Case Summary (BLD) | | | 10/17/2018 | | DONE |
|
|
|
|
Print Statement | | | 2/22/2018 | | DONE |
|
|
|
|
First Notice | | 2/3/2018 | 2/12/2018 | | DONE |
|
|
|
Mailed 2-13-18
|
Permanent Occupancy | | | 1/24/2018 | | DONE |
|
|
|
|
Zoning Approval | 1/23/2018 | 1/23/2018 | 1/23/2018 | | PASS |
Sarah Schafer
|
|
|
|
PubWorks Occupancy Approval | 1/23/2018 | 1/23/2018 | 1/23/2018 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 1/18/2018 | 1/18/2018 | 1/19/2018 | P | PASS |
Dave Hannah
|
|
|
Nathan Phone #: ###-####
|
BLD-Final | 1/17/2018 | 1/18/2018 | 1/19/2018 | A | PASS |
Dave Hannah
|
|
|
Nathan Phone #: ###-####
|
BLD-Final | 1/19/2018 | 1/19/2018 | 1/19/2018 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 1/19/2018 | 1/19/2018 | 1/19/2018 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection complete.
|
Temporary Occupancy | 1/19/2018 | 1/31/2018 | 1/19/2018 | | DONE |
Christina Prado
|
|
|
to update status back to TMP
|
CHANGE STATUS TO (ISS) | | | 1/17/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 11/28/2017 | | |
|
|
|
|
Plan assigned to (AJS) | 11/7/2017 | 11/7/2017 | 11/28/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Plan Modification
|
Routing - PLAN CHECK | 11/28/2017 | | 11/28/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
PLAN MODIFICATION FOR IPE DECKING/ ACCESSIBLE ROUTE ON 3RD FLOOR DECK/ ADDITIONAL DETIALS FOR FINISH MATERIAL ON DECKS/CANOPIES AND PROJECTIOSN. FIRE SPRINKLER MODIFICATION REQUIRED FOR CHANGES RECIEVED. **AJS**11/28/17
|
Permit Ready to Issue | | | 11/28/2017 | | DONE |
|
|
|
PLAN MOD - DO NOT REISSUE
|
Routing - PLAN CHECK | 11/21/2017 | | 11/21/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
BLD-Other | 11/15/2017 | 11/16/2017 | 11/16/2017 | A | PASS |
Dave Hannah
|
|
|
Nathan-energy in the floor Phone #: ###-####
|
FIRE-Conference | 11/15/2017 | 11/16/2017 | 11/16/2017 | A | DONE |
Jim Page
|
|
|
Fire conference complete, mineral wool is installed over the foam that was exposed in the penthouse spaces.
|
BLD-Other | 11/13/2017 | 11/13/2017 | 11/13/2017 | P | CANC |
Dave Hannah
|
|
|
Penthouse insulation - Nathan Phone #: ###-#### // cancelled per Nathan 9:39am 11/13 //leg
|
FIRE-Conference | 11/13/2017 | 11/13/2017 | 11/13/2017 | P | CANC |
Jim Page
|
|
|
Penthouse insulation - Nathan Phone #: ###-#### // cancelled per Nathan 9:39am 11/13 //leg
|
Routing - PLAN CHECK | 11/7/2017 | | 11/9/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 11/7/2017 | 11/7/2017 | 11/8/2017 | | PASS |
Scott Arellano
|
|
|
No change from previous approval.
|
Routing - Design Review | 11/7/2017 | | 11/8/2017 | | PASS |
Sarah Schafer
|
|
|
|
Plan Modification Accepted | | | 11/7/2017 | | DONE |
Christina Prado
|
|
|
Plan mod requested for clarification of level 3 exterior soffits and raised flooring at the outdoor deck
|
Temporary Occupancy | 11/2/2017 | 1/31/2018 | 11/2/2017 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 10/27/2017 | 10/30/2017 | 10/30/2017 | A | PART |
Troy Cobbley
|
|
|
TCO for 10th floor and all level 02 Rooms.
