Permit Information
Permit NumberBLD15-03620
StatusFinaled
Name JAYO CONSTRUCTION INC
Site Address 2060 N PAINTED ROCK LN
Project Name 
Customer Number 
ePlanReviewNo
Description
**DAF** WUI Zone A; Permit for the construction of a new 2120 sq. ft., two story (first story 1515 sq. ft., second story 375 sq. ft. and 230 sq. ft. of unconditioned storage space in basement) single family dwelling with 3 bedrooms, 2 bathrooms, approximately 312 sq. ft. of covered patio/porch and a 740 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1B zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/31/201611/1/201611/1/2016APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by SHANE JAYO asper tony jason is ok with hill side sign off
DOC - Permit Finaled11/1/201611/1/201611/1/2016PPASS
DetailsDave Hannah
BLD-Final10/31/201610/31/201610/31/2016PNR
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Other10/26/201610/26/201610/27/2016PDONE
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Aging Inspection8/5/20168/5/20168/5/2016 PASS
DetailsTony Young
BLD-Aging Inspection8/4/20168/4/20168/5/2016 PASS
DetailsTony Young
BLD-Other6/28/20166/28/20166/28/2016APART
DetailsDave Hannah
onr hr soffits can light boxs ok and crew is installing soffit sheetrock as they go
BLD-Wall Bracing6/28/20166/28/20166/28/2016APEND
DetailsDave Hannah
ok to cover ext c/n on site needs to install huds at garage
BLD-Framing/Rough-in6/27/20166/28/20166/28/2016APEND
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by SHANE JAYO ok to insulate c/n on site
BLD-Foundation3/23/20163/23/20163/23/2016PPASS
DetailsDave Hannah
Gatti Phone #: ###-####
BLD-Footing3/17/20163/18/20163/18/2016APART
DetailsTony Young
Gatti Phone #: ###-####,, work in progress
BLD-Foundation3/17/20163/17/20163/17/2016PPART
DetailsTony Young
Gatti Phone #: ###-####,, wanted a footing inspection,, ok,, work in progress
PubWorks Subgrade Approval3/14/20163/14/20163/14/2016 DONE
DetailsJason C. Taylor
*ALL FOOTINGS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  3/8/2016 DONE
OVERRIDE  3/2/2016  
Plan assigned to (DAF)2/8/20162/8/20163/2/2016 DONE
DetailsDavid Ferguson
Need 3 pages stamped by structural engineer
Telephone call  3/2/2016 DONE
Spoke with Shane informing him that his permit is re-ready
Case Summary (BLD)  3/2/2016 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK3/2/2016 3/2/2016 PASS
DetailsDavid Ferguson
Case Summary (BLD)  3/2/2016 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  3/2/2016 DONE
Permit Ready to Issue  3/2/2016 DONE
All Met
Plan resubmittals received  2/25/2016 DONE
received two full sets of plans and two copies of engineering, one manual J and RES check- put with originals on Dave's desk
Routing - PLAN CHECK2/8/2016 2/17/2016 FAIL
DetailsDavid Ferguson
Need 3 pages stamped by structural engineer
Plan resubmittals received  2/8/2016 DONE
received (2) sets of full plans for basement storage room
Telephone call  10/28/2015 DONE
called Shane to let know permit is ready and how much is owed-lefrt message on his cell phone
OVERRIDE  10/27/2015  
Plan assigned to (DAF)10/7/201510/7/201510/27/2015 DONE
DetailsDavid Ferguson
due 10/27 L2
1st review completed  10/27/2015 DONE
DetailsDavid Ferguson
Case Summary (BLD)  10/27/2015 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  10/27/2015 DONE
Permit Ready to Issue  10/27/2015 DONE
All Requirements Met **RP expires in a month 11/27/15**
Routing - PLAN CHECK10/6/2015 10/27/2015 PASS
DetailsDavid Ferguson
Inspection Record Card- Bld  10/27/2015 DONE
Routing - FIRE  10/15/2015 PASS
No comments.
Routing - Erosion and Sediment10/12/2015 10/14/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

WUI Zone A; Permit for the construction of a new 1,890 sq. ft., two story (main level 1,515 sq. ft., finished basement 375 sq. ft.) single family dwelling with 3 bedrooms, 2 and a half bathrooms, approximately 304 sq. ft. of covered patio/porch and a 740 sq. ft. attached garage
Routing - MECHANICAL10/7/2015 10/12/2015 PASS
DetailsTroy James
Routing PW Grading-Hillside  10/7/2015 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Routing - Addressing10/6/2015 10/7/2015 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS10/6/2015 10/7/2015 PASS
DetailsBeverly Mountain
Routing - PLANNING10/7/2015 10/7/2015 PASS
DetailsSusan Riggs
PLEASE SEE RED LINED PLANS. WINDOWS MAY NOT EXTEND INTO THE 5' REQUIRED SIDE YARD SETBACK.
Plan assigned to (LEG) Tisha10/6/2015 10/7/2015 DEFR
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  10/6/2015 DONE
Intake Approval  10/6/2015 PASS
Recd Pcfee & Taken To Pln CK  10/6/2015 DONE
Application received 10/5/2015