BLD-Framing/Rough-in | 12/2/2016 | 12/2/2016 | 12/2/2016 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 12/1/2016 | 12/2/2016 | 12/2/2016 | A | PASS |
Mike Jordan
|
|
|
Bert Phone #: ###-####
|
BLD-Energy code compliance | 12/2/2016 | 12/2/2016 | 12/2/2016 | P | PASS |
Mike Jordan
|
|
|
Bert Phone #: ###-####
|
BLD-Framing/Rough-in | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | PART |
Mike Jordan
|
|
|
Nathan Phone #: ###-####. Complete lateral bracing and airseal. Provide UL approved listings for through penetrations on 3hr fire barrier wall. (Pex)
|
BLD-Framing/Rough-in | 11/23/2016 | 11/23/2016 | 11/23/2016 | P | NR |
Mike Jordan
|
|
|
Bert Phone #: ###-####. Needs electrical rough in inspection.
|
BLD-Framing/Rough-in | 7/21/2016 | 7/22/2016 | 7/22/2016 | P | CANC |
Mike Jordan
|
|
|
Bert Phone #: ###-####
|
BLD-Wall Bracing | 7/21/2016 | 7/22/2016 | 7/22/2016 | P | PASS |
Mike Jordan
|
|
|
Shear // Bert Phone #: ###-####
|
BLD-Conference | 7/8/2016 | 7/8/2016 | 7/8/2016 | P | DONE |
Mike Jordan
|
|
|
Bert Phone #: ###-####
|
BLD-Wall Bracing | 7/8/2016 | 7/8/2016 | 7/8/2016 | P | PASS |
Mike Jordan
|
|
|
Bert Phone #: ###-####. Nailing on roof ok.
|
BLD-Foundation | 3/16/2016 | 3/17/2016 | 3/17/2016 | A | PASS |
Mike Jordan
|
|
|
Bert Phone #: ###-####. Interior footing for masonry wall ok.
|
BLD-Foundation | 2/23/2016 | 2/23/2016 | 2/23/2016 | P | CANC |
Mike Jordan
|
|
|
epoxy; Burt Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 2/16/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/16/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/16/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 2/12/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 1/19/2016 | 1/19/2016 | 2/12/2016 | | PASS |
Carl D Madsen
|
|
|
Plan Mod
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/12/2016 | | DONE |
Christina Prado
|
|
|
DO NOT RE-ISSUE - PLAN MOD APPROVED 2/12/2016
All requirements met for plan mod, must pay all fees in full prior to changing status to ISS
|
Routing - PLAN CHECK | 2/1/2016 | | 2/10/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 2/1/2016 | | 2/10/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 2/1/2016 | | 2/1/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 2/1/2016 | | 2/1/2016 | | FAIL |
Carl D Madsen
|
|
|
|
BLD-Foundation | 1/28/2016 | 1/29/2016 | 1/29/2016 | A | PASS |
Jim Sly
|
|
|
wall-###-#### Jim
|
BLD-Foundation | 1/27/2016 | 1/28/2016 | 1/28/2016 | P | PASS |
Jim Sly
|
|
|
Jim- ###-####
|
BLD-Footing | 1/27/2016 | 1/27/2016 | 1/27/2016 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
Routing - Design Review | 1/22/2016 | | 1/25/2016 | | PASS |
Josh Wilson
|
|
|
|
BLD-Footing | 1/19/2016 | 1/20/2016 | 1/20/2016 | A | NR |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Needs to install vertical rebar. Noted that their has been a resubmittal that involves footings.
|
Routing - PLAN CHECK | 1/20/2016 | | 1/20/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Plan assigned to (AJS) | 1/19/2016 | 1/19/2016 | 1/19/2016 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
Carl M is the plan reviewer for this issued project. Will re assign to him.
|
Print Occupancy Form | | | 1/19/2016 | | DONE |
Christina Prado
|
|
|
|
Plan Modification Accepted | | | 1/19/2016 | | DONE |
Christina Prado
|
|
|
Plan mod requested by architect to change location of exterior door
|
Issue PAID IN FULL permit | | | 1/6/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/6/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 12/7/2015 | | |
|
|
|
|
Plan assigned to (CDM) | 9/29/2015 | 9/29/2015 | 12/7/2015 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing PW Solid Waste | 9/29/2015 | | 12/7/2015 | | PASS |
Megan Durrell
|
|
|
See E-Plan
|
Routing - PLAN CHECK | 12/7/2015 | | 12/7/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/7/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/7/2015 | | DONE |
|
|
|
NEED RP, GC form, and certificate of value
|
Routing PW Drainage | 9/29/2015 | | 12/7/2015 | | PASS |
Brian Murphy
|
|
|
See E-plan
|
Routing PW Environmental | 11/19/2015 | | 12/7/2015 | | PASS |
Rick Christenson
|
|
|
Trench Drains relocated as needed.
