Permit Information
Permit NumberBLD15-03584
StatusFinaled
Name RADIX CONSTRUCTION INC
Site Address 7546 W STATE ST
Project NameNorth Pointe Retail Building 4
Customer Number 
ePlanReviewYes
Description
(NORTH POINTE RETAIL – BLDG #4 – Shell and Core) Permit is to construct a 6,288 square foot Retail / Office / Assembly Shell building. This building is constructed as a wood frame building and a concrete footing. Work includes: new foundation, new exterior walls, new mechanical, stubbing in plumbing into the building, site work, new wood frame exterior walls, new manufactured wood truss roof system, and new electrical (Exterior Lighting Approved). This building will be fully Fire Sprinklered with an approved Fire Alarm system. System shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. NOTE: In accordance with Section C401.2 option #1 of the 2012 IECC; ANSI/ASHREA/IESNA 90.1 were used to show compliance with the Energy Code. The lighting installed within the tenant spaces shall also comply with ASHREA. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/18/20177/12/2017 DONE
Mailed 7-13-17
Second Notice 5/20/20176/13/2017 DONE
sent in mail 6-14-17
First Notice4/28/20174/28/20175/10/2017 DONE
DetailsCandy A. Nichols
sent in mail 5-11-17
BLD-Final4/28/20174/28/20174/30/2017PDONE
DetailsTony Young
DOC - Permit Finaled4/28/20174/28/20174/28/2017PPASS
DetailsTony Young
BLD-Aging Inspection4/26/20174/26/20174/28/2017 DONE
DetailsTony Young
BLD-Aging Inspection4/25/20174/25/20174/28/2017 DONE
DetailsTony Young
BLD-Aging Inspection12/9/201612/9/201612/12/2016 PASS
DetailsTony Young
BLD-Aging Inspection12/8/201612/8/201612/12/2016 PASS
DetailsTony Young
BLD-Final7/27/20167/27/20167/27/2016PPASS
DetailsPhil Shearer
Rod Phone #: ###-####
FIRE-Final Inspection7/27/20167/27/20167/27/2016APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, core and shell is considered unoccupied space until tenant improvements are made so no fire extinguishers are installed. Final life fire safety inspection passed/complete.
PubWorks Occupancy Approval7/1/20167/1/20167/1/2016 DONE
DetailsTiffany Lowery
Zoning Approval6/27/20166/27/20166/27/2016 DONE
DetailsAndrea Tuning
FIRE-Final Inspection6/10/20166/14/20166/14/2016PFAIL
DetailsJim Page
Fire sprinkler inspection is complete, emergency egress lighting inspection complete, no fire extinguishers due to shell being unoccupied space until tenant improvements happen. Fire alarm inspection partially complete, in-duct smoke detectors could not be tested in HVAC units due to no power supply connected to HVAC units. The HVAC untis need to have power to be tested for unti shutdown or the genereal contractor needs documentation from the city supporting the HVAC units being disconnected and in-duct detection being INOP. Building fire protection is with a wet pipe fire sprinkler system so interior space needs to be a conditioned space to prevent freezing.
BLD-Energy code compliance6/2/20166/2/20166/2/2016PPASS
DetailsTony Young
Rod Phone #: ###-####,, wall will not be covered at this point
BLD-Framing/Rough-in5/20/20165/23/20165/23/2016APART
DetailsTony Young
Rod Phone #: ###-####,, frame on shell ok pending sprinklers and alarm
BLD-Framing/Rough-in5/19/20165/20/20165/22/2016PDEFR
DetailsTony Young
Rod Phone #: ###-####
BLD-Energy code compliance5/2/20165/3/20165/3/2016PPART
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Rod Fender
BLD-Framing/Rough-in4/29/20164/29/20164/29/2016PPART
DetailsJim Sly
John-riser room Phone #: ###-####
Riser room OK. Holddowns OK.
