Permit Information
Permit NumberBLD15-03610
StatusFinaled
Name HUNTERS FOOTHILLS LLC
Site Address 5200 E BARBER DR
Project NameHarris Ranch North Pump House
Customer NumberCAR15-00008 SUP15-00005
ePlanReviewNo
Description
(HARRIS RANCH NORTH PUMP HOUSE) ""PLAN MODIFICATION TO THE GRADING PLAN"" Permit for the construction of a new 485 sq. ft. pump house with masonary wall and wood framed truss roof. Alll work per the approved plans and the attached engineering. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (FNL)  12/21/2016 DONE
Letter of compliance/Occupancy  12/21/2016 DONE
DOC - Permit Finaled  12/21/2016 DONE
Letter of compliance/Occupancy  12/21/2016 DONE
Letter of compliance/Occupancy  12/9/2016 DONE
Letter of compliance/Occupancy  12/9/2016 DONE
BLD-Final12/7/201612/9/201612/8/2016ACANC
DetailsPhil Shearer
11:00 AM
BLD-Final12/7/201612/8/201612/8/2016APASS
DetailsPhil Shearer
9:30
PubWorks Occupancy Approval12/8/201612/8/201612/8/2016 DONE
DetailsTiffany Lowery
PubWorks Occupancy Approval12/7/201612/7/201612/7/2016 DONE
DetailsJason C. Taylor
Project completed. JCT
CHANGE STATUS TO (ISS)  12/7/2016 DONE
(F) Reprint permit  12/7/2016 DONE
OVERRIDE  11/17/2016  
Plan assigned to (CDM)11/14/201611/14/201611/17/2016 PASS
DetailsCarl D Madsen
Harris Ranch North Pump House
Routing - PLAN CHECK11/16/2016 11/17/2016 PASS
DetailsCarl D Madsen
Case Summary (BLD)  11/17/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/17/2016 DONE
Permit Ready to Issue  11/17/2016 DONE
DO NOT RE-ISSUE THIS IS A PLAN MOD
Telephone call  11/17/2016 DONE
called GC- told him plan mod is ready and no fees due
Routing - PUBLIC WORKS11/16/2016 11/16/2016 PASS
DetailsRachael Beierle
Routing PW Drainage11/15/2016 11/16/2016 PASS
DetailsJason C. Taylor
Resubmittals approved. JCT
Plan Modification Accepted  11/14/2016 DONE
(3) sets of modifications to the grading plans
FIRE-Final Inspection10/11/201610/12/201610/12/2016PPASS
DetailsKatie Marron
Life Safety Pass.
BLD-Final10/10/201610/11/201610/11/2016PNR
DetailsPhil Shearer
Keith-please call 2 house prior to meet for access Phone #: ###-####
BLD-Aging Inspection9/22/20169/22/20169/29/2016 CANC
DetailsPhil Shearer
BLD-Aging Inspection9/21/20169/21/20169/29/2016 PEND
DetailsPhil Shearer
BLD-Framing/Rough-in5/9/20165/10/20165/10/2016APASS
DetailsPhil Shearer
Keith Phone #: ###-####
BLD-Framing/Rough-in4/28/20164/28/20164/28/2016PPART
DetailsPhil Shearer
Keith Phone #: ###-####. Roof nailing
BLD-Framing/Rough-in4/27/20164/28/20164/28/2016PCANC
DetailsPhil Shearer
Keith Phone #: ###-####
BLD-Foundation4/4/20164/6/20164/6/2016APASS
DetailsPhil Shearer
9:30 Pour; Keith Phone #: ###-####
BLD-Foundation3/21/20163/22/20163/22/2016APASS
DetailsPhil Shearer
BLD-Concrete2/19/20162/22/20162/22/2016APASS
DetailsPhil Shearer
After 10:00
BLD-Foundation2/16/20162/17/20162/17/2016APASS
DetailsPhil Shearer
Keith-stem wall Phone #: ###-####
BLD-Footing2/9/20162/11/20162/11/2016APASS
DetailsPhil Shearer
Rebar, pouring at 11:30 - Keith Phone #: ###-####
Issue PAID IN FULL permit  12/24/2015 DONE
DetailsChristina Prado
Inspection Record Card- Bld  12/24/2015 DONE
DetailsChristina Prado
OVERRIDE  12/22/2015  
Plan assigned to (CDM)10/6/201510/6/201512/22/2015 PASS
DetailsCarl D Madsen
