BLD-Final | 6/29/2016 | 6/30/2016 | 6/30/2016 | P | PASS |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
DOC - Permit Finaled | 6/30/2016 | 6/30/2016 | 6/30/2016 | P | PASS |
Jim Sly
|
|
|
|
Zoning Approval | 6/20/2016 | 6/20/2016 | 6/20/2016 | | PASS |
Ted Vanegas
|
|
|
|
BLD-Energy code compliance | 1/7/2016 | 1/8/2016 | 1/8/2016 | A | PASS |
Tony Young
|
|
|
Insulation // Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 12/30/2015 | 12/31/2015 | 12/31/2015 | A | PASS |
Tony Young
|
|
|
Matt Phone #: ###-####,, verify seal package
|
Routing - MECHANICAL | 12/28/2015 | | 12/28/2015 | | PASS |
Troy James
|
|
|
resubmitted manual report
|
Plan Modification Accepted | | | 12/28/2015 | | DONE |
|
|
|
new manual j
|
Issue PAID IN FULL permit | | | 10/14/2015 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/24/2015 | 9/24/2015 | 9/30/2015 | A | DONE |
Brian McGowan
|
|
|
|
Plan assigned to (BJM) | 9/24/2015 | 9/24/2015 | 9/30/2015 | | DONE |
Brian McGowan
|
|
|
walk in
|
Routing - MECHANICAL | 9/24/2015 | | 9/30/2015 | | PASS |
Chad Schwendiman
|
|
|
|
1st review completed | | | 9/30/2015 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 9/30/2015 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/30/2015 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/30/2015 | | 9/30/2015 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/30/2015 | | DONE |
|
|
|
All Requirements Met
|
Telephone call | | | 9/30/2015 | | DONE |
|
|
|
Spoke with Dave Webster and informed him that his permit is ready to be picked up and the fee amount that is due
|
Print Statement | | | 9/30/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/30/2015 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/25/2015 | | DONE |
|
|
|
received (2) sets of Structural Calculations
|
Routing Walk-In (Zoning) | 9/24/2015 | 9/24/2015 | 9/24/2015 | A | PASS |
David Moser
|
|
|
DRH15-00335
|
1st review completed | | | 9/24/2015 | | FAIL |
Brian McGowan
|
|
|
Additional engineering and information is required. Plan must be routed through mechanical. Proposed Living Spaces do not meet Habitable minimums according to code.
|
Application received | | 9/24/2015 | | | |
|
|
|
|