Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD15-03500
StatusFinaled
Name AEI
Site Address 1533 N WILDWOOD WAY
Project NameCattle Kate
Customer Number15-04511, 04512
ePlanReviewYes
Description
(CATTLE KATE CORE AND SHELL)MODIFICATIONS TO THE FACADE OF THE BUILDING DECREASING THE HEIGHT OF THE EXTERIOR WALLS (OK FOR FOUNDATIONS SEE THE ATTACHED ENGINEERS LETTER) THE ROOFING SYSTEM IS ALSO BEING CHANGES TO A 2:12 SLOPE AND A TPO ROOFING MATERIAL. Permit for a new 4,915 sq. ft. retail building with work to include a concrete foundation with a slab on grade floor and a type VB wood framed structure above. with work to include general site work grading and utilites. All work per the approved plans. This building is not fire sprinklered. CDM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/16/20172/13/2017 DONE
DetailsChristina Prado
Called and spoke to Dan - FInal value for TI is combined with Shell & Core. Final certificate for both permits attached and values verified
Third Notice 12/17/20161/11/2017 DONE
Third Notice 11/22/201612/12/2016 DONE
sent with a letter
Third Notice 10/15/201611/17/2016 DONE
Third Notice 9/24/201610/10/2016 DONE
Second Notice 8/22/20169/19/2016 DONE
First Notice8/8/20168/8/20168/12/2016 DONE
DetailsCarlos Velazquez
mailed 8-22-16
BLD-Final8/8/20168/8/20168/8/2016PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Antonio Carone
DOC - Permit Finaled8/8/20168/8/20168/8/2016PPASS
DetailsMike Jordan
PubWorks Occupancy Approval8/5/20168/5/20168/5/2016 DONE
DetailsTiffany Lowery
Zoning Approval8/3/20168/3/20168/3/2016 PASS
DetailsSarah Schafer
Bench chained to the bike rack MUST be moved. 2 bicycle parking spaces are not provided with the bench chained to the rack.
BLD-Conference6/8/20166/8/20166/8/2016PPART
DetailsMike Jordan
All other inspections have been performed. Owner posted landscape bond as per zoning temporary sign off requirements. Phone #: ###-#### Inspection requested via web by Antonio Carone. Ok for temp. occ. Will be ok for perm occ. once zoning and public works signs perm.
PubWorks Temp Occupancy Appr6/8/20166/8/20166/8/2016 DONE
DetailsTiffany Lowery
Zoning Approval Temp6/8/20166/8/20166/8/2016 PASS
DetailsJosh Wilson
180 day ok- landscape bond in place
BLD-Final6/6/20166/6/20166/7/2016PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Antonio Carone
FIRE-Final Inspection6/6/20166/6/20166/6/2016PPASS
DetailsTroy Cobbley
Life safety passed. Contractor to provide address numbers facing the street, as discussed, prior to a building inspection.
Plan assigned to (CDM)5/24/20165/24/20166/3/2016 DONE
DetailsCarl D Madsen
Plan mod should have been under BLD15-04511
Routing - PLAN CHECK5/24/2016 6/3/2016 PASS
DetailsCarl D Madsen
Plan mod should have been under BLD15-04511
Routing PW Solid Waste5/24/2016 6/3/2016 PASS
DetailsPeter J. McCullough
Need more information on modification prior to passing PW. NO CHANGE IN MOD FROM WHEN PASSED BY MD
PLANS/APPL TAKEN TO FRONT DESK  6/3/2016 DONE
DetailsChristina Prado
Plan mod should have been under BLD15-04511
CHANGE STATUS TO (ISS)  6/3/2016 DONE
DetailsChristina Prado
Plan mod should have been under BLD15-04511
Routing - PUBLIC WORKS5/24/2016 5/26/2016 PASS
DetailsRachael Beierle
NO CHANGE IN SOLID WASTE. PASS VIA PW
Routing PW Sewer Rating5/24/2016 5/24/2016 PASS
DetailsRachael Beierle
Plan Modification Accepted  5/24/2016 DONE
DetailsChristina Prado
For minor revisions as per Tom WIlliams
BLD-Conference4/29/20164/29/20164/29/2016APASS
DetailsMike Jordan
I will not be onsite this morning. I have dry wallers waiting to hang. Please send me a text or voice mail with the status. Thank you Phone #: ###-#### Inspection requested via web by Antonio Carone
BLD-Final4/26/20164/26/20164/26/2016PCANC
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Antonio Carone
BLD-Framing/Rough-in4/26/20164/26/20164/26/2016PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Antonio Carone
BLD-Wall Bracing3/31/20163/31/20163/31/2016PPASS
DetailsMike Jordan
Sheer inspection Phone #: ###-#### Inspection requested via web by Antonio Carone
BLD-Framing/Rough-in3/24/20163/25/20163/25/2016APASS
DetailsMike Jordan
Roof nail inspection request for approval to cover. Phone #: ###-#### Inspection requested via web by Antonio Carone
CHANGE STATUS TO (ISS)  2/18/2016 DONE
DetailsChristina Prado
OVERRIDE  2/16/2016  
Plan assigned to (CDM)1/28/20161/28/20162/16/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  2/16/2016 DONE
Permit Ready to Issue  2/16/2016 DONE
DetailsChristina Prado
Plam Mod approved - All requirements met for Plan Mod

