BLD-Final | 1/27/2016 | 1/28/2016 | 1/28/2016 | P | PASS |
Phil Shearer
|
|
|
Todd Phone #: ###-####
|
DOC - Permit Finaled | 1/28/2016 | 1/28/2016 | 1/28/2016 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 1/26/2016 | 1/27/2016 | 1/27/2016 | P | NR |
Jim Storey
|
|
|
Todd Phone #: ###-#### ele failled
|
BLD-Framing/Rough-in | 11/30/2015 | 12/1/2015 | 12/1/2015 | A | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-#### deck
|
BLD-Framing/Rough-in | 11/4/2015 | 11/4/2015 | 11/4/2015 | P | PASS |
Phil Shearer
|
|
|
Interior framing only - Todd Phone #: ###-####
|
BLD-Footing | 10/28/2015 | 10/29/2015 | 10/30/2015 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
PubWorks Subgrade Approval | 10/28/2015 | 10/28/2015 | 10/28/2015 | | DONE |
Jason C. Taylor
|
|
|
**DECK FOOTINGS ONLY**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 9/30/2015 | | |
|
|
|
|
Telephone call | | | 9/30/2015 | | DONE |
|
|
|
called Todd to let know permit is ready and how much is owed-he will need to sign permit app-then please scan
|
Issue PAID IN FULL permit | | | 9/30/2015 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 9/28/2015 | | 9/30/2015 | | DONE |
Tisha Gallop
|
|
|
walk in 9/28; hillside deck, routed to esc
|
Routing - PLAN CHECK | 9/29/2015 | | 9/30/2015 | | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 9/30/2015 | | DONE |
|
|
|
|
1st review completed | | | 9/30/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/30/2015 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/28/2015 | | 9/29/2015 | | PASS |
Evan Jenkins
|
|
|
Permit for interior remodel and new elevated deck at the rear of an existing single family dwelling. Scope of work includes enlargment of master bathroom which includes moving interior garage door to previous bedroom which will be converted to new laundry room. Raise interior ceiling at interior entry, removal of bearing wall between kitchen and dining room per engineering. New exterior deck 416 sq ft. deck.
|
Routing Walk-In (Zoning) | 9/28/2015 | 9/28/2015 | 9/28/2015 | A | DONE |
Colleen T Carroll
|
|
|
|
Routing Walk-In (PW Hillside) | 9/28/2015 | 9/28/2015 | 9/28/2015 | A | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (BLD) | 9/28/2015 | 9/28/2015 | 9/28/2015 | A | CANC |
Tisha Gallop
|
|
|
level 2
|
Application received | | 9/28/2015 | | | |
|
|
|
|