Permit Information
Permit NumberBLD15-03430
StatusFinaled
Name INTERIOR SYSTEMS INC
Site Address 350 N MILWAUKEE ST Unit: 2319
Project NameBTS - #2130
Customer Number 
ePlanReviewNo
Description
(Shell and Core – BTS #2130 – Interior Demo) This permit is to perform interior non-structural demo work only. This space was last remodeled for GGP offices under BLD97-02328. Scope of work: includes removal of non-bearing interior partition walls, removal of existing plumbing, removal of interior finishes, removal of all existing outlets and wiring back to the box or properly terminated above ceiling line, removal of some existing light fixtures. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Do not remove ceiling unless sprinkler coverage is able to be maintained in accordance with the Boise City Fire Dept. BCC resolution 13535 11-2-10 **TLW**.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 12/20/201512/28/2015 DONE
This permit finaled on the web by Dustin hanna
First Notice11/10/201511/10/201512/10/2015 DONE
DetailsMike Jordan
Mailed 12-11-15
BLD-Final11/9/201511/10/201511/10/2015APASS
DetailsMike Jordan
Robert Phone #: ###-####
DOC - Permit Finaled11/10/201511/10/201511/10/2015PPASS
DetailsMike Jordan
FIRE-Final Inspection11/10/201511/10/201511/10/2015PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final10/13/201510/14/201510/14/2015PNR
DetailsMike Jordan
Dustin Phone #: ###-####. Fire/life/safety final has failed.
FIRE-Final Inspection10/13/201510/14/201510/14/2015AFAIL
DetailsTroy Cobbley
Need suite number corrected, need the fire sprinkler system modified and the smoke evac system modifed due to the removal of the ceiling and wall systems. Also the Boise Fire Dept needs to be notified the system has been impaired.
Issue PAID IN FULL permit  10/6/2015 DONE
Plan assigned to (TLW)9/22/2015 9/28/2015 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK9/22/2015 9/28/2015 PASS
DetailsTim L. Woodard
1st review completed  9/28/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/28/2015 DONE
Case Summary (BLD)  9/28/2015 DONE
Permit Ready to Issue  9/28/2015 DONE
***ALL REQUIRMENTS MET 10-6-15 //CEV NEED GC form and Certificate of Value
Inspection Record Card- Bld  9/28/2015 DONE
Telephone call  9/28/2015 DONE
left message with customer letting him know that permit is ready and forms needed
Plans ACCEPTED BY PLAN TECH  9/22/2015 DONE
Intake Approval  9/22/2015 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  9/22/2015 DONE
Application received 9/22/2015