Permit Information
Permit NumberBLD15-03489
StatusFinaled
Name BIG D CONSTRUCTION
Site Address 400 S CAPITOL BLVD
Project NameResidence Inn by Marriott
Customer Number 
ePlanReviewYes
Description
**PROJECT MANAGEMENT-Angie Brosious**(RESIDENCE INN BY MARRIOTT)PLAN MODIFICATION FOR IPE DECKING/ ACCESSIBLE ROUTE ON 3RD FLOOR DECK/ ADDITIONAL DETIALS FOR FINISH MATERIAL ON DECKS/CANOPIES AND PROJECTIOSN. FIRE SPRINKLER MODIFICATION REQUIRED FOR CHANGES RECIEVED. **AJS**11/28/17RFI206 PLAN MODIFICATION FOR SLAB FIX AND DOOR TO ALLEY OFF ELECTRICAL ROOM ONLY 2/1/17**AJA**PLAN MODIFICATION FOR RELCATED MECHANICAL UNIT RFI 0131 12/2/16** PLAN MODIFICATION FOR CCD15 AND CCD15.1 ONLY **AJS** Permit to construct a new 204,396 square foot hotel / restaurant / assembly high-rise building. PLAN MODIFICATION 4-7-16 - Modification submitted to change cast iron plumbing to ABS plumbing. **TLW** This building consists of 8 stories of residential hotel above two stories of parking garage / restaurant. A foundation permit was issued for this project under BLD15-02707. Work to include: construction of new rated concrete building, new plumbing, new electrical, new mechanical, new fire sprinklers, new shafts, new interior partitions, and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is to be fully fire sprinklered with an NFPA 13 system and fully alarmed with a NFPA 72 system. **TLW** //// REFERENCE BLD15-02707 FOR INSPECTIONS PRIOR TO 8/16/17 (Concrete/Framing/Energy) -- ALD
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/17/2018 DONE
Print Statement  2/22/2018 DONE
First Notice 2/3/20182/12/2018 DONE
Mailed 2-13-18
Permanent Occupancy  1/24/2018 DONE
Zoning Approval1/23/20181/23/20181/23/2018 PASS
DetailsSarah Schafer
PubWorks Occupancy Approval1/23/20181/23/20181/23/2018 DONE
DetailsTiffany Lowery
BLD-Final1/18/20181/18/20181/19/2018PPASS
DetailsDave Hannah
Nathan Phone #: ###-####
BLD-Final1/17/20181/18/20181/19/2018APASS
DetailsDave Hannah
Nathan Phone #: ###-####
BLD-Final1/19/20181/19/20181/19/2018PPASS
DetailsDave Hannah
FIRE-Final Inspection1/19/20181/19/20181/19/2018PPASS
DetailsJim Page
Final life fire safety inspection complete.
Temporary Occupancy1/19/20181/31/20181/19/2018 DONE
DetailsChristina Prado
to update status back to TMP
CHANGE STATUS TO (ISS)  1/17/2018 DONE
OVERRIDE  11/28/2017  
Plan assigned to (AJS)11/7/201711/7/201711/28/2017 PASS
DetailsAdele J Schaffeld-Griffin
Plan Modification
Routing - PLAN CHECK11/28/2017 11/28/2017 PASS
DetailsAdele J Schaffeld-Griffin
PLAN MODIFICATION FOR IPE DECKING/ ACCESSIBLE ROUTE ON 3RD FLOOR DECK/ ADDITIONAL DETIALS FOR FINISH MATERIAL ON DECKS/CANOPIES AND PROJECTIOSN. FIRE SPRINKLER MODIFICATION REQUIRED FOR CHANGES RECIEVED. **AJS**11/28/17
Permit Ready to Issue  11/28/2017 DONE
PLAN MOD - DO NOT REISSUE
Routing - PLAN CHECK11/21/2017 11/21/2017 FAIL
DetailsAdele J Schaffeld-Griffin
BLD-Other11/15/201711/16/201711/16/2017APASS
DetailsDave Hannah
Nathan-energy in the floor Phone #: ###-####
FIRE-Conference11/15/201711/16/201711/16/2017ADONE
DetailsJim Page
Fire conference complete, mineral wool is installed over the foam that was exposed in the penthouse spaces.