First review completed
Routing - PLANNING12/22/2015 12/22/2015 PASS
DetailsCody Riddle
Inspection Record Card- Bld  12/22/2015 DONE
Telephone call  12/22/2015 DONE
called Landon to let know permit is ready but that we still need the ACHD letter, GC form & RP-left message that once we got the ACHD letter we could tell him what his fees are
PLANS/APPL TAKEN TO FRONT DESK  12/22/2015 DONE
Permit Ready to Issue  12/22/2015 DONE
***all requirements met

NEED ACHD, RP AND GC FORM. GC TURNED IN APPLICATION
Routing - PLAN CHECK12/11/2015 12/22/2015 PASS
DetailsCarl D Madsen
Routing - FIRE12/14/201512/14/201512/14/2015 PASS
DetailsKatie Marron
Revised report attached to plans
Routing - PUBLIC WORKS12/10/2015 12/11/2015 PASS
DetailsJennifer Bruner
Routing PW Drainage12/9/2015 12/10/2015 PASS
DetailsJason C. Taylor
Routing PW Flood Plain12/9/2015 12/10/2015 PASS
DetailsJim Wyllie
Plan resubmittals received  12/10/2015 DONE
resubmittals recieved 3 sets of sheets of G0002, C001 & C004-took to Carl Madsen
Plan resubmittals received  12/8/2015 DONE
resubmittals recieved 3 sets of sheets G.2.8, G.2.7, G.2.4,G001, G002, C001, C004, A101, A201, A202,S001, S002, S003, S101, S102, S103, S201, P101, P201, P202, D001D002, D003, D004, D005, D006, D007, D008, D009, E001, E002, E003, E004, L001, L101, L102, L301, L302, L303, M001, M002, M003, M004, M005-3 special inspections statements & 3 com checks- took to Carl M
Routing - FIRE11/10/201510/6/201511/16/2015 FAIL
DetailsScott Arellano
Comments attached to plans and emailed to architect.
1st review completed  11/16/2015 DONE
Routing - MECHANICAL10/15/2015 10/21/2015 PASS
DetailsTroy James
Routing - PLAN CHECK  10/21/2015 FAIL
DetailsCarl D Madsen
Routing - PLUMBING  10/19/2015 PASS
drainage to swale
Routing - Erosion and Sediment10/14/2015 10/14/2015 PASS
DetailsEvan Jenkins
Harris Ranch North Pump House
Routing PW Sewer Rating10/7/2015 10/13/2015 PASS
DetailsJennifer Bruner
No sanitary sewer connection; no fees. jkb
Routing PW Environmental  10/13/2015 PASS
DetailsRick Christenson
Per PW Routing sheet sign off by RWC
Routing - PLANNING Land Div10/13/2015 10/13/2015 PASS
DetailsDave Abo
Over 5 acres in size.
Routing - PUBLIC WORKS10/8/2015 10/13/2015 FAIL
DetailsJennifer Bruner
No PW Hillside required per Jason Taylor; Failed Drainage and Floodplain
Routing PW Sewer Design10/8/2015 10/12/2015 PASS
DetailsKyle S. Rosenmeyer
No Review Required. No connection to sanitary sewer.
Routing PW Drainage10/7/2015 10/8/2015 FAIL
DetailsJason C. Taylor
Need re-submittal of grading plan for:
1. Show Floodplain Boundary on sheet C001 as per K. Gephardt’s model.
2. Provide apron (trash/rodent rack) ends on both the inlet and outlet pipes. Provide construction detail.
3. Provide a non-woven fabric under all riprap areas. Provide construction detail.
4. Provide detail of swale, show separation distance of infiltration gallery and groundwater per Boise City Stormwater Manual.
Routing PW Flood Plain10/7/2015 10/8/2015 FAIL
DetailsJim Wyllie
Routing - Addressing10/6/2015 10/7/2015 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  10/5/2015 DONE
Intake Approval  10/5/2015 PASS
DetailsAdele J Schaffeld-Griffin
Recd Pcfee & Taken To Pln CK  10/5/2015 DONE
Application received 10/5/2015