DO NOT RE-ISSUE - Must pay all remaining fees prior to changing status to ISS
Routing - PLANNING2/10/2016 2/12/2016 PASS
DetailsJosh Wilson
Routing - PLAN CHECK2/10/2016 2/10/2016 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK1/28/2016 2/2/2016 FAIL
DetailsCarl D Madsen
BLD-Footing1/27/20161/28/20161/28/2016PPASS
DetailsJim Sly
Have concrete scheduled for 1:00pm. We would like to be as close to 12:00pm as possible with the inspection for footings. Phone #: ###-#### Inspection requested via web by Antonio Carone

No special insp req. besides soil. Footing OK.
Plan Modification Accepted  1/28/2016 DONE
modifications to include; landscape plan, roof layout, elevations
BLD-Conference1/27/20161/27/20161/27/2016ADEFR
DetailsMike Jordan
Per structural engineer for the project David Sansotta, no special inspections required for the 1500 psf minimum bearing pressures soil however he requested that the city inspector verify the conditions are acceptable. Footings are excavated and the soil appears to meet or exceed the allowable requirements. Request a conference to confer with inspector. Call Antonio Carone with questions. Phone #: ###-#### Inspection requested via web by Antonio Carone. No geo-tech report for project. Project site has had 2ft. to 3ft. of uncontrolled fill from previous construction to the south. Also noted construction debries within the building pad site and excavated footings. Noted to contractor that a sub grade inspection would be required by a geo-tech engineer.
Issue PAID IN FULL permit  1/22/2016 DONE
Inspection Record Card- Bld  1/22/2016 DONE
OVERRIDE  1/7/2016  
Permit Ready to Issue  1/7/2016 DONE
DetailsChristina Prado
***req met Candy has scans***Need RP, GC form & Revised certificate of value for issuance

DO NOT ISSUE WITHOUT BLD15-034511 & BLD15-04512
Plan assigned to (CDM)10/13/201510/13/20151/6/2016 PASS
DetailsCarl D Madsen
New Commercial - ePlanReview - Cattle Kate First and second reviews completed
Routing - PLAN CHECK12/21/2015 1/6/2016 PASS
DetailsCarl D Madsen
Failed pending Solid waste approval
Routing PW Solid Waste1/6/2016 1/6/2016 PASS
DetailsMegan Durrell
Site is limited to trash/recycle carts (max 4 trash carts). No dumpster allowed from this enclosure location.
PLANS/APPL TAKEN TO FRONT DESK  1/6/2016 DONE
Routing PW Solid Waste12/22/2015 12/24/2015 FAIL
DetailsMegan Durrell
Trash enclosure does not meet requirements (notified 3x). Service is not possible from proposed location. Must have 50 feet backing distance. http://curbit.cityofboise.org/media/2299/CommercialEnclosureRequirements.pdf
Routing - Design Review12/22/2015 12/22/2015 PASS
DetailsJosh Wilson
Routing - PUBLIC WORKS10/13/2015 12/22/2015 PASS
DetailsRachael Beierle
Route to Impact Fee Review11/18/201511/21/201511/19/2015 PASS
DetailsCindy M. Gould
Routing Off Site - STRUCTURAL10/13/2015 11/18/2015 FAIL
DetailsCarl D Madsen
Routing - PLAN CHECK10/13/2015 11/18/2015 FAIL
DetailsCarl D Madsen
1st review completed  11/18/2015 FAIL
Routing PW Solid Waste10/13/2015 10/29/2015 FAIL
DetailsPeter J. McCullough
Trash enclosure does not meet requirements - access to the dumpster is restricted and backing distance does not meet 50' requirement. Enclosure should be 12'x12' interior dimensions and gates must swing open 120-degrees.
Routing PW Drainage10/13/2015 10/22/2015 PASS
DetailsBrian Murphy
Routing - PLUMBING10/13/2015 10/19/2015 PASS
DetailsBill VanDegrift
Routing - FIRE10/13/201510/13/201510/13/2015 PASS
DetailsScott Arellano
Comments attached to case.
Routing - Addressing10/13/2015 10/13/2015 PASS
DetailsEmily Dixon
Routing - Erosion and Sediment10/13/2015 10/13/2015 PASS
DetailsEvan Jenkins
(CATTLE KATE) The project owner / tenant of approximately half of the building, Cattle Kate is a business that
custom creates and manufactures late 1800’s period western wear clothing as well as accessories sales.
Routing PW Sewer Rating10/13/2015 10/13/2015 PASS
DetailsRachael Beierle
Routing PW Sewer Design10/13/2015 10/13/2015 PASS
DetailsKyle S. Rosenmeyer
Routing - PLANNING Land Div10/13/2015 10/13/2015 PASS
DetailsDave Abo
Lot 5, Block 1 of Keeneland Park Subdivision.
Routing - Design Review10/13/2015 10/13/2015 PASS
DetailsJosh Wilson
Ok per DRH15-00348
Pending Assignment by JCB10/13/2015 10/13/2015 DONE
DetailsJason Blais
First review completed
Intake Approval  10/12/2015 PASS
DetailsJason Blais
Prescreen approved by Javier Guzman and plan review fees paid.
Intake Approval  10/9/2015 FAIL
DetailsJavier Guzman
Please provide the following: (Incomplete submittals will not be accepted)
• Form #304 – Registered Design Professional have owner sign document
• Form #310 – Statement of Special Inspections fill out all information on form completely and have owner sign document
Application received  9/25/2015 DONE
Application submitted via PDS Online on Sep 25 2015 1:59PM
Routing Off Site - STRUCTURAL12/21/2015