BLD-Other11/13/201711/13/201711/13/2017PCANC
DetailsDave Hannah
Penthouse insulation - Nathan Phone #: ###-#### // cancelled per Nathan 9:39am 11/13 //leg
FIRE-Conference11/13/201711/13/201711/13/2017PCANC
DetailsJim Page
Penthouse insulation - Nathan Phone #: ###-#### // cancelled per Nathan 9:39am 11/13 //leg
Routing - PLAN CHECK11/7/2017 11/9/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - FIRE11/7/201711/7/201711/8/2017 PASS
DetailsScott Arellano
No change from previous approval.
Routing - Design Review11/7/2017 11/8/2017 PASS
DetailsSarah Schafer
Plan Modification Accepted  11/7/2017 DONE
DetailsChristina Prado
Plan mod requested for clarification of level 3 exterior soffits and raised flooring at the outdoor deck
Temporary Occupancy11/2/20171/31/201811/2/2017 DONE
DetailsTisha Gallop
FIRE-Final Inspection10/27/201710/30/201710/30/2017APART
DetailsTroy Cobbley
TCO for 10th floor and all level 02 Rooms.

Scott Phone #: ###-####
BLD-Final10/27/201710/27/201710/30/2017PPART
DetailsDave Hannah
Scott Phone #: ###-#### Requesting TCO for balance of project (10th floor and 02 rooms).ok to occ 10th
FIRE-Final Inspection10/27/201710/27/201710/27/2017PCANC
DetailsTroy Cobbley
Need to cancel due to time constraints. Scott is going to reschedule for monday.

Scott Phone #: ###-#### Requesting TCO for balance of project (10th floor and 02 rooms).
BLD-Final10/16/201710/17/201710/17/2017APART
DetailsDave Hannah
Garage- TCO- Scott Phone #: ###-#### ok for temp occ on second floorparking garage
FIRE-Final Inspection10/16/201710/17/201710/17/2017APART
DetailsJim Page
Life fire safety inspection for level 2 TCO complete. Chemical placard will be placed on door of pool pump/chemical storage for swimming pool, placard will be verified at final BLD life fire safety inspection for project.
Temporary Occupancy10/17/20171/15/201810/17/2017 DONE
DetailsChristina Prado
Excluding 10th floor and 02 rooms on all levels.
FIRE-Conference10/12/201710/12/201710/12/2017PDONE
DetailsJim Page
Walk through with Boise Fire department complete.
Plan assigned to (AJS)10/9/201710/9/201710/11/2017 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK10/11/2017 10/11/2017 PASS
DetailsAdele J Schaffeld-Griffin
ASI 036 Only penthouse thermal envelope location
Permit Ready to Issue  10/11/2017 DONE
DO NOT REISSUE - plan mod, fee due, all requirements met
CHANGE STATUS TO (ISS)  10/11/2017 DONE
BLD-Final10/10/201710/10/201710/10/2017PPEND
DetailsDave Hannah
Temp Occ to open hotel // Scott Phone #: ###-#### ok for temp occ on 1st floor and floors 3thru 9 ok for genral public
FIRE-Final Inspection10/10/201710/11/201710/10/2017APART
DetailsJim Page
Life fire safety for level 3 TCO complete, double key deadbolts on the northwest patio's off of capitol room will stay per conversation between Dave Hannah and I, signage will need to be installed reading "Door to remain unlocked while occupied". All construction debris will need to be removed from level 3 patio area before access of personnel other than construction is allowed. Gaurds will need to be installed around fire pit areas before final C of O.
Temporary Occupancy10/10/20171/8/201810/10/2017 DONE
DetailsChristina Prado
CHANGE STATUS TO (REV)  10/10/2017 DONE
DetailsChristina Prado
TCO issued, permit still under review for plan mod
BLD-Final10/6/201710/9/201710/9/2017PPART
DetailsDave Hannah
Chandler Phone #: ###-#### ok for temp occ staff only
FIRE-Final Inspection10/6/201710/9/201710/9/2017APART
DetailsJim Page
Signature for life fire safety TCO requested has been completed for public occupancy excluding 2nd and 10th floors and also excluding the 3rd floor.
