Second Notice | | 12/20/2015 | 12/28/2015 | | DONE |
|
|
|
This permit finaled on the web by Dustin hanna
|
First Notice | 11/10/2015 | 11/10/2015 | 12/10/2015 | | DONE |
Mike Jordan
|
|
|
Mailed 12-11-15
|
BLD-Final | 11/9/2015 | 11/10/2015 | 11/10/2015 | A | PASS |
Mike Jordan
|
|
|
Robert Phone #: ###-####
|
DOC - Permit Finaled | 11/10/2015 | 11/10/2015 | 11/10/2015 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 11/10/2015 | 11/10/2015 | 11/10/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 10/13/2015 | 10/14/2015 | 10/14/2015 | P | NR |
Mike Jordan
|
|
|
Dustin Phone #: ###-####. Fire/life/safety final has failed.
|
FIRE-Final Inspection | 10/13/2015 | 10/14/2015 | 10/14/2015 | A | FAIL |
Troy Cobbley
|
|
|
Need suite number corrected, need the fire sprinkler system modified and the smoke evac system modifed due to the removal of the ceiling and wall systems. Also the Boise Fire Dept needs to be notified the system has been impaired.
|
Issue PAID IN FULL permit | | | 10/6/2015 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 9/22/2015 | | 9/28/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 9/22/2015 | | 9/28/2015 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 9/28/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/28/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/28/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/28/2015 | | DONE |
|
|
|
***ALL REQUIRMENTS MET 10-6-15 //CEV NEED GC form and Certificate of Value
|
Inspection Record Card- Bld | | | 9/28/2015 | | DONE |
|
|
|
|
Telephone call | | | 9/28/2015 | | DONE |
|
|
|
left message with customer letting him know that permit is ready and forms needed
|
Plans ACCEPTED BY PLAN TECH | | | 9/22/2015 | | DONE |
|
|
|
|
Intake Approval | | | 9/22/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/22/2015 | | DONE |
|
|
|
|
Application received | | 9/22/2015 | | | |
|
|
|
|