
FIRE-Conference12/23/201512/23/201512/23/2015PDONE
DetailsJim Page
Discussed exit signage/egress lighting and direction of travel per city approved plans. Slight modification for exit lights will be made before final inspection.
Issue PAID IN FULL permit  12/4/2015 DONE
Print Occupancy Form  12/4/2015 DONE
Plan assigned to (JG)9/25/20159/25/201511/3/2015 PASS
DetailsJavier Guzman
1st review completed, 10/21 Level 3 TI - ePlanReview - River City Surgical Center, pendng fire
PLANS/APPL TAKEN TO FRONT DESK  11/3/2015 DONE
Permit Ready to Issue  11/3/2015 DONE
DetailsChristina Prado
***ALL REQUIRMENTS MET 12-3-15 /CEV Need GC, Revised Certificate of value for issuance
Routing - FIRE11/2/201511/2/201511/2/2015 PASS
DetailsKatie Marron
Revised report attached to case.
Routing - PLAN CHECK10/27/2015 10/27/2015 PASS
DetailsJavier Guzman
1st review completed  10/15/2015 FAIL
DetailsJavier Guzman
ePlan
Routing - PLAN CHECK9/25/2015 10/15/2015 FAIL
DetailsJavier Guzman
ePlan
Routing - Erosion and Sediment9/25/2015 9/30/2015 PASS
DetailsEvan Jenkins
(RIVER CITY SURGICAL CENTER) THE OWNER OF A 2808 SF SINGLE STORY COMMERCIAL BUILDING IS PROPOSING TENANT IMPROVEMENTS CONSISTING OF REMOVING AND ADDING INTERIOR WALLS, RELOCATING OR ADDING EXTERIOR DOORS, AND ADDING ADA ACCESS.
Routing - FIRE9/25/20159/25/20159/29/2015 FAIL
DetailsScott Arellano
Comments attached to case and emailed to architect.
Routing PW Sewer Rating9/25/2015 9/29/2015 PASS
DetailsJennifer Bruner
Routing - MECHANICAL9/25/2015 9/28/2015 PASS
DetailsTroy James
Routing - PLUMBING9/25/2015 9/28/2015 PASS
DetailsBill VanDegrift
asse 1070 mixing valves at lavs
additional cross connection protection may be required.
Routing - Addressing9/25/2015 9/25/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS9/25/2015 9/25/2015 PASS
DetailsJennifer Bruner
Pending Assignment by JCB9/25/2015 9/25/2015 DONE
DetailsJason Blais
Plan Reviewer's activity  9/25/2015 DONE
DetailsJason Blais
No ACHD impact fees or inspection required per email uploaded into ePlanReview.
Routing - Design Review9/25/2015 9/25/2015 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH15-00353
Intake Approval  9/24/2015 PASS
DetailsJason Blais
Prescreen approved by Javier Guzman and plan review fees paid.
Intake Approval  9/16/2015 FAIL
DetailsJavier Guzman
• Please provide building plans drawn to scale on 18”x24” minimum size plan sheets.
• Please provide plans stamped and signed by an Idaho licensed architect
Application received  9/15/2015 DONE
Application submitted via PDS Online on Sep 15 2015 11:24AM