Scott Phone #: ###-####
|
BLD-Final | 10/27/2017 | 10/27/2017 | 10/30/2017 | P | PART |
Dave Hannah
|
|
|
Scott Phone #: ###-#### Requesting TCO for balance of project (10th floor and 02 rooms).ok to occ 10th
|
FIRE-Final Inspection | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | CANC |
Troy Cobbley
|
|
|
Need to cancel due to time constraints. Scott is going to reschedule for monday.
Scott Phone #: ###-#### Requesting TCO for balance of project (10th floor and 02 rooms).
|
BLD-Final | 10/16/2017 | 10/17/2017 | 10/17/2017 | A | PART |
Dave Hannah
|
|
|
Garage- TCO- Scott Phone #: ###-#### ok for temp occ on second floorparking garage
|
FIRE-Final Inspection | 10/16/2017 | 10/17/2017 | 10/17/2017 | A | PART |
Jim Page
|
|
|
Life fire safety inspection for level 2 TCO complete. Chemical placard will be placed on door of pool pump/chemical storage for swimming pool, placard will be verified at final BLD life fire safety inspection for project.
|
Temporary Occupancy | 10/17/2017 | 1/15/2018 | 10/17/2017 | | DONE |
Christina Prado
|
|
|
Excluding 10th floor and 02 rooms on all levels.
|
FIRE-Conference | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | DONE |
Jim Page
|
|
|
Walk through with Boise Fire department complete.
|
Plan assigned to (AJS) | 10/9/2017 | 10/9/2017 | 10/11/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 10/11/2017 | | 10/11/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
ASI 036 Only penthouse thermal envelope location
|
Permit Ready to Issue | | | 10/11/2017 | | DONE |
|
|
|
DO NOT REISSUE - plan mod, fee due, all requirements met
|
CHANGE STATUS TO (ISS) | | | 10/11/2017 | | DONE |
|
|
|
|
BLD-Final | 10/10/2017 | 10/10/2017 | 10/10/2017 | P | PEND |
Dave Hannah
|
|
|
Temp Occ to open hotel // Scott Phone #: ###-#### ok for temp occ on 1st floor and floors 3thru 9 ok for genral public
|
FIRE-Final Inspection | 10/10/2017 | 10/11/2017 | 10/10/2017 | A | PART |
Jim Page
|
|
|
Life fire safety for level 3 TCO complete, double key deadbolts on the northwest patio's off of capitol room will stay per conversation between Dave Hannah and I, signage will need to be installed reading "Door to remain unlocked while occupied". All construction debris will need to be removed from level 3 patio area before access of personnel other than construction is allowed. Gaurds will need to be installed around fire pit areas before final C of O.
|
Temporary Occupancy | 10/10/2017 | 1/8/2018 | 10/10/2017 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (REV) | | | 10/10/2017 | | DONE |
Christina Prado
|
|
|
TCO issued, permit still under review for plan mod
|
BLD-Final | 10/6/2017 | 10/9/2017 | 10/9/2017 | P | PART |
Dave Hannah
|
|
|
Chandler Phone #: ###-#### ok for temp occ staff only
|
FIRE-Final Inspection | 10/6/2017 | 10/9/2017 | 10/9/2017 | A | PART |
Jim Page
|
|
|
Signature for life fire safety TCO requested has been completed for public occupancy excluding 2nd and 10th floors and also excluding the 3rd floor.
|
Plan Modification Accepted | | | 10/9/2017 | | DONE |
|
|
|
Plan mod workfloow started to relocate rigid insulation from penthouse roofs to penthouse floors and cover rigid insulation with 1-1/2" mineral wool insulation as an ignition barrier per section 26034.1.6 of the IBC.
|
FIRE-Final Inspection | 10/6/2017 | 10/6/2017 | 10/6/2017 | P | PART |
Jim Page
|
|
|
Defeciency list items for TCO requested levels, level 1 and levels 4 through 9 have been repaired with exception to the areas missing the photo luminescent tape on the handrails, Life fire safety inspection complete for TCO covered areas, TCO authorized for life fire safety per conversation with Ron Johnson.
