BLD-Aging Inspection | 11/18/2016 | 11/18/2016 | 11/18/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Final | 7/6/2016 | 7/6/2016 | 7/7/2016 | P | PASS |
Tony Young
|
|
|
Rod Phone #: ###-####,, shell ok
|
FIRE-Final Inspection | 7/6/2016 | 7/6/2016 | 7/6/2016 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire alarm communicator inspection complete, building is core and shell with no tenants associated with permit so no fire extinguishers required/installed. Final life fire safety inspection passed/complete
|
Extend Permit 90/180 days | 7/6/2016 | 7/6/2016 | 7/6/2016 | P | CANC |
Jim Page
|
|
|
|
BLD-Final | 7/1/2016 | 7/5/2016 | 7/5/2016 | A | NR |
Tony Young
|
|
|
Rod Phone #: ###-####,, need to verify f/l/s
|
PubWorks Occupancy Approval | 7/1/2016 | 7/1/2016 | 7/1/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 6/27/2016 | 6/27/2016 | 6/27/2016 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 6/14/2016 | 6/15/2016 | 6/15/2016 | A | NR |
Jim Sly
|
|
|
Phone #: ###-#### Need FIR 16-0002 and other FIR permit finals. Need Zoning final and possibly Public Works final.
|
BLD-Final | 6/13/2016 | 6/14/2016 | 6/14/2016 | P | NR |
Tony Young
|
|
|
Phone #: ###-####
|
FIRE-Final Inspection | 6/10/2016 | 6/14/2016 | 6/14/2016 | P | FAIL |
Jim Page
|
|
|
Fire sprinkler inspection is complete, emergency egress lighting inspection complete, no fire extinguishers due to shell being unoccupied space until tenant improvements happen. Fire alarm inspection partially complete, in-duct smoke detectors could not be tested in HVAC units due to no power supply connected to HVAC units. The HVAC untis need to have power to be tested for unti shutdown or the genereal contractor needs documentation from the city supporting the HVAC units being disconnected and in-duct detection being INOP. Building fire protection is with a wet pipe fire sprinkler system so interior space needs to be a conditioned space to prevent freezing.
|
BLD-Energy code compliance | 5/2/2016 | 5/3/2016 | 5/4/2016 | P | PART |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Rod Fender
|
BLD-Framing/Rough-in | 4/28/2016 | 4/29/2016 | 4/29/2016 | P | PASS |
Jim Sly
|
|
|
would like call ahead Phone #: ###-####
|
BLD-Energy code compliance | 4/6/2016 | 4/7/2016 | 4/7/2016 | A | PART |
Tony Young
|
|
|
Fire Riser Room walls only. n Phone #: ###-#### Inspection requested via web by steven barth,, exterior wall ok to cover
|
CHANGE STATUS TO (ISS) | | | 4/6/2016 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 3/24/2016 | | |
|
|
|
|
Plan assigned to (TLW) | 3/22/2016 | | 3/24/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 3/24/2016 | | 3/24/2016 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/24/2016 | | DONE |
Christina Prado
|
|
|
DO NOT RE-ISSUE, PLAN MOD APPROVED - NEED REVISED VALUE FROM GC FOR ADDITIONAL VALUE
Must pay all fees prior to changing status to ISS
|
Plan Modification Accepted | | | 3/22/2016 | | DONE |
Christina Prado
|
|
|
requested to add interior non bearing walls
|
BLD-Wall Bracing | 3/16/2016 | 3/16/2016 | 3/16/2016 | P | PASS |
Tony Young
|
|
|
Sheer Framing Pm pls Phone #: ###-#### Inspection requested via web by steven barth,, exterior ok
|
BLD-Foundation | 1/28/2016 | 2/1/2016 | 2/1/2016 | P | PART |
Tony Young
|
|
|
Stem walls steel. Geo Tec to inspect also 1pm ok Phone #: ###-#### Inspection requested via web by steven barth,, ok pending report
|
BLD-Footing | 1/25/2016 | 1/26/2016 | 1/26/2016 | P | PART |
Jim Sly
|
|
|
Third party inspection with geo tech // Ryan Phone #: ###-#### Footing OK pending Geo Tek special inspection, tests and approvals.