Plan Modification Accepted  10/9/2017 DONE
Plan mod workfloow started to relocate rigid insulation from penthouse roofs to penthouse floors and cover rigid insulation with 1-1/2" mineral wool insulation as an ignition barrier per section 26034.1.6 of the IBC.
FIRE-Final Inspection10/6/201710/6/201710/6/2017PPART
DetailsJim Page
Defeciency list items for TCO requested levels, level 1 and levels 4 through 9 have been repaired with exception to the areas missing the photo luminescent tape on the handrails, Life fire safety inspection complete for TCO covered areas, TCO authorized for life fire safety per conversation with Ron Johnson.
PubWorks Temp Occupancy Appr10/6/201710/6/201710/6/2017 DONE
DetailsTiffany Lowery
BLD-Final10/3/201710/5/201710/5/2017PNR
DetailsDave Hannah
George Phone #: ###-####
FIRE-Final Inspection10/4/201710/5/201710/5/2017AFAIL
DetailsJim Page
Life fire safety deficiency list sent by email to Scott, Project Manager.
Zoning Approval Temp10/5/201710/5/201710/5/2017 PASS
DetailsSarah Schafer
Partial Temporary occupancy allowed per the approved building department TCO document. Main exterior work is complete. Some work such as planter fencing, mulch, plaza area at SWC, etc will need to be completed prior to final occupancy or a bond received.
BLD-Ceiling Grid Inspection9/20/20179/20/20179/20/2017PPASS
DetailsDave Hannah
ceiling for common areas level 3 // George Phone #: ###-####
FIRE-Conference9/12/20179/12/20179/12/2017PDONE
DetailsJim Page
Fire conference for TCO discussion complete.
BLD-Framing/Rough-in9/7/20179/7/20179/7/2017PPASS
DetailsDave Hannah
George, ceiling level 3 corridor and fitness room Phone #: ###-####
BLD-Framing/Rough-in8/30/20178/31/20178/31/2017APASS
DetailsDave Hannah
Nathan Phone #: ###-####
Print Occupancy Form  8/31/2017 DONE
BLD-Ceiling Grid Inspection8/30/20178/30/20178/30/2017PPASS
DetailsDave Hannah
George Phone #: ###-####
FIRE-Conference8/23/20178/24/20178/24/2017ADONE
DetailsJim Page
Fire conference complete
BLD-Ceiling Grid Inspection8/17/20178/21/20178/23/2017PPASS
DetailsDave Hannah
Nathan Phone #: ###-####
BLD-Framing/Rough-in8/16/20178/17/20178/17/2017APART
DetailsDave Hannah
Nate, overhead ceiling tile for 1st floor Phone #: ###-#### needs to fire stop wall pent
BLD-Other8/17/20178/17/20178/17/2017ADONE
DetailsAlexandra L. DeYoung
REFERENCE BLD15-02707 FOR INSPECTIONS PRIOR TO 8/16/17 (Concrete/Framing/Energy) -- ALD
BLD-Ceiling Grid Inspection8/10/20178/11/20178/11/2017APART
DetailsBrandon Shaw
02 Rooms-
Level 3-10, 1 bedroom Kings, Soithwest corner
BLD-Other8/10/20178/10/20178/10/2017PPASS
DetailsBrandon Shaw
Llinen shoot fire proofing, OK
CHANGE STATUS TO (ISS)  7/21/2017 DONE
Plan assigned to (AJS)2/13/20172/13/20173/29/2017 PASS
DetailsAdele J Schaffeld-Griffin
Routing - MECHANICAL3/28/2017 3/29/2017 PASS
DetailsTroy James
Routing - PLAN CHECK3/28/2017 3/29/2017 PASS
DetailsAdele J Schaffeld-Griffin
10th floor confrence room change
Permit Ready to Issue  3/29/2017 DONE
DO NOT REISSUE PLAN MOD
Routing - PLAN CHECK2/15/2017 3/13/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Plan mod for confrence room on 10th floor change
Routing - Design Review2/15/2017 2/23/2017 PASS
DetailsSarah Schafer
Approved per the Modification.
