Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD15-03428
StatusFinaled
Name WESTERN IDAHO BUILDERS
Site Address 2581 S BROADWAY AVE
Project NameJacksons Broadway
Customer Number 
ePlanReviewYes
Description
(JACKSON'S FOOD STORE / CARWASH) Demolish existing 2,357 sq.ft store and replace with new 4,130 sq.ft store with car wash per the approved plans and any notations and attached engineering. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  9/26/2016 DONE
Second Notice 6/25/20167/11/2016 DONE
Mailed 7-12
First Notice 5/19/20166/15/2016 DONE
Permanent Occupancy  5/9/2016 DONE
BLD-Final5/6/20165/6/20165/6/2016PPASS
DetailsJim Storey
Morgan Phone #: ###-####
Zoning Approval5/3/20165/3/20165/3/2016 PASS
DetailsJosh Wilson
Landscaping and fence complete, bond can be released.
BLD-Ceiling Grid Inspection4/13/20164/14/20164/14/2016PPASS
DetailsJim Storey
Morgan Phone #: ###-####
BLD-Final4/14/20164/14/20164/14/2016PPASS
DetailsJim Storey
Morgan Phone #: ###-#### temp holding for P & z bond posted
FIRE-Final Inspection4/12/20164/13/20164/13/2016PPASS
DetailsTroy Cobbley
Life safety passed. Previous corrections have been corrected. I tested the emergency off which functioned correctly.
Zoning Approval Temp4/13/20164/13/20164/13/2016 PASS
DetailsJosh Wilson
Bond is in place for landscaping and fencing. 180 day ok.
JGW 4-13-16
FIRE-Final Inspection4/11/20164/12/20164/12/2016PFAIL
DetailsJim Page
Signage reading "Door to remain unlocked when building is occupied" needs to be installed at main entry. The main entry has a double keyed deadbolt assembly installed, this deadbolt is going to remain, the northeast exterior exit door also has double keyed deadbolt, this door needs single action door hardware installed, one double keyed deadbolt is allowed. CO2 tank located in the storage room of building needs to be in place and secured from possible tipping before next inspection. Provide small documentation that is associated with city approved drawings at next inspection.
BLD-Ceiling Grid Inspection3/30/20163/30/20163/30/2016PPASS
DetailsJim Storey
Kenny Phone #: ###-####
BLD-Energy code compliance2/16/20162/17/20162/17/2016APASS
DetailsJim Storey
Insulation // Kenny Phone #: ###-####
BLD-Framing/Rough-in2/11/20162/12/20162/12/2016PPASS
DetailsJim Storey
Kenny Phone #: ###-#### pending roof insulation value
BLD-Other1/22/20161/25/20161/25/2016PPASS
DetailsJim Storey
Kenny/// roof nailing inspection Phone #: ###-#### roof straps and nailling ok to cover //need r22 verified.
BLD-Foundation12/22/201512/23/201512/23/2015APASS
DetailsJim Storey
Kenny-rebar wall-pour time 11:00 Phone #: ###-#### pending si report
BLD-Foundation12/21/201512/22/201512/22/2015APART
DetailsJim Storey
KENNY-- POUR TIME IS 8AM Phone #: ###-#### placed wiyh si
BLD-Foundation12/9/201512/10/201512/10/2015APASS
DetailsJim Sly
Kenny Phone #: ###-####
BLD-Foundation11/30/201512/1/201512/1/2015APASS
DetailsJim Storey
Kenny// pour time is 11am Phone #: ###-####
Issue PAID IN FULL permit  11/30/2015 DONE
Print Occupancy Form  11/30/2015 DONE
OVERRIDE  11/23/2015  
Plan assigned to (CDM)11/3/201511/3/201511/23/2015 PASS
DetailsCarl D Madsen
First review completed
Routing - PLAN CHECK11/19/2015 11/23/2015 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL11/19/2015 11/23/2015 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  11/23/2015 DONE
Permit Ready to Issue  11/23/2015 DONE
Needs; Responsible Person, **MET** GC Form,**MET** Revised Cert of Value
Route to Impact Fee Review11/19/201511/22/201511/19/2015 PASS
DetailsCindy M. Gould
1st review completed  11/19/2015 FAIL
Routing - PLAN CHECK11/3/2015 11/19/2015 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL11/3/2015 11/19/2015 FAIL
DetailsCarl D Madsen
Routing PW Sewer Design11/4/2015 11/18/2015 PASS
DetailsKyle S. Rosenmeyer
Routing - PLANNING11/3/2015 11/10/2015 PASS
DetailsLeon Letson
CUP15-00022
Routing - Design Review11/3/2015 11/10/2015 PASS
DetailsJosh Wilson
Ok per DRH15-00146
Routing PW Environmental11/4/2015 11/10/2015 PASS
DetailsRick Christenson
Routing - PLUMBING11/3/2015 11/9/2015 PASS
DetailsDaryl Spivey
1) ASSE 1070 mixing valves required at the public lavs
2) verify interceptor detail with public works pretreatment
3) connect N.P. water line branch downstream of premise protection
4) additional cross connection protection may be required
Routing - FIRE11/3/201511/3/201511/4/2015 PASS
DetailsKatie Marron
Comments attached to case.
Routing - PLANNING Land Div11/3/2015 11/4/2015 PASS
DetailsDave Abo
ROS #3428
Routing - Addressing11/3/2015 11/4/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS11/3/2015 11/4/2015 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment11/3/2015 11/4/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

(JACKSON'S FOOD STORE / CARWASH) Demolish existing 2,357 sq.ft store and replace with new 4,130 sq.ft store with car wash
Routing PW Sewer Rating11/4/2015 11/4/2015 PASS
DetailsBeverly Mountain
Routing PW Solid Waste11/4/2015 11/4/2015 PASS
DetailsMegan Durrell
Trash enclosure gates must swing open at least 120 degrees.
Routing PW Drainage11/4/2015 11/4/2015 PASS
DetailsBrian Murphy
Routing PW Street Lights11/4/2015 11/4/2015 PASS
DetailsMike D Hedge
No new street lighting required.
Intake Approval  11/3/2015 PASS
Pending Assignment by TLW11/3/2015 11/3/2015 DONE
DetailsTim L. Woodard
Intake Approval  9/25/2015 FAIL
DetailsJavier Guzman
Form #502 Checklist must be completed by the project’s Idaho-licensed design professional of record and uploaded with the plans and documents . The checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed. Incomplete submittals will not be accepted.
Application received  9/22/2015 DONE
Application submitted via PDS Online on Sep 22 2015 8:31AM