BLD-Aging Inspection | 5/26/2016 | 5/26/2016 | 5/26/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 5/25/2016 | 5/25/2016 | 5/26/2016 | | DONE |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 1/12/2016 | 1/12/2016 | 1/12/2016 | P | PASS |
Dave Hannah
|
|
|
Justin Phone #: ###-####
|
Routing - MECHANICAL | 12/29/2015 | | 12/29/2015 | | PASS |
Troy James
|
|
|
manual j report submitted
|
BLD-Foundation | 10/8/2015 | 10/8/2015 | 10/8/2015 | P | PASS |
Dave Hannah
|
|
|
Robert Phone #: ###-####
|
BLD-Footing | 10/7/2015 | 10/7/2015 | 10/7/2015 | P | PASS |
Dave Hannah
|
|
|
Shaun Phone #: ###-####
|
PubWorks Subgrade Approval | 10/7/2015 | 10/7/2015 | 10/7/2015 | | DONE |
Jason C. Taylor
|
|
|
***NEW ADDITON FOOTINGS***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 9/29/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 9/28/2015 | 9/28/2015 | 9/29/2015 | | DONE |
Brian McGowan
|
|
|
|
Routing Walk-In (BLD) | 9/17/2015 | 9/17/2015 | 9/29/2015 | A | PASS |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/29/2015 | | 9/29/2015 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 9/29/2015 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 9/29/2015 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/29/2015 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/29/2015 | | 9/29/2015 | | PASS |
Javier Guzman
|
|
|
Plan review done by Brian M.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2015 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/29/2015 | | DONE |
|
|
|
Need RP
|
Inspection Record Card- Bld | | | 9/29/2015 | | DONE |
|
|
|
|
Telephone call | | | 9/29/2015 | | DONE |
|
|
|
Left a message for Justion informing him that the permit is ready, that we need to know who the RP will be and the fee amount that is due
|
Issue PAID IN FULL permit | | | 9/29/2015 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/28/2015 | | DONE |
|
|
|
resubmittals reveived 2 sets of sheets S1.01, S1.02, S2.01, S2.02, S2.03, S4.01, S5.01 & S5.02-took to Brian McGowen
|
Routing Walk-In (Zoning) | 9/17/2015 | 9/17/2015 | 9/17/2015 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (PW Hillside) | 9/16/2015 | 9/16/2015 | 9/17/2015 | A | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
1st review completed | | | 9/17/2015 | | FAIL |
Brian McGowan
|
|
|
New foundation plan not showing a basement and several other modified sheets are to be provided at a later date.
|
Application received | | 9/16/2015 | | | |
|
|
|
|