DOC - Permit Finaled | | | 9/19/2017 | | DONE |
|
|
|
|
BLD-Final | 8/17/2017 | 8/17/2017 | 8/22/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/1/2017 | 2/1/2017 | 2/1/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 1/31/2017 | 1/31/2017 | 2/1/2017 | | PEND |
Dave Hannah
|
|
|
|
FIRE-Sprinkler Rough-in | 9/16/2016 | 9/19/2016 | 9/19/2016 | A | DONE |
Jim Page
|
|
|
Insepection request was for a fire conference, discussed items with Mike from ESI, phone number ###-####. Mike is going to contact the responding fire station for prefered location of knox box. Verified fire extinguisher location for individual floors, some slight modiciations will be made for fire extinguisher placement.
|
BLD-Concrete | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | DONE |
Dave Hannah
|
|
|
Myrtle Tower Podium Rebar and PT Cable inspection. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Conference | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
Issue PAID IN FULL permit | | | 11/17/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 11/9/2015 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 11/3/2015 | | 11/9/2015 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/9/2015 | | DONE |
|
|
|
Need ACHD, GC FORM, REVISED VALUE AND RP
|
Plan assigned to (TLW) | 10/5/2015 | | 11/9/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 11/3/2015 | | 11/9/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Route to Impact Fee Review | 11/3/2015 | 11/6/2015 | 11/4/2015 | | PASS |
Cindy M. Gould
|
|
|
this is not the shell and core permit.
|
Routing - Addressing | 11/3/2015 | | 11/4/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - Design Review | 10/5/2015 | | 11/3/2015 | | PASS |
Sarah Schafer
|
|
|
Approved in E-Plan. TLW
|
Plan resubmittals received | | | 11/3/2015 | | DONE |
|
|
|
|
1st review completed | | | 10/28/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/5/2015 | | 10/28/2015 | | PASS |
Tim L. Woodard
|
|
|
Approved.
|
Routing PW Solid Waste | 10/5/2015 | | 10/28/2015 | | PASS |
Megan Durrell
|
|
|
Approved in E-Plan Review. TLW
|
Routing Off Site - STRUCTURAL | 10/5/2015 | | 10/28/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Environmental | 10/5/2015 | | 10/26/2015 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Sewer Design | 10/22/2015 | | 10/22/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - FIRE | 10/5/2015 | 10/5/2015 | 10/12/2015 | | PASS |
Scott Arellano
|
|
|
Attached plan review report to case.
|
Routing PW Sewer Design | 10/5/2015 | | 10/12/2015 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Indicate size of sewer service (typical). Add utility note to contact Boise Public Works 48 hours prior to sewer connection to obtain tap permit and schedule inspection.
|
Routing - PLUMBING | 10/5/2015 | | 10/12/2015 | | PASS |
Daryl Spivey
|
|
|
utilities only ok
|
Routing PW Drainage | 10/5/2015 | | 10/9/2015 | | PASS |
Brian Murphy
|
|
|
PWK WILL BE BLD
|
Routing PW Street Lights | 10/5/2015 | | 10/6/2015 | | PASS |
Mike D Hedge
|
|
|
Street lighting to be submitted with main building permit.
|
Routing - Erosion and Sediment | 10/5/2015 | | 10/6/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(INN AT 500 - **Foundation and Podium Permit Only**)A new two story concrete podium for a future six story 90,000 s.f. boutique hotel with associated civil grading, utilities and site landscaping and street improvements.
|
Intake Approval | | | 10/5/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 10/5/2015 | | 10/5/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLANNING Land Div | 10/5/2015 | | 10/5/2015 | | PASS |
Dave Abo
|
|
|
|
Routing - Addressing | 10/5/2015 | | 10/5/2015 | | FAIL |
Emily Dixon
|
|
|
Parcel consolidation required.
|
Routing - PUBLIC WORKS | 10/5/2015 | | 10/5/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Application received | | | 9/28/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 28 2015 3:00PM
|