|
PubWorks Temp Occupancy Appr | 10/6/2017 | 10/6/2017 | 10/6/2017 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 10/3/2017 | 10/5/2017 | 10/5/2017 | P | NR |
Dave Hannah
|
|
|
George Phone #: ###-####
|
FIRE-Final Inspection | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | FAIL |
Jim Page
|
|
|
Life fire safety deficiency list sent by email to Scott, Project Manager.
|
Zoning Approval Temp | 10/5/2017 | 10/5/2017 | 10/5/2017 | | PASS |
Sarah Schafer
|
|
|
Partial Temporary occupancy allowed per the approved building department TCO document. Main exterior work is complete. Some work such as planter fencing, mulch, plaza area at SWC, etc will need to be completed prior to final occupancy or a bond received.
|
BLD-Ceiling Grid Inspection | 9/20/2017 | 9/20/2017 | 9/20/2017 | P | PASS |
Dave Hannah
|
|
|
ceiling for common areas level 3 // George Phone #: ###-####
|
FIRE-Conference | 9/12/2017 | 9/12/2017 | 9/12/2017 | P | DONE |
Jim Page
|
|
|
Fire conference for TCO discussion complete.
|
BLD-Framing/Rough-in | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | PASS |
Dave Hannah
|
|
|
George, ceiling level 3 corridor and fitness room Phone #: ###-####
|
BLD-Framing/Rough-in | 8/30/2017 | 8/31/2017 | 8/31/2017 | A | PASS |
Dave Hannah
|
|
|
Nathan Phone #: ###-####
|
Print Occupancy Form | | | 8/31/2017 | | DONE |
|
|
|
|
BLD-Ceiling Grid Inspection | 8/30/2017 | 8/30/2017 | 8/30/2017 | P | PASS |
Dave Hannah
|
|
|
George Phone #: ###-####
|
FIRE-Conference | 8/23/2017 | 8/24/2017 | 8/24/2017 | A | DONE |
Jim Page
|
|
|
Fire conference complete
|
BLD-Ceiling Grid Inspection | 8/17/2017 | 8/21/2017 | 8/23/2017 | P | PASS |
Dave Hannah
|
|
|
Nathan Phone #: ###-####
|
BLD-Framing/Rough-in | 8/16/2017 | 8/17/2017 | 8/17/2017 | A | PART |
Dave Hannah
|
|
|
Nate, overhead ceiling tile for 1st floor Phone #: ###-#### needs to fire stop wall pent
|
BLD-Other | 8/17/2017 | 8/17/2017 | 8/17/2017 | A | DONE |
Alexandra L. DeYoung
|
|
|
REFERENCE BLD15-02707 FOR INSPECTIONS PRIOR TO 8/16/17 (Concrete/Framing/Energy) -- ALD
|
BLD-Ceiling Grid Inspection | 8/10/2017 | 8/11/2017 | 8/11/2017 | A | PART |
Brandon Shaw
|
|
|
02 Rooms- Level 3-10, 1 bedroom Kings, Soithwest corner
|
BLD-Other | 8/10/2017 | 8/10/2017 | 8/10/2017 | P | PASS |
Brandon Shaw
|
|
|
Llinen shoot fire proofing, OK
|
CHANGE STATUS TO (ISS) | | | 7/21/2017 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 2/13/2017 | 2/13/2017 | 3/29/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - MECHANICAL | 3/28/2017 | | 3/29/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 3/28/2017 | | 3/29/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
10th floor confrence room change
|
Permit Ready to Issue | | | 3/29/2017 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Routing - PLAN CHECK | 2/15/2017 | | 3/13/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Plan mod for confrence room on 10th floor change
|
Routing - Design Review | 2/15/2017 | | 2/23/2017 | | PASS |
Sarah Schafer
|
|
|
Approved per the Modification.
|
Routing - PLUMBING | 2/15/2017 | | 2/17/2017 | | PASS |
Bill VanDegrift
|
|
|
added conference roon on the 10th floor, ok
|
Routing - FIRE | 2/15/2017 | 2/15/2017 | 2/16/2017 | | PASS |
Katie Marron
|
|
|
Revised report attached to case
|
Routing - MECHANICAL | 2/15/2017 | | 2/16/2017 | | FAIL |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 2/15/2017 | | 2/15/2017 | | PASS |
Rachael Beierle
|
|
|
CREDITS AVAILABLE.
