Print Statement | | | 9/26/2016 | | DONE |
|
|
|
|
Second Notice | | 6/25/2016 | 7/11/2016 | | DONE |
|
|
|
Mailed 7-12
|
First Notice | | 5/19/2016 | 6/15/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/9/2016 | | DONE |
|
|
|
|
BLD-Final | 5/6/2016 | 5/6/2016 | 5/6/2016 | P | PASS |
Jim Storey
|
|
|
Morgan Phone #: ###-####
|
Zoning Approval | 5/3/2016 | 5/3/2016 | 5/3/2016 | | PASS |
Josh Wilson
|
|
|
Landscaping and fence complete, bond can be released.
|
BLD-Ceiling Grid Inspection | 4/13/2016 | 4/14/2016 | 4/14/2016 | P | PASS |
Jim Storey
|
|
|
Morgan Phone #: ###-####
|
BLD-Final | 4/14/2016 | 4/14/2016 | 4/14/2016 | P | PASS |
Jim Storey
|
|
|
Morgan Phone #: ###-#### temp holding for P & z bond posted
|
FIRE-Final Inspection | 4/12/2016 | 4/13/2016 | 4/13/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Previous corrections have been corrected. I tested the emergency off which functioned correctly.
|
Zoning Approval Temp | 4/13/2016 | 4/13/2016 | 4/13/2016 | | PASS |
Josh Wilson
|
|
|
Bond is in place for landscaping and fencing. 180 day ok.
JGW 4-13-16
|
FIRE-Final Inspection | 4/11/2016 | 4/12/2016 | 4/12/2016 | P | FAIL |
Jim Page
|
|
|
Signage reading "Door to remain unlocked when building is occupied" needs to be installed at main entry. The main entry has a double keyed deadbolt assembly installed, this deadbolt is going to remain, the northeast exterior exit door also has double keyed deadbolt, this door needs single action door hardware installed, one double keyed deadbolt is allowed. CO2 tank located in the storage room of building needs to be in place and secured from possible tipping before next inspection. Provide small documentation that is associated with city approved drawings at next inspection.
|
BLD-Ceiling Grid Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 | P | PASS |
Jim Storey
|
|
|
Kenny Phone #: ###-####
|
BLD-Energy code compliance | 2/16/2016 | 2/17/2016 | 2/17/2016 | A | PASS |
Jim Storey
|
|
|
Insulation // Kenny Phone #: ###-####
|
BLD-Framing/Rough-in | 2/11/2016 | 2/12/2016 | 2/12/2016 | P | PASS |
Jim Storey
|
|
|
Kenny Phone #: ###-#### pending roof insulation value
|
BLD-Other | 1/22/2016 | 1/25/2016 | 1/25/2016 | P | PASS |
Jim Storey
|
|
|
Kenny/// roof nailing inspection Phone #: ###-#### roof straps and nailling ok to cover //need r22 verified.
|
BLD-Foundation | 12/22/2015 | 12/23/2015 | 12/23/2015 | A | PASS |
Jim Storey
|
|
|
Kenny-rebar wall-pour time 11:00 Phone #: ###-#### pending si report
|
BLD-Foundation | 12/21/2015 | 12/22/2015 | 12/22/2015 | A | PART |
Jim Storey
|
|
|
KENNY-- POUR TIME IS 8AM Phone #: ###-#### placed wiyh si
|
BLD-Foundation | 12/9/2015 | 12/10/2015 | 12/10/2015 | A | PASS |
Jim Sly
|
|
|
Kenny Phone #: ###-####
|
BLD-Foundation | 11/30/2015 | 12/1/2015 | 12/1/2015 | A | PASS |
Jim Storey
|
|
|
Kenny// pour time is 11am Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/30/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/30/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 11/23/2015 | | |
|
|
|
|
Plan assigned to (CDM) | 11/3/2015 | 11/3/2015 | 11/23/2015 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing - PLAN CHECK | 11/19/2015 | | 11/23/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 11/19/2015 | | 11/23/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/23/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/23/2015 | | DONE |
|
|
|
Needs; Responsible Person, **MET** GC Form,**MET** Revised Cert of Value
|
Route to Impact Fee Review | 11/19/2015 | 11/22/2015 | 11/19/2015 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 11/19/2015 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 11/3/2015 | | 11/19/2015 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 11/3/2015 | | 11/19/2015 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Sewer Design | 11/4/2015 | | 11/18/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLANNING | 11/3/2015 | | 11/10/2015 | | PASS |
Leon Letson
|
|
|
CUP15-00022
|
Routing - Design Review | 11/3/2015 | | 11/10/2015 | | PASS |
Josh Wilson
|
|
|
Ok per DRH15-00146
|
Routing PW Environmental | 11/4/2015 | | 11/10/2015 | | PASS |
Rick Christenson
|
|
|
|
Routing - PLUMBING | 11/3/2015 | | 11/9/2015 | | PASS |
Daryl Spivey
|
|
|
1) ASSE 1070 mixing valves required at the public lavs
2) verify interceptor detail with public works pretreatment
3) connect N.P. water line branch downstream of premise protection
4) additional cross connection protection may be required
|
Routing - FIRE | 11/3/2015 | 11/3/2015 | 11/4/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - PLANNING Land Div | 11/3/2015 | | 11/4/2015 | | PASS |
Dave Abo
|
|
|
ROS #3428
|
Routing - Addressing | 11/3/2015 | | 11/4/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 11/3/2015 | | 11/4/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 11/3/2015 | | 11/4/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(JACKSON'S FOOD STORE / CARWASH) Demolish existing 2,357 sq.ft store and replace with new 4,130 sq.ft store with car wash
|
Routing PW Sewer Rating | 11/4/2015 | | 11/4/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Solid Waste | 11/4/2015 | | 11/4/2015 | | PASS |
Megan Durrell
|
|
|
Trash enclosure gates must swing open at least 120 degrees.
|
Routing PW Drainage | 11/4/2015 | | 11/4/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 11/4/2015 | | 11/4/2015 | | PASS |
Mike D Hedge
|
|
|
No new street lighting required.
|
Intake Approval | | | 11/3/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 11/3/2015 | | 11/3/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 9/25/2015 | | FAIL |
Javier Guzman
|
|
|
Form #502 Checklist must be completed by the project’s Idaho-licensed design professional of record and uploaded with the plans and documents . The checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed. Incomplete submittals will not be accepted.
|
Application received | | | 9/22/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 22 2015 8:31AM
|