Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-03409
StatusIssued
Name ROCKY MOUNTAIN POOLS
Site Address 1708 S DRACO PL
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is to place a new engineered 512 s.f. in ground gunite swimming pool. This pool will have a gas water heating system, chlorine disinfection system, and a sand filter, flushed using an onsite lawn application. Separate electrical permit is required and bonding of all metal parts is required to be approved by the electrical division prior to approval for placement of any concrete by the structural division. Separate mechanical and erosion permits are also required. All per the zoning approval R-1A/DA by Bruce Eggleston, ESC Plan, engineering with details, Plan Review Notes, and Appendix G of the 2012 IRC.//leg ***A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. If you have any questions call Jason Taylor 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection2/25/20162/25/20163/1/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection2/26/20162/26/20163/1/2016 PEND
DetailsDave Hannah
BLD-Footing10/13/201510/14/201510/14/2015PPASS
DetailsDave Hannah
Pool // Ryan Phone #: ###-####
PubWorks Subgrade Approval10/12/201510/12/201510/12/2015 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  9/22/2015 DONE
OVERRIDE  9/21/2015  
Application received 9/21/20159/21/2015 DONE
Jason Taylor reviewed the pool and it was OK according to the CFH issued for the residence, CFH11-00037.
Routing Walk-In (Zoning)9/21/20159/21/20159/21/2015APASS
DetailsBruce Eggleston
Pending review of Hillside by Public Works.BPE 9/21/2015
Routing Walk-In (BLD)9/21/20159/21/20159/21/2015ACANC
DetailsTisha Gallop
routed
Inspection Record Card- Bld  9/21/2015 DONE
1st review completed  9/21/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/21/2015 DONE
Permit Ready to Issue  9/21/2015  
All requirements met
Routing PW Grading-Hillside9/21/2015 9/21/2015 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. If you have any questions call Jason Taylor ###-####.
Routing - Erosion and Sediment9/21/2015 9/21/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

New Hillside residential pool.
Routing - PLAN CHECK9/21/2015 9/21/2015 PASS
DetailsTisha Gallop
Plan assigned to (LEG) Tisha9/21/2015 9/21/2015 DONE
DetailsTisha Gallop
hillside pool received 9-21, routed to erosion
Telephone call  9/21/2015 DONE
called Ryan- told him fees due and permit is ready for pick up