|
Routing PW Drainage | 2/15/2017 | | 2/15/2017 | | PASS |
Brian Murphy
|
|
|
|
Plan Modification Accepted | | | 2/13/2017 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/9/2017 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 12/12/2016 | 12/12/2016 | 2/1/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Design Review | 1/24/2017 | | 2/1/2017 | | PASS |
Sarah Schafer
|
|
|
|
Routing - PLAN CHECK | 1/24/2017 | | 2/1/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
RFI SLAB FIX AND DOOR TO ALLEY OFF ELECTRICAL ROOM ONLY
|
Routing Off Site - STRUCTURAL | 1/24/2017 | | 2/1/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
RFI206 SLAB FIX
|
Permit Ready to Issue | | | 2/1/2017 | | DONE |
|
|
|
PLEASE DO NOT RE ISSUE
|
Routing Off Site - STRUCTURAL | 1/3/2017 | | 1/17/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 1/3/2017 | | 1/17/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLUMBING | 1/3/2017 | | 1/9/2017 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - MECHANICAL | 1/3/2017 | | 1/3/2017 | | PASS |
Troy James
|
|
|
|
BLD-Framing/Rough-in | 12/12/2016 | 12/13/2016 | 12/13/2016 | A | PASS |
Dave Hannah
|
|
|
level 4 roof framing - James Phone #: ###-####
|
Routing - PLAN CHECK | 12/13/2016 | | 12/13/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Jonathan,
I just received a plan modification for slab edge corrections. I am unable to accept this plan modification with the documents that you submitted. Please submit revised drawings with the engineers stamp and supporting stamped calculations. Also there are 2 mechanical drawings that were uploaded, see below for example. All drawings for permits shall be stamped by the design professional of record. Also there is no explanation for the mechanical drawings.
The plan modification application is incomplete, there is no attached list for drawings that have changed.
|
Plan Modification Accepted | | | 12/12/2016 | | DONE |
Christina Prado
|
|
|
Plan Mod requested for updates to mech room 125 and structural slab heaving fix
|
Plan assigned to (AJS) | 9/22/2016 | 9/22/2016 | 12/2/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Plan modification Marriott
|
Routing - PLAN CHECK | 12/2/2016 | | 12/2/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
rfe 0131 only
|
Permit Ready to Issue | | | 12/2/2016 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Routing - MECHANICAL | 11/29/2016 | | 12/1/2016 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 11/21/2016 | | 11/22/2016 | | FAIL |
Troy James
|
|
|
|
Print Statement | | | 11/21/2016 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 11/21/2016 | | 11/21/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
structural upgrade of the 10th floor slab at the NW corner to accomodate potential of added loading.
|
Print Statement | | | 11/18/2016 | | DONE |
|
|
|
|
Routing - MECHANICAL | 10/21/2016 | | 10/24/2016 | | FAIL |
Troy James
|
|
|
Provide revised duct design for relocating RTU-1 from grid line 1 to gride line 5.
