BLD-Final | 1/4/2016 | 1/5/2016 | 1/5/2016 | A | PASS |
Jim Sly
|
|
|
Duane Phone #: ###-####
|
DOC - Permit Finaled | 1/5/2016 | 1/5/2016 | 1/5/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | PASS |
Jim Sly
|
|
|
Dwayne Phone #: ###-####
|
BLD-Framing/Rough-in | 11/12/2015 | 11/13/2015 | 11/13/2015 | A | PASS |
Jim Sly
|
|
|
would like call ahead; Dwayne Phone #: ###-####
|
BLD-Wall Bracing | 10/20/2015 | 10/21/2015 | 10/22/2015 | A | PASS |
Jim Sly
|
|
|
Wayne Phone #: ###-####
|
BLD-Footing | 10/8/2015 | 10/8/2015 | 10/8/2015 | P | PASS |
Jim Sly
|
|
|
would like call ahead; Dwayne Phone #: ###-#### Mono pour ....footing and wall....OK.
|
Routing Walk-In (Zoning) | 10/1/2015 | 10/1/2015 | 10/1/2015 | A | PASS |
Colleen T Carroll
|
|
|
Plan Modification
|
Routing Walk-In (BLD) | 10/1/2015 | 10/1/2015 | 10/1/2015 | A | DONE |
Brian McGowan
|
|
|
|
Plan Modification Accepted | | | 10/1/2015 | | DONE |
|
|
|
Walk in
|
1st review completed | | | 10/1/2015 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/1/2015 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2015 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/1/2015 | | DONE |
|
|
|
fees paid
|
OVERRIDE | | | 9/16/2015 | | |
|
|
|
|
Routing Walk-In (Zoning) | 9/16/2015 | 9/16/2015 | 9/16/2015 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 9/16/2015 | 9/16/2015 | 9/16/2015 | A | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 9/16/2015 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 9/16/2015 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 9/16/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/16/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/16/2015 | | DONE |
|
|
|
|
Application received | | 9/16/2015 | | | |
|
|
|
|