Routing - PLUMBING2/15/2017 2/17/2017 PASS
DetailsBill VanDegrift
added conference roon on the 10th floor, ok
Routing - FIRE2/15/20172/15/20172/16/2017 PASS
DetailsKatie Marron
Revised report attached to case
Routing - MECHANICAL2/15/2017 2/16/2017 FAIL
DetailsTroy James
Routing - PUBLIC WORKS2/15/2017 2/15/2017 PASS
DetailsRachael Beierle
CREDITS AVAILABLE.
Routing PW Drainage2/15/2017 2/15/2017 PASS
DetailsBrian Murphy
Plan Modification Accepted  2/13/2017  
CHANGE STATUS TO (ISS)  2/9/2017 DONE
Plan assigned to (AJS)12/12/201612/12/20162/1/2017 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Design Review1/24/2017 2/1/2017 PASS
DetailsSarah Schafer
Routing - PLAN CHECK1/24/2017 2/1/2017 PASS
DetailsAdele J Schaffeld-Griffin
RFI SLAB FIX AND DOOR TO ALLEY OFF ELECTRICAL ROOM ONLY
Routing Off Site - STRUCTURAL1/24/2017 2/1/2017 PASS
DetailsAdele J Schaffeld-Griffin
RFI206 SLAB FIX
Permit Ready to Issue  2/1/2017 DONE
PLEASE DO NOT RE ISSUE
Routing Off Site - STRUCTURAL1/3/2017 1/17/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK1/3/2017 1/17/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLUMBING1/3/2017 1/9/2017 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - MECHANICAL1/3/2017 1/3/2017 PASS
DetailsTroy James
BLD-Framing/Rough-in12/12/201612/13/201612/13/2016APASS
DetailsDave Hannah
level 4 roof framing - James Phone #: ###-####
Routing - PLAN CHECK12/13/2016 12/13/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Jonathan,

I just received a plan modification for slab edge corrections. I am unable to accept this plan modification with the documents that you submitted. Please submit revised drawings with the engineers stamp and supporting stamped calculations. Also there are 2 mechanical drawings that were uploaded, see below for example. All drawings for permits shall be stamped by the design professional of record. Also there is no explanation for the mechanical drawings.

The plan modification application is incomplete, there is no attached list for drawings that have changed.
Plan Modification Accepted  12/12/2016 DONE
DetailsChristina Prado
Plan Mod requested for updates to mech room 125 and structural slab heaving fix
Plan assigned to (AJS)9/22/20169/22/201612/2/2016 PASS
DetailsAdele J Schaffeld-Griffin
Plan modification Marriott
Routing - PLAN CHECK12/2/2016 12/2/2016 PASS
DetailsAdele J Schaffeld-Griffin
rfe 0131 only
Permit Ready to Issue  12/2/2016 DONE
DO NOT REISSUE PLAN MOD
Routing - MECHANICAL11/29/2016 12/1/2016 PASS
DetailsTroy James
Routing - MECHANICAL11/21/2016 11/22/2016 FAIL
DetailsTroy James
Print Statement  11/21/2016 DONE
Routing Off Site - STRUCTURAL11/21/2016 11/21/2016 PASS
DetailsAdele J Schaffeld-Griffin
structural upgrade of the 10th floor slab at the NW corner to accomodate potential of added loading.
Print Statement  11/18/2016 DONE
Routing - MECHANICAL10/21/2016 10/24/2016 FAIL
DetailsTroy James
Provide revised duct design for relocating RTU-1 from grid line 1 to gride line 5.