|
Routing - MECHANICAL | 9/23/2016 | | 10/3/2016 | | FAIL |
Troy James
|
|
|
|
Routing - Design Review | 9/30/2016 | | 9/30/2016 | | PASS |
Sarah Schafer
|
|
|
signed off on CCD15 and CCD15.1 in e plan
|
Routing - PLAN CHECK | 9/23/2016 | | 9/30/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
CCD15 AND CCD15.1 CHANGES ONLY
|
Plan Modification Accepted | | | 9/22/2016 | | DONE |
Christina Prado
|
|
|
Chnage to VTAC
|
Telephone call | | | 9/15/2016 | | DONE |
|
|
|
had a message from Dave about fees due- called back- left a message of amount due and how to go online and pay those fees- KRS
|
Plan assigned to (AJS) | 8/24/2016 | 8/24/2016 | 9/8/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Marriott, out at structural for review
|
Routing Off Site - STRUCTURAL | 9/8/2016 | | 9/8/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Permit Ready to Issue | | | 9/8/2016 | | DONE |
|
|
|
DO NOT ISSUE PLAN MOD
|
BLD-Concrete | | | 8/29/2016 | P | PART |
Mike Jordan
|
|
|
|
Routing Off Site - STRUCTURAL | 8/26/2016 | | 8/26/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
plan modification failed structural review
|
Plan assigned to (TLW) | 7/21/2016 | | 8/24/2016 | | DEFR |
Tim L. Woodard
|
|
|
|
BLD-Conference | | | 8/19/2016 | P | DEFR |
Mike Jordan
|
|
|
|
BLD-Concrete | | | 8/16/2016 | P | DEFR |
Mike Jordan
|
|
|
|
BLD-Concrete | | | 8/9/2016 | P | PEND |
Dave Hannah
|
|
|
|
BLD-Concrete | | | 8/5/2016 | P | PEND |
Dave Hannah
|
|
|
|
BLD-Concrete | | | 7/28/2016 | P | PEND |
Dave Hannah
|
|
|
|
Plan Modification Accepted | | | 7/21/2016 | | DONE |
Christina Prado
|
|
|
Plan mod requested for structural changes to parking slab
|
BLD-Concrete | 7/13/2016 | 7/13/2016 | 7/14/2016 | P | PEND |
Dave Hannah
|
|
|
Level 4 south PT deck reinforcement. Structural Engineer has been onsite and has reviewed. SI has been on site and is scheduled for the pour. Concrete pour scheduled for 9:30 pm tonight. Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Concrete | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | PEND |
Dave Hannah
|
|
|
Walls at elevator core level 3-4, misc. columns. concrete scheduled for 10 am Saturday. MTI has been on site for periodic special inspections and is also scheduled. Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Foundation | 6/14/2016 | 6/14/2016 | 6/27/2016 | A | PASS |
Dave Hannah
|
|
|
Foundation wall stair core 2 level 2-3. MTI has been onsite for progress inspections and is scheduled. Concrete scheduled for 10 am tomorrow.
PT deck level 3 pour 1 is ready. Concrete scheduled for Wednesday 9 pm Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Concrete | 6/24/2016 | 6/24/2016 | 6/24/2016 | A | PART |
Mike Jordan
|
|
|
PT suspended slab Pour #2 level 3. SI has been doing periodic inspections all week. SI will be onsite today and for pour. Concrete scheduled for 10 pm tonight. Phone #: ###-#### Inspection requested via web by Jim Williams. Work in progress. ok after special inspection has signed off.
|
BLD-Conference | 6/1/2016 | 6/2/2016 | 6/14/2016 | A | PEND |
Dave Hannah
|
|
|
stair core 3 level 2.Concrete scheduled for 3pm. SI scheduled and will be onsite. Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Foundation | 5/12/2016 | 5/12/2016 | 5/12/2016 | A | PASS |
Dave Hannah
|
|
|
pool wall level 2. PT suspended slab level 2 pour 3. Concrete scheduled for 2 am 5/13 for PT deck. Friday afternoon 2 pm. Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Concrete | 4/28/2016 | 4/28/2016 | 5/5/2016 | P | PART |
Dave Hannah
|
|
|
PT suspended concrete slab level 2 pour 2. Concrete scheduled for 2 am 4/29. Elevator core wall reinforcement. 100''- 116'' elevation. MTI has been on site and conducted inspected. SS is scheduled to be on site for pours. Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Foundation | 5/3/2016 | 5/3/2016 | 5/4/2016 | P | PEND |
Dave Hannah
|
|
|
Stair core 1 from elevation 116'' to 127'' rebar, Concrete scheduled for 5/4 2pm. Would like to begin buttoning up forms this afternoon Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Concrete | 4/12/2016 | 4/12/2016 | 4/14/2016 | P | PEND |
Dave Hannah
|
|
|
Suspended PT level 2 deck Grid lines A-H 6.5-10 pour 1 of three. Structural engineer and MTI have been onsite and reviewed. Concrete scheduled for 3 am tomorrow.
