BLD-Aging Inspection | 2/25/2016 | 2/25/2016 | 3/1/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/26/2016 | 2/26/2016 | 3/1/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Footing | 10/13/2015 | 10/14/2015 | 10/14/2015 | P | PASS |
Dave Hannah
|
|
|
Pool // Ryan Phone #: ###-####
|
PubWorks Subgrade Approval | 10/12/2015 | 10/12/2015 | 10/12/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 9/22/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 9/21/2015 | | |
|
|
|
|
Application received | | 9/21/2015 | 9/21/2015 | | DONE |
|
|
|
Jason Taylor reviewed the pool and it was OK according to the CFH issued for the residence, CFH11-00037.
|
Routing Walk-In (Zoning) | 9/21/2015 | 9/21/2015 | 9/21/2015 | A | PASS |
Bruce Eggleston
|
|
|
Pending review of Hillside by Public Works.BPE 9/21/2015
|
Routing Walk-In (BLD) | 9/21/2015 | 9/21/2015 | 9/21/2015 | A | CANC |
Tisha Gallop
|
|
|
routed
|
Inspection Record Card- Bld | | | 9/21/2015 | | DONE |
|
|
|
|
1st review completed | | | 9/21/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/21/2015 | | |
|
|
|
All requirements met
|
Routing PW Grading-Hillside | 9/21/2015 | | 9/21/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. If you have any questions call Jason Taylor ###-####.
|
Routing - Erosion and Sediment | 9/21/2015 | | 9/21/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
New Hillside residential pool.
|
Routing - PLAN CHECK | 9/21/2015 | | 9/21/2015 | | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 9/21/2015 | | 9/21/2015 | | DONE |
Tisha Gallop
|
|
|
hillside pool received 9-21, routed to erosion
|
Telephone call | | | 9/21/2015 | | DONE |
|
|
|
called Ryan- told him fees due and permit is ready for pick up
|