BLD-Final | 10/5/2015 | 10/6/2015 | 10/6/2015 | P | PASS |
Jim Sly
|
|
|
Preston Phone #: ###-####
|
DOC - Permit Finaled | 10/6/2015 | 10/6/2015 | 10/6/2015 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 10/5/2015 | 10/5/2015 | 10/5/2015 | P | PART |
Tony Young
|
|
|
Preston Phone #: ###-####,, no electrical at this time,, ok,, roof is being completed at this time,, paint by owner
|
BLD-Framing/Rough-in | 10/2/2015 | 10/5/2015 | 10/5/2015 | A | PASS |
Tony Young
|
|
|
Preston Phone #: ###-####
|
BLD-Final | 10/1/2015 | 10/2/2015 | 10/2/2015 | P | NR |
Tony Young
|
|
|
Preston Phone #: ###-####,, frame ok
|
BLD-Footing | 9/18/2015 | 9/21/2015 | 9/21/2015 | A | PASS |
Jim Storey
|
|
|
Paul Phone #: ###-####
|
Routing Walk-In (Zoning) | 9/18/2015 | 9/18/2015 | 9/18/2015 | A | DONE |
Sue Cummings
|
|
|
modified site plan ONLY
|
Routing Walk-In (BLD) | 9/18/2015 | 9/18/2015 | 9/18/2015 | A | PASS |
Tisha Gallop
|
|
|
plan modification to relocate accessory structure on lot. The structure is staying the same.
|
Plan Modification Accepted | | | 9/18/2015 | | DONE |
|
|
|
modification to the site plan ONLY
|
OVERRIDE | | | 9/16/2015 | | |
|
|
|
|
Routing Walk-In (Zoning) | 9/16/2015 | 9/16/2015 | 9/16/2015 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 9/16/2015 | 9/16/2015 | 9/16/2015 | A | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 9/16/2015 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 9/16/2015 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 9/16/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/16/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/16/2015 | | DONE |
|
|
|
|
Application received | | 9/16/2015 | | | |
|
|
|
|