Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-03390
StatusFinaled
Name DUTSON BUILDERS INC
Site Address 815 W BANNOCK ST
Project NameEven Stevens
Customer Number 
ePlanReviewYes
Description
(EVEN STEVENS) DRH15-00393 PLAN MODIFICATION- TYPE 2 HOOD OVER OVEN. 4-11-16 AJS**PLAN MODIFICATION - Kitchen equipment/layout and front storefront changes, special inspection required see form 310. **3-23-16 ajs** Remodel changing occupancy to a new 2,516 sq. ft. assembly restaurant tenant within existing building and 820 sq ft out door seating area. per approved plans. Previous tenant was restaurant used, classified as B occupancy. The basement is NOT part of this space as it is not allowed for occupancy. Work to include new interior walls, new finish, new commercial kitchen with equipment including hood, remove existing exterior Parapet EIFS along the North wall and add (1) new barn style door in the West exterior property line wall for access to the patio on the adjacent property. A Non-Build/Access Easement Agreement on the adjacent property has been executed and recorded to allow the patio on adjacent property and to allow the opening in the west exterior wall on the property line. The east wall of this tenant space is a 2-rated fire barrier to comply with fire area provisions and occupancy separation including a 2 hour fire barrier to separate the second means of egress from the remaining building tenants. . NOTE: This building is NOT fire sprinklered.**ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  7/19/2016 DONE
Third Notice 6/15/20167/11/2016 DONE
Second Notice 6/2/20166/10/2016 DONE
First Notice 4/30/20165/23/2016 DONE
BLD-Final4/18/20164/18/20164/20/2016PPASS
DetailsDave Hannah
Kelly Phone #: ###-####
Permanent Occupancy  4/20/2016 DONE
Temporary Occupancy4/19/20167/18/20164/19/2016 DONE
DetailsKristal Soland
Zoning Approval4/18/20164/18/20164/18/2016 DONE
DetailsAndrea Tuning
BLD-Final4/14/20164/15/20164/15/2016PPART
DetailsJim Storey
Kelly Phone #: ###-####-fire to be done early PM need p&z sign off/ temp ok basement cleared out at insp. temp on mech
FIRE-Final Inspection4/15/20164/15/20164/15/2016PPASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguisher is in place with current inspection tag. Final life fire safety inspection passed/complete
Print Occupancy Form  4/15/2016 DONE
BLD-Ceiling Grid Inspection4/11/20164/12/20164/12/2016APASS
DetailsDave Hannah
Kelly Phone #: ###-####
Plan assigned to (AJS)4/7/20164/7/20164/11/2016 PASS
DetailsAdele J Schaffeld-Griffin
Plan Mod. ePlanReview - Even Stevens
Routing - PLAN CHECK4/7/2016 4/11/2016 PASS
DetailsAdele J Schaffeld-Griffin
Routing - MECHANICAL4/7/2016 4/11/2016 PASS
DetailsTroy James
added type II hood over conveyor oven.
PLANS/APPL TAKEN TO FRONT DESK  4/11/2016 DONE
Permit Ready to Issue  4/11/2016 DONE
no plan mod fees due as per Adele Schaffeld-Griffin
CHANGE STATUS TO (ISS)  4/11/2016 DONE
no fees due
BLD-Conference4/8/20164/8/20164/9/2016PDONE
DetailsDave Hannah
Kelly Phone #: ###-####
FIRE-Conference4/8/20164/8/20164/8/2016PDONE
DetailsJim Page
Life fire safety conference complete
Routing - FIRE4/7/20164/7/20164/8/2016 PASS
DetailsKatie Marron
Modification to install a second Type II hood. No additional comments required.