|
Inspection Record Card- Bld | | | 1/14/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/14/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 1/7/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 1/7/2016 | | DONE |
Christina Prado
|
|
|
***ALL REQUIREMENTS MET***
Need ACHD, RP , GC form & Revised certificate of value for issuance
|
Routing PW Drainage | 1/6/2016 | | 1/6/2016 | | PASS |
Jason C. Taylor
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/6/2016 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 10/8/2015 | | 1/6/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - Design Review | 1/5/2016 | | 1/5/2016 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 11/30/2015 | | 12/24/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 11/30/2015 | | 12/24/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 11/30/2015 | | 12/9/2015 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks in eplan. JCT
|
Routing - PLUMBING | 11/30/2015 | | 12/2/2015 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
|
Route to Impact Fee Review | 11/30/2015 | 12/3/2015 | 12/1/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Addressing | 11/30/2015 | | 12/1/2015 | | PASS |
Laura Hunter
|
|
|
Changed address from 7546 W State St to 7640 W State St to match building 1
|
Routing - Design Review | 11/30/2015 | | 12/1/2015 | | FAIL |
Andrea Tuning
|
|
|
|
Routing PW Solid Waste | 12/1/2015 | | 12/1/2015 | | PASS |
Megan Durrell
|
|
|
|
Routing PW Environmental | 10/12/2015 | | 11/12/2015 | | PASS |
Rick Christenson
|
|
|
1500 Gallon Exterior Grease Interceptor shown with GW lines.
|
1st review completed | | | 11/12/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/8/2015 | | 11/10/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 10/8/2015 | | 11/10/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Solid Waste | 10/12/2015 | | 10/29/2015 | | FAIL |
Peter J. McCullough
|
|
|
Trash enclosure does not meet guidelines. There is no way to access a dumpster in that enclosure. If no changes are made, this enclosure will be limited to cart service.
|
Routing PW Drainage | 10/12/2015 | | 10/20/2015 | | FAIL |
Jason C. Taylor
|
|
|
See notes in ePlan.
|
Routing PW Sewer Design | 10/12/2015 | | 10/12/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLANNING Land Div | 10/8/2015 | | 10/12/2015 | | PASS |
Dave Abo
|
|
|
|
Routing - PUBLIC WORKS | 10/8/2015 | | 10/12/2015 | | PASS |
Rachael Beierle
|
|
|
|
Routing - FIRE | 10/8/2015 | 10/8/2015 | 10/9/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case
|
Routing - Erosion and Sediment | 10/8/2015 | | 10/9/2015 | | PASS |
Andy J. Long
|
|
|
SWPPP site plan and narrative approved. Valid PD, need to designate RP for ESC permit contact
(NORTH POINTE RETAIL - Building 1) Construction of a single-story, 4,966 SF commercial retail building, within the multi-family apartment complex.
|
Routing - PLUMBING | 10/8/2015 | | 10/9/2015 | | FAIL |
Daryl Spivey
|
|
|
water services on plumbing and civil do not match
|
Routing - Design Review | 10/8/2015 | | 10/9/2015 | | FAIL |
Andrea Tuning
|
|
|
DRH15-00340
|
Intake Approval | | | 10/8/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 10/8/2015 | | 10/8/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Addressing | 10/8/2015 | | 10/8/2015 | | FAIL |
Emily Dixon
|
|
|
Site plan does not match address/parcel pulled in permit.
|
Intake Approval | | | 10/5/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please see mark ups on check list for additional items needed.
|
Application received | | | 10/1/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 1 2015 2:38PM
|