FR 16x20 footing Grids 1-H Concrete schedules 4 pm today Phone #: ###-#### Inspection requested via web by Jim Williams
|
Plan assigned to (TLW) | 3/11/2016 | | 4/7/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 4/7/2016 | | 4/7/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Permit Ready to Issue | | | 4/7/2016 | | DONE |
|
|
|
Plan Mod approved, all requirements met and no fees due
|
CHANGE STATUS TO (ISS) | | | 4/7/2016 | | DONE |
|
|
|
Plan Mod approved, all requirements met and no fees due
|
Routing - PLUMBING | 3/22/2016 | | 3/22/2016 | | PASS |
Bill VanDegrift
|
|
|
Provide protection in acordance with the building code for PEX and PVC
|
BLD-Footing | 3/9/2016 | 3/10/2016 | 3/11/2016 | A | PEND |
Dave Hannah
|
|
|
FS footing grid line C 1.9 and 3, Columns grid C-4 , D.5-5 and B-6 Phone #: ###-#### Inspection requested via web by Jim Williams
|
Plan Modification Accepted | | | 3/11/2016 | | DONE |
Christina Prado
|
|
|
Plan Modification requested by arch firm - to change approved cast iron drain pipe to PVC Drain Pipe, add Pex supply lines where permitted by code, add additional smoke control fans to public areas and guest room corridors
|
BLD-Foundation | 3/7/2016 | 3/7/2016 | 3/10/2016 | P | PASS |
Dave Hannah
|
|
|
Stair 3 core walls , 4 columns grids H-7,C.5 6-7,C-5 2 pm concrete. SI has already reviewed rebar and will be on site. Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Foundation | 2/29/2016 | 3/1/2016 | 3/2/2016 | A | PASS |
Dave Hannah
|
|
|
Perimeter foundation XY grid SW. Concrete pier Grid 5;6 at grid A. Concrete columns grid C.5 6.3-7. and grid H -7.Concrete scheduled for 2 pm SI has been scheduled and already inspected column reinforcement prior to form placement Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Footing | 2/18/2016 | 2/18/2016 | 2/19/2016 | A | PEND |
Dave Hannah
|
|
|
Footings Grid line A-1-3.5: Grid line 1 A-C. Concrete scheduled for 11:00 am. SI scheduled and will be onsite for pour. Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Foundation | 2/15/2016 | 2/16/2016 | 2/18/2016 | P | PEND |
Dave Hannah
|
|
|
Foundation reinforcement stair 1 grid line F 9-10, Column reinforcement grid lines 6-8 A-H Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Conference | 2/10/2016 | 2/11/2016 | 2/11/2016 | A | DEFR |
Mike Jordan
|
|
|
FS footings and continuous exterior footings Grid line A 4-6.5; Exterior continuous footings. Grid line H 4-6.5 Concrete scheduled 8am SI has already reviewed rebar and is scheduled onsite for tomorrows pour. Phone #: ###-#### Inspection requested via web by Jim Williams. Special inspection has approved. Concrete placement in progress. Special inspector on site.
|
BLD-Foundation | 2/4/2016 | 2/4/2016 | 2/4/2016 | P | PEND |
Dave Hannah
|
|
|
Grid line A 7-10, Grid line H 7-10, Tower crane base foundation. 10 am Friday concrete scheduled. Phone #: ###-#### Inspection requested via web by Jim Williams ok after s/i sign off
|
BLD-Foundation | 1/29/2016 | 1/29/2016 | 2/1/2016 | A | PASS |
Dave Hannah
|
|
|
3'' Foundation wall Grid line 10- B.8-H; Grid line H 8.8-10. Concrete scheduled for 2 pm. Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Footing | 1/27/2016 | 1/28/2016 | 1/28/2016 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Jim Williams Inspection of Select large footing pads for columns.........OK pending MTI special inspections, tests and approvals.
