Permit Information
Permit NumberBLD15-03474
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 465 W MAIN ST
Project NameYellowstone Partners
Customer Number 
ePlanReviewYes
Description
(YELLOWSTONE PARTNERS - DAVE HANSEN OFFICE – BELGRAVIA BUILDING – 1ST STORY) This building does not have a fire sprinkler system. Since this is an historic building, one-hour construction throughout is not required per the 1994 UCBC. To create one 1,463 square foot office tenant space by connecting two spaces located on the 1st story of the Belgravia Building. A new opening will be created in the common masonry wall between the two spaces. Work is to include a steel header and steel jambs to support the gravity load above the new opening per the submitted Structural Design. Special inspection is required for welding and epoxy anchors. It could not be determined when another opening in the wall was created and whether it had been approved. To also provide a header and trimmers at that existing opening per the submitted Structural Design unless a header and trimmers are already provided. The work is required to comply with the approved drawings, with the plan review report, with the Structural Design, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 8/21/20169/14/2016 DONE
DetailsCandy A. Nichols
First Notice 7/29/20168/11/2016 DONE
mailed 8-12-16
Print Occupancy Form  7/19/2016 DONE
Permanent Occupancy  7/19/2016 DONE
BLD-Final7/15/20167/18/20167/18/2016APASS
DetailsDave Hannah
Jade Phone #: ###-####
BLD-Final7/14/20167/15/20167/15/2016PNH
DetailsJim Storey
jade Phone #: ###-#### no access
BLD-Wall cover7/13/20167/14/20167/14/2016APASS
DetailsDave Hannah
Call half to meet there // Jade Phone #: ###-####
FIRE-Final Inspection7/14/20167/14/20167/14/2016PPASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguisher is in place with current inspection tag. Final life fire safety inspection passed/complete.
BLD-Conference6/22/20166/23/20166/23/2016APEND
DetailsDave Hannah
Please call ahead for access - Jade Phone #: ###-#### needs plans spec inspection and remove moldings
Print Occupancy Form  6/22/2016 DONE
Issue PAID IN FULL permit  6/16/2016 DONE
Print Occupancy Form  6/16/2016 DONE
Telephone call  6/14/2016 DONE
Left a message for Dave informing him just wanted to touch bases with him on this permit and ask that he give me a call when he gets a chance.
Telephone call  6/14/2016 DONE
Dave called back stating that the Architect is working with another contracting company that is willing to fill out the 302 and 306 form for this project. Dave stated that the contractor who did the work had passed away and they had to figure something out. So the architect of GC company are going over invoices and should have this forms in this week. (ending 3/17)
Telephone call  6/9/2016 DONE
Left a message for Dave stating that this permit needs to be picked up and paid for since the work has been done. Informed him again that we just need the GC to fill out the 302 and 306 form for us to put fees in.
Telephone call  6/9/2016 DONE
Dave called back stating that their contractor passed away and they are working with another contractor and their architect on filling out the 302 and 306 form. He said that they would bring them in next week (6/13-6/17)
CHANGE STATUS TO (RDY)  5/23/2016 DONE
Per Jason B. The work has been completed.
Telephone call  5/23/2016 DONE
Left a message for Dave ###-####, voice mail said Doug. Stating that this permit will need to be paid for and issue since the work has been completed. Will send an email to dave@yellowstonepartners.com
Permit EXPIRED  3/24/2016 DONE
Spoke with Jeff, 3/22, and he said to let the permit expire. Stated that he had told the customers mulitply times that the permit was ready to be picked up.
Telephone call  3/22/2016 DONE
Spoke with Jeff and he said to let the permit expire. Stated that he had told the customers mulitply times that the permit was ready to be picked up.
Telephone call  3/18/2016 DONE
Spoke with Jeff and he stated that he has told the customer that it's going to expire and said since they haven't picked it up to let it. I informed him that he could see if they would like him to send in an extension request to Jason B and that would give them another 180 days before it expires again
Telephone call  3/11/2016 DONE
Spoke with Jeff informing him that this permit is going to expire in 11 days. He stated that they keep telling the customer it's ready and he will tell them again.
Expiration Notice2/26/20163/18/20162/26/2016 DONE
DetailsBrittany Hill
Telephone call  2/12/2016 DONE
called Jeff and let him know we need GC form and Certificate of value and that these forms can be emailed to me
Plan assigned to (CJW)9/30/20159/30/201512/15/2015 PASS
DetailsCarl Westfall
(1st done) YELLOWSTONE PARTNERS (Oct 8 - 7 days) Level 2 - Belegravia building
Routing - PLAN CHECK12/14/2015 12/15/2015 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  12/15/2015 DONE
Permit Ready to Issue  12/15/2015 DONE
need GC and rev cert of val
Plan resubmittals received  12/14/2015 DONE
Routing - PLAN CHECK9/30/2015 10/13/2015 FAIL
DetailsCarl Westfall
Plan revisions required
1st review completed  10/13/2015 DONE
Plan resubmittals requested  10/13/2015 DONE
Routing - Addressing9/30/2015 9/30/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS9/30/2015 9/30/2015 PASS
DetailsBeverly Mountain
Intake Approval  9/30/2015 PASS
DetailsJavier Guzman
Intake Approval  9/25/2015 FAIL
DetailsDavid Ferguson
Please provide an analysis/evaluation from a structural engineer to address the gravity load provisions of IBC section 3404.3 and the demand capacity ratio provisions in section 3404.4.
Application received  9/24/2015 DONE
Application submitted via PDS Online on Sep 24 2015 11:05AM