Routing - MECHANICAL9/23/2016 10/3/2016 FAIL
DetailsTroy James
Routing - Design Review9/30/2016 9/30/2016 PASS
DetailsSarah Schafer
signed off on CCD15 and CCD15.1 in e plan
Routing - PLAN CHECK9/23/2016 9/30/2016 PASS
DetailsAdele J Schaffeld-Griffin
CCD15 AND CCD15.1 CHANGES ONLY
Plan Modification Accepted  9/22/2016 DONE
DetailsChristina Prado
Chnage to VTAC
Telephone call  9/15/2016 DONE
had a message from Dave about fees due- called back- left a message of amount due and how to go online and pay those fees- KRS
Plan assigned to (AJS)8/24/20168/24/20169/8/2016 PASS
DetailsAdele J Schaffeld-Griffin
Marriott, out at structural for review
Routing Off Site - STRUCTURAL9/8/2016 9/8/2016 PASS
DetailsAdele J Schaffeld-Griffin
Permit Ready to Issue  9/8/2016 DONE
DO NOT ISSUE PLAN MOD
BLD-Concrete  8/29/2016PPART
DetailsMike Jordan
Routing Off Site - STRUCTURAL8/26/2016 8/26/2016 FAIL
DetailsAdele J Schaffeld-Griffin
plan modification failed structural review
Plan assigned to (TLW)7/21/2016 8/24/2016 DEFR
DetailsTim L. Woodard
BLD-Conference  8/19/2016PDEFR
DetailsMike Jordan
BLD-Concrete  8/16/2016PDEFR
DetailsMike Jordan
BLD-Concrete  8/9/2016PPEND
DetailsDave Hannah
BLD-Concrete  8/5/2016PPEND
DetailsDave Hannah
BLD-Concrete  7/28/2016PPEND
DetailsDave Hannah
Plan Modification Accepted  7/21/2016 DONE
DetailsChristina Prado
Plan mod requested for structural changes to parking slab
BLD-Concrete7/13/20167/13/20167/14/2016PPEND
DetailsDave Hannah
Level 4 south PT deck reinforcement. Structural Engineer has been onsite and has reviewed. SI has been on site and is scheduled for the pour. Concrete pour scheduled for 9:30 pm tonight. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Concrete7/7/20167/8/20167/8/2016APEND
DetailsDave Hannah
Walls at elevator core level 3-4, misc. columns. concrete scheduled for 10 am Saturday. MTI has been on site for periodic special inspections and is also scheduled. Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Foundation6/14/20166/14/20166/27/2016APASS
DetailsDave Hannah
Foundation wall stair core 2 level 2-3. MTI has been onsite for progress inspections and is scheduled. Concrete scheduled for 10 am tomorrow.

PT deck level 3 pour 1 is ready. Concrete scheduled for Wednesday 9 pm Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Concrete6/24/20166/24/20166/24/2016APART
DetailsMike Jordan
PT suspended slab Pour #2 level 3. SI has been doing periodic inspections all week. SI will be onsite today and for pour. Concrete scheduled for 10 pm tonight. Phone #: ###-#### Inspection requested via web by Jim Williams. Work in progress.
ok after special inspection has signed off.
BLD-Conference6/1/20166/2/20166/14/2016APEND
DetailsDave Hannah
stair core 3 level 2.Concrete scheduled for 3pm. SI scheduled and will be onsite. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Foundation5/12/20165/12/20165/12/2016APASS
DetailsDave Hannah
pool wall level 2. PT suspended slab level 2 pour 3. Concrete scheduled for 2 am 5/13 for PT deck. Friday afternoon 2 pm. Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Concrete4/28/20164/28/20165/5/2016PPART
DetailsDave Hannah
PT suspended concrete slab level 2 pour 2. Concrete scheduled for 2 am 4/29. Elevator core wall reinforcement. 100''- 116'' elevation. MTI has been on site and conducted inspected. SS is scheduled to be on site for pours. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Foundation5/3/20165/3/20165/4/2016PPEND
DetailsDave Hannah
Stair core 1 from elevation 116'' to 127'' rebar, Concrete scheduled for 5/4 2pm. Would like to begin buttoning up forms this afternoon Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Concrete4/12/20164/12/20164/14/2016PPEND
DetailsDave Hannah
Suspended PT level 2 deck Grid lines A-H 6.5-10 pour 1 of three.
