BLD-Final | 10/31/2016 | 10/31/2016 | 10/31/2016 | P | PASS |
Dave Hannah
|
|
|
Clive Phone #: ###-####
|
DOC - Permit Finaled | 10/31/2016 | 10/31/2016 | 10/31/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 10/25/2016 | 10/26/2016 | 10/26/2016 | A | FAIL |
Dave Hannah
|
|
|
Doug Phone #: ###-#### c/n on site
|
PubWorks Occupancy Approval | 10/17/2016 | 10/17/2016 | 10/17/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Aging Inspection | 9/21/2016 | 9/21/2016 | 9/22/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 9/22/2016 | 9/22/2016 | 9/22/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 5/9/2016 | 5/10/2016 | 5/10/2016 | A | PASS |
Dave Hannah
|
|
|
Clive Phone #: ###-####
|
BLD-Wall Bracing | 5/5/2016 | 5/5/2016 | 5/5/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 5/4/2016 | 5/5/2016 | 5/5/2016 | A | PASS |
Dave Hannah
|
|
|
Clive Phone #: ###-####
|
Plan Modification Accepted | | | 4/25/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 4/25/2016 | | 4/25/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 4/15/2016 | 4/18/2016 | 4/18/2016 | P | FAIL |
Jim Storey
|
|
|
Clive Phone #: ###-#### c/n posted
|
BLD-Wall cover | 4/13/2016 | 4/14/2016 | 4/14/2016 | A | NR |
Dave Hannah
|
|
|
Clive Phone #: ###-####
|
BLD-Foundation | 12/2/2015 | 12/3/2015 | 12/3/2015 | A | PASS |
Dave Hannah
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 11/24/2015 | 11/24/2015 | 11/24/2015 | P | PASS |
Dave Hannah
|
|
|
Pat Phone #: ###-####
|
PubWorks Subgrade Approval | 11/24/2015 | 11/24/2015 | 11/24/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 11/10/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/10/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 11/6/2015 | | |
|
|
|
|
Plan assigned to (DAF) | 10/23/2015 | 10/23/2015 | 11/6/2015 | | DONE |
David Ferguson
|
|
|
due 11/5 L2 ePlan / Troy failed mechanical-wait for resubmittal
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/6/2015 | | DONE |
|
|
|
requirements met
|
Routing - MECHANICAL | 10/15/2015 | | 11/6/2015 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 11/3/2015 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 10/15/2015 | | 11/3/2015 | | PASS |
David Ferguson
|
|
|
|
Plan assigned to (LEG) Tisha | 10/15/2015 | | 10/23/2015 | | DEFR |
Tisha Gallop
|
|
|
|
Routing PW Grading-Hillside | 10/15/2015 | | 10/19/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - FIRE | 10/15/2015 | 10/15/2015 | 10/15/2015 | | PASS |
Katie Marron
|
|
|
Reviewed for fire department vehicle access and hydrant availability. Fire Sprinklers and NOT REQUIRED for Nativa Terra Sub 3 Block 4 Lot 10.
|
Routing - PLANNING | 10/15/2015 | | 10/15/2015 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 10/15/2015 | | 10/15/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 10/15/2015 | | 10/15/2015 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 10/15/2015 | | 10/15/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 4470 sq. ft., two story (first story 3036 sq. ft., second story 1488 sq. ft.) single family dwelling with 4 bedrooms, 4 bathrooms and 2 half bathrooms, approximately 944 sq. ft. of covered patio/porch and a 968 sq. ft. attached garage
|
Plans ACCEPTED BY PLAN TECH | | | 10/15/2015 | | DONE |
|
|
|
|
Intake Approval | | | 10/15/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/15/2015 | | DONE |
|
|
|
|
Intake Approval | | | 10/6/2015 | | FAIL |
|
|
|
needs grading and drainage plans
|
Intake Approval | | | 10/6/2015 | | FAIL |
Candy A. Nichols
|
|
|
still need grading and drainage plans uploaded
|
Application received | | | 9/30/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 30 2015 3:08PM
|