Third Notice | | 6/18/2017 | 7/12/2017 | | DONE |
|
|
|
Mailed 7-13-17
|
Second Notice | | 5/20/2017 | 6/13/2017 | | DONE |
|
|
|
sent in mail 6-14-17
|
First Notice | 4/28/2017 | 4/28/2017 | 5/10/2017 | | DONE |
Candy A. Nichols
|
|
|
sent in mail 5-11-17
|
BLD-Final | 4/28/2017 | 4/28/2017 | 4/30/2017 | P | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 4/28/2017 | 4/28/2017 | 4/28/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/26/2017 | 4/26/2017 | 4/28/2017 | | DONE |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/25/2017 | 4/25/2017 | 4/28/2017 | | DONE |
Tony Young
|
|
|
|
BLD-Aging Inspection | 12/9/2016 | 12/9/2016 | 12/12/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 12/8/2016 | 12/8/2016 | 12/12/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Final | 7/27/2016 | 7/27/2016 | 7/27/2016 | P | PASS |
Phil Shearer
|
|
|
Rod Phone #: ###-####
|
FIRE-Final Inspection | 7/27/2016 | 7/27/2016 | 7/27/2016 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, core and shell is considered unoccupied space until tenant improvements are made so no fire extinguishers are installed. Final life fire safety inspection passed/complete.
|
PubWorks Occupancy Approval | 7/1/2016 | 7/1/2016 | 7/1/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 6/27/2016 | 6/27/2016 | 6/27/2016 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 6/10/2016 | 6/14/2016 | 6/14/2016 | P | FAIL |
Jim Page
|
|
|
Fire sprinkler inspection is complete, emergency egress lighting inspection complete, no fire extinguishers due to shell being unoccupied space until tenant improvements happen. Fire alarm inspection partially complete, in-duct smoke detectors could not be tested in HVAC units due to no power supply connected to HVAC units. The HVAC untis need to have power to be tested for unti shutdown or the genereal contractor needs documentation from the city supporting the HVAC units being disconnected and in-duct detection being INOP. Building fire protection is with a wet pipe fire sprinkler system so interior space needs to be a conditioned space to prevent freezing.
|
BLD-Energy code compliance | 6/2/2016 | 6/2/2016 | 6/2/2016 | P | PASS |
Tony Young
|
|
|
Rod Phone #: ###-####,, wall will not be covered at this point
|
BLD-Framing/Rough-in | 5/20/2016 | 5/23/2016 | 5/23/2016 | A | PART |
Tony Young
|
|
|
Rod Phone #: ###-####,, frame on shell ok pending sprinklers and alarm
|
BLD-Framing/Rough-in | 5/19/2016 | 5/20/2016 | 5/22/2016 | P | DEFR |
Tony Young
|
|
|
Rod Phone #: ###-####
|
BLD-Energy code compliance | 5/2/2016 | 5/3/2016 | 5/3/2016 | P | PART |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Rod Fender
|
BLD-Framing/Rough-in | 4/29/2016 | 4/29/2016 | 4/29/2016 | P | PART |
Jim Sly
|
|
|
John-riser room Phone #: ###-#### Riser room OK. Holddowns OK.
|
BLD-Framing/Rough-in | 4/20/2016 | 4/21/2016 | 4/21/2016 | P | PASS |
Tony Young
|
|
|
Shear inspection Phone #: ###-#### Inspection requested via web by Rod Fender,, exterior ok after a few minor nailing fixes,, will need to add some bolts in sill plates on missed layout
|
BLD-Foundation | 2/11/2016 | 2/12/2016 | 2/12/2016 | P | PEND |
Tony Young
|
|
|
GEO TEC will be inspecting also for stem walls steel. Concrete set for 2PM Phone #: ###-#### Inspection requested via web by steven barth
|
BLD-Foundation | 1/14/2016 | 1/15/2016 | 1/15/2016 | A | PEND |
Tony Young
|
|
|
Rebar // Ryan Phone #: ###-####,,, pending spec insp report
|
BLD-Footing | 1/14/2016 | 1/15/2016 | 1/15/2016 | A | PART |
Tony Young
|
|
|
Ryan Phone #: ###-####,, ok pending special insp report
|
Issue PAID IN FULL permit | | | 1/14/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/14/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 1/7/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 1/7/2016 | | DONE |
Christina Prado
|
|
|
***ALL REQUIRMENTS MET 1-13-16 /CEV
***Needs ACHD 1-11-16 /CEV
***still needs ACHD & RP 1-8-16 /CEV
Need ACHD, RP , Gc form & Revised certificate of vlaue for issuance
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/6/2016 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 10/12/2015 | | 1/6/2016 | | PASS |
Tim L. Woodard
|
|
|
New commercial - ePlanReview - North Pointe Retail #4
|
Routing PW Drainage | 1/5/2016 | | 1/5/2016 | | PASS |
Jason C. Taylor
|
|
|
|
Routing Off Site - STRUCTURAL | 12/14/2015 | | 12/20/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - Design Review | 12/14/2015 | | 12/15/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Drainage | 12/14/2015 | | 12/15/2015 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks in ePlan. JCT
|
Routing - PLAN CHECK | 12/14/2015 | | 12/14/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Route to Impact Fee Review | 11/16/2015 | 11/19/2015 | 11/19/2015 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 11/16/2015 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/12/2015 | | 11/16/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 10/12/2015 | | 11/16/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Environmental | 10/12/2015 | | 11/12/2015 | | PASS |
Rick Christenson
|
|
|
1500 Gallon Exterior Grease Interceptor Show with GW lines.
|
Routing PW Solid Waste | 10/12/2015 | | 10/29/2015 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Drainage | 10/12/2015 | | 10/20/2015 | | FAIL |
Jason C. Taylor
|
|
|
See notes in ePlan. JCT
|
Routing - PLUMBING | 10/12/2015 | | 10/19/2015 | | PASS |
Bill VanDegrift
|
|
|
|
Routing - FIRE | 10/12/2015 | 10/12/2015 | 10/13/2015 | | PASS |
Scott Arellano
|
|
|
Comments attached to case.
|
Routing - Erosion and Sediment | 10/12/2015 | | 10/13/2015 | | PASS |
Evan Jenkins
|
|
|
(NORTH POINTE RETAIL BLDG 4) Construction of single-story, 6,288 SF commercial retail building, within the multi-family apartment complex.
|
Routing PW Sewer Design | 10/12/2015 | | 10/13/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - Design Review | 10/12/2015 | | 10/12/2015 | | FAIL |
Andrea Tuning
|
|
|
Andrea Tuning - DRH15-00340
|
Routing - PLANNING Land Div | 10/12/2015 | | 10/12/2015 | | PASS |
Dave Abo
|
|
|
|
Routing - Addressing | 10/12/2015 | | 10/12/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 10/12/2015 | | 10/12/2015 | | PASS |
Beverly Mountain
|
|
|
|
Pending Assignment by JCB | 10/12/2015 | | 10/12/2015 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 10/9/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Javier Guzman and plan review fees paid.
|
Intake Approval | | | 10/6/2015 | | FAIL |
Javier Guzman
|
|
|
Please provide the following (Incomplete submittals will not be accepted. Applicants with incomplete submittals must upload additional documents):
1. Erosion & Sediment Control (ESC) Narrative. Narrative must be designed for the specific project, and be prepared and signed by a plan designer certified by Boise City.
2. Filled out form #310 – Statement of Special Inspections must be completed by the design engineer. (plan sheet S0.4 is requesting special inspections and we need the form 310 filled out)
|
Application received | | | 10/1/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 1 2015 2:41PM
|