|
Routing PW Solid Waste | 11/19/2015 | | 11/25/2015 | | PASS |
Megan Durrell
|
|
|
|
Routing - PUBLIC WORKS | 11/19/2015 | | 11/19/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 11/18/2015 | | 11/18/2015 | | PASS |
Evan Jenkins
|
|
|
(MCDOWELLS SPECIALTY REPAIRS - Addition) Permit for the construction of a 1,724 sq. ft. addition to an existing 3,331 sq. ft. building to be used as a automotive.repair garage per the approved plans, attached engineering and any notations. This building is not fire sprinklered.
|
Route to Impact Fee Review | 10/23/2015 | 10/26/2015 | 10/26/2015 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 10/23/2015 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/29/2015 | | 10/23/2015 | | PASS |
Carl D Madsen
|
|
|
|
CHANGE STATUS TO (REV) | | | 10/14/2015 | | DONE |
Christina Prado
|
|
|
Status changed to FEE by mistake, permit still in review
|
Routing - Erosion and Sediment | 10/7/2015 | | 10/7/2015 | | FAIL |
Evan Jenkins
|
|
|
Note: Full ESC Narrative and Site Map Required and needs to be uploaded through ePlan Review. Contacted Tom stating so.
(MCDOWELLS SPECIALTY REPAIRS - Addition) Permit for the construction of a 1,724 sq. ft. addition to an existing 3,331 sq. ft. building to be used as a automotive.repair garage per the approved plans, attached engineering and any notations. This building is not fire sprinklered.
|
Routing - PLUMBING | 9/29/2015 | | 10/7/2015 | | PASS |
Daryl Spivey
|
|
|
ASSE 1070 mixing valve required at lav
move trench drain to door per public works review
|
Routing PW Environmental | 9/29/2015 | | 10/6/2015 | | FAIL |
Rick Christenson
|
|
|
Trench Drain needs relocated to be within 2 feet from Bay Doors.
|
Routing - Design Review | 9/29/2015 | | 10/5/2015 | | PASS |
Josh Wilson
|
|
|
OK per DRH14-00419
|
Routing - PLAN CHECK | 9/29/2015 | | 10/4/2015 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Street Lights | 9/29/2015 | | 10/2/2015 | | PASS |
Mike D Hedge
|
|
|
No new street lighting required.
|
Routing PW Sewer Rating | 9/29/2015 | | 10/1/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - FIRE | 9/29/2015 | 9/29/2015 | 9/30/2015 | | PASS |
Katie Marron
|
|
|
Review attached to case.
|
Routing - PLANNING Land Div | 9/29/2015 | | 9/30/2015 | | PASS |
Dave Abo
|
|
|
|
Routing - Addressing | 9/29/2015 | | 9/29/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 9/29/2015 | | 9/29/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 9/29/2015 | | 9/29/2015 | | FAIL |
Evan Jenkins
|
|
|
Full ESC Narrative and Site Map Required for Approval w/ Valid Certified Responsible Person. Evan Jenkins 794.3958
Contacted Tom via phone on 10-13-15 and disclosed a Full ESC narrative and site map is required, and also it needs to be submitted through ePlan.
|
Pending Assignment by TLW | 9/29/2015 | | 9/29/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 9/28/2015 | | PASS |
|
|
|
|
Intake Approval | | | 9/25/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
9-25-15 Please see mark up on check list sheets for missing and additional information needed for the prescreen.
|
Intake Approval | | | 9/24/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
9-24-15 Previous comments not addressed. I will delete all drawings to make it easier to re upload with the correct name.
|
Intake Approval | | | 9/23/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please complete and upload the 502 check list. The pre screen can not be done prior to that being received.
Please re upload the drawings to meet the required conventional naming of drawings sheets as shown in the electronic submittal standards. A0.0-Cover Sheet is an example.
|
Application received | | | 9/18/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 18 2015 2:23PM
|