BLD-Final | 10/13/2015 | 10/14/2015 | 10/14/2015 | A | NH |
Jim Sly
|
|
|
Final can be done at anytime. Thanks, Rich. Phone #: ###-#### Inspection requested via web by rich prasch No access. No one at home.
|
BLD-Footing | 10/8/2015 | 10/9/2015 | 10/9/2015 | A | PASS |
Jim Sly
|
|
|
This footing inspection can be done in the late AM or early PM. Aaron will be the one doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
Routing Walk-In (BLD) | 10/6/2015 | 10/6/2015 | 10/6/2015 | A | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 10/6/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2015 | | DONE |
|
|
|
|
Telephone call | | | 10/6/2015 | | DONE |
|
|
|
Spoke with Rich informing him that the permit is ready to be picked up and the fee amount that is due
|
Issue PAID IN FULL permit | | | 10/6/2015 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 10/5/2015 | | 10/6/2015 | | DONE |
Tisha Gallop
|
|
|
walk in 1st review 10/5;
|
Permit Ready to Issue | | | 10/6/2015 | | DONE |
Carlos Velazquez
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/6/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Routing Walk-In (BLD) | 10/2/2015 | 10/2/2015 | 10/5/2015 | P | FAIL |
Tisha Gallop
|
|
|
|
Telephone call | | | 10/5/2015 | | DONE |
|
|
|
spoke to Rich Prasch/Covertech and told him need specs for sandwich panel and current ES-Report and/or engineering for sandwich panel.
|
1st review completed | | | 10/5/2015 | | FAIL |
Tisha Gallop
|
|
|
|
Routing Walk-In (Zoning) | 10/2/2015 | 10/2/2015 | 10/2/2015 | A | PASS |
Colleen T Carroll
|
|
|
|
Application received | | 10/2/2015 | | | |
|
|
|
|