Plan Modification Accepted  4/7/2016 DONE
DetailsChristina Prado
Plan Mod to add a second hood over conyeyor
BLD-Other3/23/20163/24/20163/24/2016APASS
DetailsDave Hannah
fire wall sheathing - Kelly Phone #: ###-####
Plan assigned to (AJS)2/22/20162/22/20163/23/2016 PASS
DetailsAdele J Schaffeld-Griffin
Plan mod review completed -Plan Mod - Even Stevens
CHANGE STATUS TO (ISS)  3/23/2016 DONE
DetailsChristina Prado
Plan mod fees paid, status changed back to ISS for inspections
Routing - PLAN CHECK3/23/2016 3/23/2016 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  3/23/2016 DONE
Permit Ready to Issue  3/23/2016 DONE
DetailsChristina Prado
DO NOT RE-ISSUE - PLAN MOD APPROVED, All requirements met

Must pay all fees prior to changing status to ISS
Routing - PLAN CHECK3/21/2016 3/22/2016 FAIL
DetailsAdele J Schaffeld-Griffin
change marks not addressed need corrected/completed 310 form
Routing - PLUMBING3/21/2016 3/21/2016 PASS
DetailsBill VanDegrift
1) additional cross connection protection may be required
2) indirectly waste the dish sink
3) R.P. on MAU
4) vent all traps
Routing - PLAN CHECK3/15/2016 3/17/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLUMBING3/15/2016 3/17/2016 FAIL
DetailsDaryl Spivey
signed in e plan
Routing - PLAN CHECK2/22/2016 3/2/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Routing Off Site - C.D.H2/22/2016 3/2/2016 PASS
DetailsAdele J Schaffeld-Griffin
BLD-Energy code compliance2/26/20162/29/20163/1/2016PPART
DetailsDave Hannah
Kelly Phone #: ###-#### ok to start sheetrocking firewalls and insulation in ceiling
BLD-Framing/Rough-in2/25/20162/25/20162/26/2016PPART
DetailsDave Hannah
For Part; part is where the modification is // Kelly Phone #: ###-#### ok to insulate 2hr fire wall and ceiling
Routing - MECHANICAL2/22/2016 2/24/2016 PASS
DetailsTroy James
Routing - PLUMBING2/22/2016 2/24/2016 FAIL
DetailsBill VanDegrift
1) UPC 910 and Appendix B-- vent all traps
resubmit P101
2) additional cross connection protection may be required
3) R.P> will be required on the make-up water to the MAU
4) indirect waste required for the K-27
Routing - FIRE2/22/20162/22/20162/22/2016 PASS
DetailsKatie Marron
Modification reviewed. No changes to report/comments required.
Routing - Design Review2/22/2016 2/22/2016 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH15-00393 - Storefront changes
Routing - Addressing2/22/2016 2/22/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS2/22/2016 2/22/2016 PASS
DetailsJennifer Bruner
Plan Modification Accepted  2/22/2016 DONE
DetailsChristina Prado
Per request of architect to modify the kitchen details for Plumbing review
Issue PAID IN FULL permit  1/28/2016 DONE
Print Occupancy Form  1/28/2016 DONE
Telephone call  1/26/2016 DONE
spoke with Corey informing him he needs to get with ACHD and that we need gc form and revised value
Plan assigned to (AJS)11/18/201511/18/20151/25/2016 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Level 3 TI - ePlanReview - Even Stevens
Routing - PLAN CHECK1/21/2016 1/25/2016 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  1/25/2016 DONE
Permit Ready to Issue  1/25/2016 DONE
DetailsChristina Prado
Need ACHD, ***MET*** GC & Revised certificate of value for issuance
Routing - FIRE1/21/20161/21/20161/21/2016 PASS
DetailsKatie Marron
Revised comments attached to case.
1st review completed  12/17/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK11/18/2015 12/17/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing PW Environmental11/19/2015 12/14/2015 PASS
DetailsRick Christenson
Grease Trap Shown.
Routing - MECHANICAL11/18/2015 11/24/2015 PASS
DetailsTroy James
Routing PW Sewer Rating11/19/2015 11/23/2015 PASS
DetailsRachael Beierle
Routing - FIRE11/18/201511/18/201511/19/2015 FAIL
DetailsScott Arellano
Report attached to case and emailed to architect.
Routing - Erosion and Sediment11/18/2015 11/19/2015 CANC
DetailsEvan Jenkins
No ESC Permit Required
Routing - Design Review11/18/2015 11/19/2015 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH15-00393
Routing - PLUMBING11/18/2015 11/19/2015 PASS
DetailsBill VanDegrift
1) vent all traps
2) additional cross connection protection will be required
Routing - Addressing11/18/2015 11/19/2015 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS11/18/2015 11/19/2015 PASS
DetailsJennifer Bruner
Plan Reviewer's activity  11/18/2015 PASS
Plan intake review approved
Intake Approval  11/18/2015 PASS
DetailsJason Blais
Prescreen approved by Carl Westfall and plan review fees paid.
Pending Assignment by JCB11/18/2015 11/18/2015  
DetailsJason Blais
Plan Reviewer's activity  11/18/2015 DONE
DetailsJason Blais
Emailed architect to have him contact ACHD to determine if any additional impact fees are due. Will need written verification from ACHD provided to our Permit Counter prior to the building permit being issue.
Intake Approval  11/9/2015 FAIL
See the redlines on the plan intake checklist
Intake Approval  9/21/2015 FAIL
(9-21-15) See the redlines on the Plan Intake Submittal Checklist for additional items that need to be provided.
Application received  9/18/2015 DONE
Application submitted via PDS Online on Sep 18 2015 9:45AM