Permit Information
Permit NumberBLD15-03420
StatusFinaled
Name SOLITUDE HOMES
Site Address 3320 E HEARTLEAF DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit has been altered to a WUI Zone "A" as per the Fire Marshall. 12-18-2015 **BJM** Revised plan sheets showing compliance with "A" specifications were resubmitted 1-04-2016 **BJM** WUI Zone B; Permit for the construction of a new 3761 sq. ft., two story (first story 1979 sq. ft., second story 1782 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 755 sq. ft. of covered patio’s/porches and 1174 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Home proposes using Prescriptive Energy Code.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval6/3/20166/3/20166/3/2016 DONE
DetailsJason C. Taylor
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final6/1/20166/2/20166/2/2016PPASS
DetailsJim Storey
Please call ahead for access - Blake Phone #: ###-####pond on file
DOC - Permit Finaled6/2/20166/2/20166/2/2016PPASS
DetailsJim Storey
BLD-Aging Inspection6/2/20166/2/20166/2/2016 PASS
DetailsJim Storey
BLD-Conference5/31/20165/31/20165/31/2016ADONE
DetailsMike Jordan
Provide handrails upstairs, Needs public works and electrical finals, riser openeing in spiral stairs greater than 4 inches.
BLD-Final5/27/20165/31/20165/31/2016ANR
DetailsMike Jordan
Blake Phone #: ###-####// please call before. Needs electrical final first.
BLD-Energy code compliance1/19/20161/20/20161/20/2016APASS
DetailsJim Storey
Blake Phone #: ###-####
BLD-Framing/Rough-in1/19/20161/20/20161/20/2016APASS
DetailsJim Storey
Blake Phone #: ###-####
BLD-Energy code compliance1/19/20161/19/20161/19/2016PNR
DetailsJim Storey
Blake Phone #: ###-####
BLD-Framing/Rough-in1/19/20161/19/20161/19/2016PNR
DetailsJim Storey
Blake Phone #: ###-####
BLD-Framing/Rough-in1/13/20161/13/20161/13/2016PPART
DetailsPhil Shearer
Blake Phone #: ###-####. Nailing on 2PLY girder truss, Point load support for the 2PLY truss, Missing columns in the front and back of the house to support beams. OK to insulate.
BLD-Framing/Rough-in1/7/20161/8/20161/8/2016ANR
DetailsJim Storey
Blake Phone #: ###-####
Routing - PLAN CHECK1/4/2016 1/5/2016 PASS
DetailsBrian McGowan
as Brian McGowan ok to sign off
CHANGE STATUS TO (ISS)  1/5/2016 DONE
Plan Modification Accepted  1/4/2016 DONE
received plan mod-2 sets of sheets 8, 9 & 10-Brian McGowan came out to do the plan review
Plan Modification Accepted  12/22/2015 DONE
new manual j report
Routing - MECHANICAL12/22/2015 12/22/2015 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing12/17/201512/17/201512/17/2015PPASS
DetailsJim Storey
Blake Phone #: ###-####
Plan assigned to (BJM)10/1/201510/1/201512/3/2015 DONE
DetailsBrian McGowan
due 10/14 L2 - 1st review complete - Failed
BLD-Footing11/9/201511/9/201511/9/2015PPASS
DetailsJim Storey
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
PubWorks Subgrade Approval11/9/201511/9/201511/9/2015 DONE
DetailsJason C. Taylor
* CRAWLSPACE FOOTINGS**A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing11/5/201511/5/201511/5/2015PFAIL
DetailsJim Storey
Phone #: 2086971241 >> Inspection requested via mobile web by Heron need pw
OVERRIDE  10/29/2015  
Inspection Record Card- Bld  10/29/2015 DONE
Telephone call  10/29/2015 DONE
called Cody (Tony) to let know a permit is ready and how much is owed.-Left message on his cell
Issue PAID IN FULL permit  10/29/2015 DONE
Routing - PLAN CHECK10/26/2015 10/29/2015 PASS
DetailsBrian McGowan
Brian M. did the review
Routing - PLAN CHECK10/29/2015 10/29/2015 PASS
DetailsBrian McGowan
Case Summary (BLD)  10/29/2015 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  10/29/2015 DONE
Permit Ready to Issue  10/29/2015 DONE
All Requirements Met
Routing - PLAN CHECK  10/28/2015 PASS
DetailsBrian McGowan
Routing - PLANNING10/1/2015 10/28/2015 PASS
DetailsColleen T Carroll
Plan resubmittals received  10/26/2015 DONE
received (3) copies of; Engineering Calculations, complete set of plans
Routing - PLAN CHECK10/8/2015 10/15/2015 FAIL
DetailsBrian McGowan
1st review completed  10/15/2015 FAIL
DetailsBrian McGowan
Foundation needed to be stamped and signed. Additional information needed on shear and structure.
Routing - FIRE10/7/2015 10/8/2015 PASS
DetailsScott Arellano
Plans approved as shown.
Routing - Erosion and Sediment10/1/2015 10/5/2015 PASS
DetailsEvan Jenkins
(ESC Site Prep Inspection and Approval Required Prior to Earth Disturbance)

WUI Zone B; Permit for the construction of a new 3761 sq. ft., two story (first story 1979 sq. ft., second story 1782 sq. ft.) single family dwelling with 4 bedrooms, 4.5 bathrooms, approximately 755 sq. ft. of covered patio’s/porches and 1174 sq. ft. attached garage
Routing - PUBLIC WORKS  10/1/2015 PASS
DetailsJennifer Bruner
Routing - MECHANICAL  10/1/2015 PASS
DetailsTroy James
Plan assigned to (LEG) Tisha9/23/2015 10/1/2015 DEFR
DetailsTisha Gallop
Routing - Addressing9/23/2015 9/30/2015 PASS
DetailsJason C. Taylor
Routing PW Grading-Hillside9/30/2015 9/30/2015 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Plans ACCEPTED BY PLAN TECH  9/23/2015 DONE
Intake Approval  9/23/2015 PASS
Recd Pcfee & Taken To Pln CK  9/23/2015 DONE
Application received 9/21/2015