Structural engineer and MTI have been onsite and reviewed. Concrete scheduled for 3 am tomorrow.

FR 16x20 footing Grids 1-H Concrete schedules 4 pm today Phone #: ###-#### Inspection requested via web by Jim Williams
Plan assigned to (TLW)3/11/2016 4/7/2016 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK4/7/2016 4/7/2016 PASS
DetailsTim L. Woodard
Permit Ready to Issue  4/7/2016 DONE
Plan Mod approved, all requirements met and no fees due
CHANGE STATUS TO (ISS)  4/7/2016 DONE
Plan Mod approved, all requirements met and no fees due
Routing - PLUMBING3/22/2016 3/22/2016 PASS
DetailsBill VanDegrift
Provide protection in acordance with the building code for PEX and PVC
BLD-Footing3/9/20163/10/20163/11/2016APEND
DetailsDave Hannah
FS footing grid line C 1.9 and 3, Columns grid C-4 , D.5-5 and B-6 Phone #: ###-#### Inspection requested via web by Jim Williams
Plan Modification Accepted  3/11/2016 DONE
DetailsChristina Prado
Plan Modification requested by arch firm - to change approved cast iron drain pipe to PVC Drain Pipe, add Pex supply lines where permitted by code, add additional smoke control fans to public areas and guest room corridors
BLD-Foundation3/7/20163/7/20163/10/2016PPASS
DetailsDave Hannah
Stair 3 core walls , 4 columns grids H-7,C.5 6-7,C-5 2 pm concrete. SI has already reviewed rebar and will be on site. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Foundation2/29/20163/1/20163/2/2016APASS
DetailsDave Hannah
Perimeter foundation XY grid SW. Concrete pier Grid 5;6 at grid A. Concrete columns grid C.5 6.3-7. and grid H -7.Concrete scheduled for 2 pm SI has been scheduled and already inspected column reinforcement prior to form placement Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Footing2/18/20162/18/20162/19/2016APEND
DetailsDave Hannah
Footings Grid line A-1-3.5: Grid line 1 A-C. Concrete scheduled for 11:00 am. SI scheduled and will be onsite for pour. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Foundation2/15/20162/16/20162/18/2016PPEND
DetailsDave Hannah
Foundation reinforcement stair 1 grid line F 9-10, Column reinforcement grid lines 6-8 A-H Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Conference2/10/20162/11/20162/11/2016ADEFR
DetailsMike Jordan
FS footings and continuous exterior footings Grid line A 4-6.5; Exterior continuous footings. Grid line H 4-6.5 Concrete scheduled 8am SI has already reviewed rebar and is scheduled onsite for tomorrows pour. Phone #: ###-#### Inspection requested via web by Jim Williams. Special inspection has approved. Concrete placement in progress. Special inspector on site.
BLD-Foundation2/4/20162/4/20162/4/2016PPEND
DetailsDave Hannah
Grid line A 7-10, Grid line H 7-10, Tower crane base foundation. 10 am Friday concrete scheduled. Phone #: ###-#### Inspection requested via web by Jim Williams ok after s/i sign off
BLD-Foundation1/29/20161/29/20162/1/2016APASS
DetailsDave Hannah
3'' Foundation wall Grid line 10- B.8-H; Grid line H 8.8-10. Concrete scheduled for 2 pm. Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Footing1/27/20161/28/20161/28/2016APART
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Jim Williams
Inspection of Select large footing pads for columns.........OK pending MTI special inspections, tests and approvals.
Issue PAID IN FULL permit  12/9/2015 DONE
Inspection Record Card- Bld  12/9/2015 DONE
Routing - FIRE12/4/201512/4/201512/8/2015 PASS
DetailsKatie Marron
Revised report attached to case.