BLD-Framing/Rough-in4/20/20164/21/20164/21/2016PPASS
DetailsTony Young
Shear inspection Phone #: ###-#### Inspection requested via web by Rod Fender,, exterior ok after a few minor nailing fixes,, will need to add some bolts in sill plates on missed layout
BLD-Foundation2/11/20162/12/20162/12/2016PPEND
DetailsTony Young
GEO TEC will be inspecting also for stem walls steel. Concrete set for 2PM Phone #: ###-#### Inspection requested via web by steven barth
BLD-Foundation1/14/20161/15/20161/15/2016APEND
DetailsTony Young
Rebar // Ryan Phone #: ###-####,,, pending spec insp report
BLD-Footing1/14/20161/15/20161/15/2016APART
DetailsTony Young
Ryan Phone #: ###-####,, ok pending special insp report
Issue PAID IN FULL permit  1/14/2016 DONE
Inspection Record Card- Bld  1/14/2016 DONE
OVERRIDE  1/7/2016  
Permit Ready to Issue  1/7/2016 DONE
DetailsChristina Prado
***ALL REQUIRMENTS MET 1-13-16 /CEV

***Needs ACHD 1-11-16 /CEV

***still needs ACHD & RP 1-8-16 /CEV
Need ACHD, RP , Gc form & Revised certificate of vlaue for issuance
PLANS/APPL TAKEN TO FRONT DESK  1/6/2016 DONE
Plan assigned to (TLW)10/12/2015 1/6/2016 PASS
DetailsTim L. Woodard
New commercial - ePlanReview - North Pointe Retail #4
Routing PW Drainage1/5/2016 1/5/2016 PASS
DetailsJason C. Taylor
Routing Off Site - STRUCTURAL12/14/2015 12/20/2015 PASS
DetailsTim L. Woodard
Routing - Design Review12/14/2015 12/15/2015 PASS
DetailsAndrea Tuning
Routing PW Drainage12/14/2015 12/15/2015 FAIL
DetailsJason C. Taylor
see changemarks in ePlan. JCT
Routing - PLAN CHECK12/14/2015 12/14/2015 PASS
DetailsTim L. Woodard
Route to Impact Fee Review11/16/201511/19/201511/19/2015 PASS
DetailsCindy M. Gould
1st review completed  11/16/2015 DONE
Routing Off Site - STRUCTURAL10/12/2015 11/16/2015 FAIL
DetailsTim L. Woodard
Routing - PLAN CHECK10/12/2015 11/16/2015 PASS
DetailsTim L. Woodard
Routing PW Environmental10/12/2015 11/12/2015 PASS
DetailsRick Christenson
1500 Gallon Exterior Grease Interceptor Show with GW lines.
Routing PW Solid Waste10/12/2015 10/29/2015 PASS
DetailsPeter J. McCullough
Routing PW Drainage10/12/2015 10/20/2015 FAIL
DetailsJason C. Taylor
See notes in ePlan. JCT
Routing - PLUMBING10/12/2015 10/19/2015 PASS
DetailsBill VanDegrift
Routing - FIRE10/12/201510/12/201510/13/2015 PASS
DetailsScott Arellano
Comments attached to case.
Routing - Erosion and Sediment10/12/2015 10/13/2015 PASS
DetailsEvan Jenkins
(NORTH POINTE RETAIL BLDG 4) Construction of single-story, 6,288 SF commercial retail building, within the multi-family apartment complex.
Routing PW Sewer Design10/12/2015 10/13/2015 PASS
DetailsKyle S. Rosenmeyer
Routing - Design Review10/12/2015 10/12/2015 FAIL
DetailsAndrea Tuning
Andrea Tuning - DRH15-00340
Routing - PLANNING Land Div10/12/2015 10/12/2015 PASS
DetailsDave Abo
Routing - Addressing10/12/2015 10/12/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS10/12/2015 10/12/2015 PASS
DetailsBeverly Mountain
Pending Assignment by JCB10/12/2015 10/12/2015 DONE
DetailsJason Blais
Intake Approval  10/9/2015 PASS
DetailsJason Blais
Prescreen approved by Javier Guzman and plan review fees paid.
Intake Approval  10/6/2015 FAIL
DetailsJavier Guzman
Please provide the following (Incomplete submittals will not be accepted. Applicants with incomplete submittals must upload additional documents):
1. Erosion & Sediment Control (ESC) Narrative. Narrative must be designed for the specific project, and be prepared and signed by a plan designer certified by Boise City.
2. Filled out form #310 – Statement of Special Inspections must be completed by the design engineer. (plan sheet S0.4 is requesting special inspections and we need the form 310 filled out)
Application received  10/1/2015 DONE
Application submitted via PDS Online on Oct 1 2015 2:41PM