BLD-Aging Inspection | 8/30/2017 | 8/30/2017 | 8/31/2017 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/31/2017 | 8/31/2017 | 8/31/2017 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 8/31/2017 | 8/31/2017 | 8/31/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 4/17/2017 | 4/18/2017 | 4/18/2017 | A | PASS |
Brandon Shaw
|
|
|
James Phone #: ###-####. Open plumbing permit finaled.
|
BLD-Final | 4/12/2017 | 4/13/2017 | 4/13/2017 | P | PART |
Brandon Shaw
|
|
|
James-please call 30 minutes prior to meet for access Phone #: ###-#### Clear open plumbing permit, final to be okay'd then.
|
BLD-Aging Inspection | 2/16/2017 | 2/16/2017 | 2/22/2017 | | CANC |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/15/2017 | 2/15/2017 | 2/22/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 10/3/2016 | 10/3/2016 | 10/4/2016 | P | PASS |
Dave Hannah
|
|
|
Jack Phone #: ###-####
|
BLD-Foundation | 8/9/2016 | 8/9/2016 | 8/9/2016 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Footing | 7/27/2016 | 7/27/2016 | 7/27/2016 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Footing | 7/25/2016 | 7/26/2016 | 7/26/2016 | A | FAIL |
Mike Jordan
|
|
|
Jason Phone #: ###-####. North footing not the rquired 1ft in depth. Missing the 4 #5 rebar in east footing, also needs to raise reinforcement in footings to obtain the minimum 3 inch clearance from the ground.
|
PubWorks Subgrade Approval | 7/25/2016 | 7/25/2016 | 7/25/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 7/18/2016 | 7/20/2016 | 7/20/2016 | A | FAIL |
Phil Shearer
|
|
|
Change day and time per Jason.... Jason Phone #: ###-####. Need sub grade inspection
|
Issue PAID IN FULL permit | | | 10/13/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 10/8/2015 | | |
|
|
|
|
Plan resubmittals received | | | 10/8/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/8/2015 | | 10/8/2015 | | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 10/8/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2015 | | DONE |
|
|
|
|
Telephone call | | | 10/8/2015 | | DONE |
|
|
|
called Robyn to let know permit is ready and how much is owed-left message on her phone
|
Permit Ready to Issue | | | 10/8/2015 | | DONE |
|
|
|
requirements met
|
Plan assigned to (LEG) Tisha | 9/25/2015 | | 10/8/2015 | | DONE |
Tisha Gallop
|
|
|
walk in 1st review 9/30, 2nd review 10/6; need wui
|
Plan resubmittals received | | | 10/6/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/6/2015 | | 10/6/2015 | | FAIL |
Tisha Gallop
|
|
|
does not meet wui zone A requirements
|
1st review completed | | | 9/30/2015 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 9/25/2015 | | 9/30/2015 | | FAIL |
Tisha Gallop
|
|
|
|
Routing Walk-In (Zoning) | 9/25/2015 | 9/25/2015 | 9/25/2015 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 9/25/2015 | 9/25/2015 | 9/25/2015 | P | CANC |
Tisha Gallop
|
|
|
level 2
|
Routing Walk-In (PW Hillside) | 9/25/2015 | 9/25/2015 | 9/25/2015 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing - Erosion and Sediment | 9/25/2015 | | 9/25/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
New detached garage..A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection.
|
Application received | | 9/25/2015 | | | |
|
|
|
|