BLD-Final | 3/16/2016 | 3/21/2016 | 3/21/2016 | A | PASS |
Tony Young
|
|
|
shane - call for access (office# ###-####) Phone #: ###-####
|
DOC - Permit Finaled | 3/21/2016 | 3/21/2016 | 3/21/2016 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 3/14/2016 | 3/15/2016 | 3/15/2016 | A | NR |
Tony Young
|
|
|
Justin Phone #: ###-####
|
BLD-Final | 3/11/2016 | 3/14/2016 | 3/14/2016 | P | NR |
Tony Young
|
|
|
Justin Phone #: ###-####
|
BLD-Conference | 1/12/2016 | 1/12/2016 | 1/12/2016 | P | PASS |
Tony Young
|
|
|
Justin Phone #: ###-####,, fire place ok to cover
|
BLD-Energy code compliance | 1/6/2016 | 1/6/2016 | 1/6/2016 | P | PART |
Tony Young
|
|
|
Insulation // Justin ###-#### office Phone #: ###-####,, ok to cover except fireplace area
|
BLD-Framing/Rough-in | 1/4/2016 | 1/4/2016 | 1/5/2016 | P | PART |
Tony Young
|
|
|
Justin Phone #: ###-####,, ok to insulate,, need fireplace inspected when it arrives from back order
|
BLD-Other | 12/22/2015 | 12/23/2015 | 12/23/2015 | A | PART |
Tony Young
|
|
|
Justin Phone #: ###-####,, soffit,, work in place,, will use L E D lights on 2 hour electrical box
|
BLD-Other | 12/21/2015 | 12/22/2015 | 12/22/2015 | P | PEND |
Tony Young
|
|
|
Justin Phone #: ###-####,, soffit,, work in progress,, need an electrical permit and approval for soffit cover from electrical
|
BLD-Wall Bracing | 12/18/2015 | 12/21/2015 | 12/21/2015 | P | PASS |
Tony Young
|
|
|
Justin Phone #: ###-####,, exterior ok
|
BLD-Foundation | 11/3/2015 | 11/4/2015 | 11/4/2015 | A | PART |
Tony Young
|
|
|
Derek Phone #: ###-####
|
BLD-Foundation | 11/3/2015 | 11/3/2015 | 11/3/2015 | P | PART |
Tony Young
|
|
|
Derek Phone #: ###-####,, most rebar up
|
BLD-Footing | 11/2/2015 | 11/2/2015 | 11/2/2015 | P | PART |
Tony Young
|
|
|
12:30 - Derek Phone #: ###-####
|
PubWorks Subgrade Approval | 10/29/2015 | 10/29/2015 | 10/29/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 10/26/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/26/2015 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 10/1/2015 | 10/1/2015 | 10/21/2015 | | DONE |
Brian McGowan
|
|
|
due 10/15 L2
|
OVERRIDE | | | 10/16/2015 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/16/2015 | | DONE |
|
|
|
|
Telephone call | | | 10/16/2015 | | DONE |
|
|
|
Left a message with Jodie, she stated Justin was on another call. Informed her the address for the permit and the amount that is due.
|
Case Summary (BLD) | | | 10/16/2015 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/16/2015 | | DONE |
|
|
|
all requirements met
|
Routing - PLAN CHECK | 10/8/2015 | | 10/16/2015 | | PASS |
David Ferguson
|
|
|
|
1st review completed | | | 10/15/2015 | | DONE |
Brian McGowan
|
|
|
|
Routing - FIRE | 10/7/2015 | | 10/8/2015 | | PASS |
Scott Arellano
|
|
|
No comments.
|
Routing - Erosion and Sediment | 10/1/2015 | | 10/5/2015 | | PASS |
Evan Jenkins
|
|
|
(ESC Site Prep inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 2,168 sq. ft., two story (main level 1,526 sq. ft., finished basement 642 sq. ft.) single family dwelling with 3 bedrooms, 2 and a half bathrooms, approximately 189 sq. ft. of covered patio/porch and a 600 sq. ft. attached garage
|
Routing - PLANNING | 10/5/2015 | | 10/5/2015 | | PASS |
Susan Riggs
|
|
|
The plans are approved per compliance with the red lined site plan which shows the tub and window seat encroaching into the into the required 5' side setback. The applicant is aware of the red line.
|
Routing - MECHANICAL | 9/29/2015 | | 10/1/2015 | | PASS |
Troy James
|
|
|
|
Plan assigned to (LEG) Tisha | 9/24/2015 | | 10/1/2015 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 9/28/2015 | | 9/29/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLANNING | 9/29/2015 | | 9/29/2015 | | FAIL |
Cody Riddle
|
|
|
Overhang into 5' side setback not allowed. Emailed applicant today. CER
|
Routing - Addressing | 9/24/2015 | | 9/28/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Grading-Hillside | | | 9/28/2015 | | PASS |
|
|
|
Not A hillside lot. No hillside requirements. Jason Taylor
|
Plans ACCEPTED BY PLAN TECH | | | 9/24/2015 | | DONE |
|
|
|
|
Intake Approval | | | 9/24/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/24/2015 | | DONE |
|
|
|
|
Application received | | 9/24/2015 | | | |
|
|
|
|
Routing - PLAN CHECK | | | | | |
Brian McGowan
|
|
|
|