PLANS/APPL TAKEN TO FRONT DESK  12/8/2015 DONE
Permit Ready to Issue  12/8/2015 DONE
DetailsChristina Prado
need ACHD, GC & Rev Cert of val

All requirements met as of 12/9/2015///cdp
Plan assigned to (TLW)9/29/2015 12/8/2015 PASS
DetailsTim L. Woodard
Oct 27 is 20 days. TLW
Routing - PLUMBING12/4/2015 12/8/2015 PASS
DetailsDaryl Spivey
per plans and ISPC
Plan resubmittals received  12/4/2015 DONE
Routing - PLAN CHECK12/4/2015 12/4/2015 PASS
DetailsTim L. Woodard
Routing Off Site - STRUCTURAL11/9/2015 12/2/2015 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK11/9/2015 12/2/2015 FAIL
DetailsTim L. Woodard
Routing - MECHANICAL11/9/2015 11/18/2015 PASS
DetailsTroy James
Routing - PLUMBING11/9/2015 11/13/2015 FAIL
DetailsDaryl Spivey
you added this detail reference, 8/M2.1. on page P2.6 detail not shown as submitted, submit m2.1 showing HX-1 being double wall with leak detection.
Route to Impact Fee Review11/9/201511/12/201511/12/2015 PASS
DetailsCindy M. Gould
Routing PW Street Lights11/9/2015 11/10/2015 PASS
DetailsMike D Hedge
Routing - FIRE11/9/201511/9/201511/9/2015 FAIL
DetailsKatie Marron
Not all comments were addressed. Revised report attached to case and emailed to architect.
Plan resubmittals received  11/6/2015  
1st review completed  10/29/2015 DONE
DetailsTim L. Woodard
Routing PW Environmental9/29/2015 10/26/2015 PASS
DetailsRick Christenson
Routing - PLAN CHECK9/29/2015 10/25/2015 FAIL
DetailsTim L. Woodard
Routing PW Solid Waste9/29/2015 10/23/2015 PASS
DetailsPeter J. McCullough
Routing - PLUMBING9/29/2015 10/12/2015 FAIL
DetailsDaryl Spivey
1) waste connections to stacks with suds producing fixtures must be 8 feet vertical or harizontal from horizontal offset.
2) riser diagrams 1,2,11,14,15,20 and 21 are overloaded at the horizontal offset.
3) provide information on HX-1 showing double wall with leak detection.
4) vent waste branches on combination waste and vent system over 15 feet.
5)verify interceptor designs with public works pretreatment.
Routing - FIRE9/29/20159/29/201510/8/2015 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
Routing Off Site - STRUCTURAL9/29/2015 10/8/2015 FAIL
DetailsTim L. Woodard
Routing - MECHANICAL9/29/2015 10/8/2015 FAIL
DetailsTroy James
Routing - Addressing9/29/2015 10/5/2015 PASS
DetailsEmily Dixon
Address changed to 400 S Capitol Blvd.
Routing - Design Review9/29/2015 10/1/2015 PASS
DetailsSarah Schafer
Approved in E-Plan. TLW
Routing PW Street Lights9/29/2015 10/1/2015 FAIL
DetailsMike D Hedge
Additional info required, see markups in e plan.
Routing PW Sewer Design9/29/2015 10/1/2015 PASS
DetailsKyle S. Rosenmeyer
Routing PW Drainage9/29/2015 9/30/2015 PASS
DetailsBrian Murphy
Routing - PLANNING Land Div9/29/2015 9/30/2015 PASS
DetailsDave Abo
ROS 10211
Routing PW Sewer Rating9/29/2015 9/30/2015 PASS
DetailsBeverly Mountain
Routing PW Geothermal9/29/2015 9/29/2015 PASS
DetailsJon R. Gunnerson
coordinate geothermal connection with Public Works, Jon Gunnerson ###-####
Routing - PUBLIC WORKS9/29/2015 9/29/2015 PASS
DetailsBeverly Mountain
Pending Assignment by TLW9/29/2015 9/29/2015 DONE
DetailsTim L. Woodard
Intake Approval  9/28/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Please see mark ups on check list for items needing addressed for pre screen.
Intake Approval  9/28/2015 PASS
DetailsTim L. Woodard
Application received  9/25/2015 DONE
Application submitted via PDS Online on Sep 25 2015 7:57AM