|
Issue PAID IN FULL permit | | | 12/9/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/9/2015 | | DONE |
|
|
|
|
Routing - FIRE | 12/4/2015 | 12/4/2015 | 12/8/2015 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/8/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/8/2015 | | DONE |
Christina Prado
|
|
|
need ACHD, GC & Rev Cert of val
All requirements met as of 12/9/2015///cdp
|
Plan assigned to (TLW) | 9/29/2015 | | 12/8/2015 | | PASS |
Tim L. Woodard
|
|
|
Oct 27 is 20 days. TLW
|
Routing - PLUMBING | 12/4/2015 | | 12/8/2015 | | PASS |
Daryl Spivey
|
|
|
per plans and ISPC
|
Plan resubmittals received | | | 12/4/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/4/2015 | | 12/4/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 11/9/2015 | | 12/2/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 11/9/2015 | | 12/2/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - MECHANICAL | 11/9/2015 | | 11/18/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 11/9/2015 | | 11/13/2015 | | FAIL |
Daryl Spivey
|
|
|
you added this detail reference, 8/M2.1. on page P2.6 detail not shown as submitted, submit m2.1 showing HX-1 being double wall with leak detection.
|
Route to Impact Fee Review | 11/9/2015 | 11/12/2015 | 11/12/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Street Lights | 11/9/2015 | | 11/10/2015 | | PASS |
Mike D Hedge
|
|
|
|
Routing - FIRE | 11/9/2015 | 11/9/2015 | 11/9/2015 | | FAIL |
Katie Marron
|
|
|
Not all comments were addressed. Revised report attached to case and emailed to architect.
|
Plan resubmittals received | | | 11/6/2015 | | |
|
|
|
|
1st review completed | | | 10/29/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing PW Environmental | 9/29/2015 | | 10/26/2015 | | PASS |
Rick Christenson
|
|
|
|
Routing - PLAN CHECK | 9/29/2015 | | 10/25/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Solid Waste | 9/29/2015 | | 10/23/2015 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - PLUMBING | 9/29/2015 | | 10/12/2015 | | FAIL |
Daryl Spivey
|
|
|
1) waste connections to stacks with suds producing fixtures must be 8 feet vertical or harizontal from horizontal offset.
2) riser diagrams 1,2,11,14,15,20 and 21 are overloaded at the horizontal offset.
3) provide information on HX-1 showing double wall with leak detection.
4) vent waste branches on combination waste and vent system over 15 feet.
5)verify interceptor designs with public works pretreatment.
|
Routing - FIRE | 9/29/2015 | 9/29/2015 | 10/8/2015 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing Off Site - STRUCTURAL | 9/29/2015 | | 10/8/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - MECHANICAL | 9/29/2015 | | 10/8/2015 | | FAIL |
Troy James
|
|
|
|
Routing - Addressing | 9/29/2015 | | 10/5/2015 | | PASS |
Emily Dixon
|
|
|
Address changed to 400 S Capitol Blvd.
|
Routing - Design Review | 9/29/2015 | | 10/1/2015 | | PASS |
Sarah Schafer
|
|
|
Approved in E-Plan. TLW
|
Routing PW Street Lights | 9/29/2015 | | 10/1/2015 | | FAIL |
Mike D Hedge
|
|
|
Additional info required, see markups in e plan.
|
Routing PW Sewer Design | 9/29/2015 | | 10/1/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Drainage | 9/29/2015 | | 9/30/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING Land Div | 9/29/2015 | | 9/30/2015 | | PASS |
Dave Abo
|
|
|
ROS 10211
|
Routing PW Sewer Rating | 9/29/2015 | | 9/30/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Geothermal | 9/29/2015 | | 9/29/2015 | | PASS |
Jon R. Gunnerson
|
|
|
coordinate geothermal connection with Public Works, Jon Gunnerson ###-####
|
Routing - PUBLIC WORKS | 9/29/2015 | | 9/29/2015 | | PASS |
Beverly Mountain
|
|
|
|
Pending Assignment by TLW | 9/29/2015 | | 9/29/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 9/28/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please see mark ups on check list for items needing addressed for pre screen.
|
Intake Approval | | | 9/28/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Application received | | | 9/25/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 25 2015 7:57AM
|