Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD15-03564
StatusFinaled
Name THE SUNDANCE COMPANY
Site Address 7417 W MOSSY CUP ST
Project NameSpencer Fluid Power T.I.
Customer Number 
ePlanReviewYes
Description
**SPENCER FLUID POWER** Permit for tenant improvements to an existing 8,972 sq. ft. tenant space with a 1,450 sq. ft. mezzanine to reflect previous work to expand a tenant space that was completed without a permit. Additional work is to be completed under this permit to bring the space into compliance to include alterations to a restroom for ADA compliance, addition of a drinking fountain and a mop sink and the installation of a new overhead door with a integral man door for a required exit per the approved plans. The space is utilized as office, warehouse and minor repair of hydraulic equipment such as pumps and hoses. This is a fully fire sprinklered building for area increase. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 5/13/20185/9/2018 DONE
This permit finaled on the web by Carissa Primmer
BLD-Final5/3/20185/3/20185/3/2018PPASS
DetailsMike Jordan
Sid Phone #: ###-####. ok for perm occ. No card on site to sign.
FIRE-Final Inspection5/3/20185/3/20185/3/2018PPASS
DetailsTroy Cobbley
Life safety passed

Sid Phone #: ###-####
Print Occupancy Form  5/3/2018 DONE
Permanent Occupancy  5/3/2018 DONE
FIRE-Final Inspection4/23/20184/23/20184/23/2018PFAIL
DetailsTroy Cobbley
See the city approved plans for locations where door hardware needs addressed

Please call sid ###-#### Phone #: ###-#### Inspection requested via web by Carissa Primmer
FIRE-Final Inspection4/19/20184/19/20184/19/2018PFAIL
DetailsTroy Cobbley
Follow up status per Jason and Adele.

I spoke by phone to Carissa with Sundance. She stated that now that the racking permit is finaled she will get the drawings and small documents together and schedule final inspections.
Meeting  2/7/2018 DONE
DetailsScott Arellano
Fire Marshal requested follow up on this aging permit. Field inspectors notified and instructed to contact applicant for re-inspection.
FIRE-Final Inspection2/1/20162/1/20162/1/2016PFAIL
DetailsTroy Cobbley
Provide small documents, provide high pile storage/racking permit, provide corrected exterior door hardware as discussed.
Issue PAID IN FULL permit  11/13/2015 DONE
Print Occupancy Form  11/13/2015 DONE
Routing - PLAN CHECK10/19/2015 10/21/2015 PASS
DetailsCarl D Madsen
1st review completed  10/21/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/21/2015 DONE
Permit Ready to Issue  10/21/2015 DONE
DetailsChristina Prado
need GC and Rev Cert of Val

**All requirements met as of 11/12
Routing - FIRE10/19/201510/19/201510/20/2015 PASS
DetailsScott Arellano
Comments attached to case.
Intake Approval  10/14/2015 PASS
Routing - PUBLIC WORKS10/14/2015 10/14/2015 PASS
DetailsRachael Beierle
Routing PW Sewer Rating10/14/2015 10/14/2015 PASS
DetailsRachael Beierle
Intake Approval  10/1/2015 FAIL
DetailsDavid Ferguson
Please obtain a Zoning Certificate from our Planning Department for your exterior door modification(s).

Application received  9/30/2015 DONE
Application submitted via PDS Online on Sep 30 2015 2:27PM