BLD-Final | 10/31/2016 | 11/1/2016 | 11/1/2016 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO asper tony jason is ok with hill side sign off
|
DOC - Permit Finaled | 11/1/2016 | 11/1/2016 | 11/1/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 10/31/2016 | 10/31/2016 | 10/31/2016 | P | NR |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Other | 10/26/2016 | 10/26/2016 | 10/27/2016 | P | DONE |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Aging Inspection | 8/5/2016 | 8/5/2016 | 8/5/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 8/4/2016 | 8/4/2016 | 8/5/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Other | 6/28/2016 | 6/28/2016 | 6/28/2016 | A | PART |
Dave Hannah
|
|
|
onr hr soffits can light boxs ok and crew is installing soffit sheetrock as they go
|
BLD-Wall Bracing | 6/28/2016 | 6/28/2016 | 6/28/2016 | A | PEND |
Dave Hannah
|
|
|
ok to cover ext c/n on site needs to install huds at garage
|
BLD-Framing/Rough-in | 6/27/2016 | 6/28/2016 | 6/28/2016 | A | PEND |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO ok to insulate c/n on site
|
BLD-Foundation | 3/23/2016 | 3/23/2016 | 3/23/2016 | P | PASS |
Dave Hannah
|
|
|
Gatti Phone #: ###-####
|
BLD-Footing | 3/17/2016 | 3/18/2016 | 3/18/2016 | A | PART |
Tony Young
|
|
|
Gatti Phone #: ###-####,, work in progress
|
BLD-Foundation | 3/17/2016 | 3/17/2016 | 3/17/2016 | P | PART |
Tony Young
|
|
|
Gatti Phone #: ###-####,, wanted a footing inspection,, ok,, work in progress
|
PubWorks Subgrade Approval | 3/14/2016 | 3/14/2016 | 3/14/2016 | | DONE |
Jason C. Taylor
|
|
|
*ALL FOOTINGS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 3/8/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 3/2/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 2/8/2016 | 2/8/2016 | 3/2/2016 | | DONE |
David Ferguson
|
|
|
Need 3 pages stamped by structural engineer
|
Telephone call | | | 3/2/2016 | | DONE |
|
|
|
Spoke with Shane informing him that his permit is re-ready
|
Case Summary (BLD) | | | 3/2/2016 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 3/2/2016 | | 3/2/2016 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 3/2/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/2/2016 | | DONE |
|
|
|
All Met
|
Plan resubmittals received | | | 2/25/2016 | | DONE |
|
|
|
received two full sets of plans and two copies of engineering, one manual J and RES check- put with originals on Dave's desk
|
Routing - PLAN CHECK | 2/8/2016 | | 2/17/2016 | | FAIL |
David Ferguson
|
|
|
Need 3 pages stamped by structural engineer
|
Plan resubmittals received | | | 2/8/2016 | | DONE |
|
|
|
received (2) sets of full plans for basement storage room
|
Telephone call | | | 10/28/2015 | | DONE |
|
|
|
called Shane to let know permit is ready and how much is owed-lefrt message on his cell phone
|
OVERRIDE | | | 10/27/2015 | | |
|
|
|
|
Plan assigned to (DAF) | 10/7/2015 | 10/7/2015 | 10/27/2015 | | DONE |
David Ferguson
|
|
|
due 10/27 L2
|
1st review completed | | | 10/27/2015 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 10/27/2015 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/27/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/27/2015 | | DONE |
|
|
|
All Requirements Met **RP expires in a month 11/27/15**
|
Routing - PLAN CHECK | 10/6/2015 | | 10/27/2015 | | PASS |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 10/27/2015 | | DONE |
|
|
|
|
Routing - FIRE | | | 10/15/2015 | | PASS |
|
|
|
No comments.
|
Routing - Erosion and Sediment | 10/12/2015 | | 10/14/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
WUI Zone A; Permit for the construction of a new 1,890 sq. ft., two story (main level 1,515 sq. ft., finished basement 375 sq. ft.) single family dwelling with 3 bedrooms, 2 and a half bathrooms, approximately 304 sq. ft. of covered patio/porch and a 740 sq. ft. attached garage
|
Routing - MECHANICAL | 10/7/2015 | | 10/12/2015 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | | | 10/7/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing - Addressing | 10/6/2015 | | 10/7/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 10/6/2015 | | 10/7/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLANNING | 10/7/2015 | | 10/7/2015 | | PASS |
Susan Riggs
|
|
|
PLEASE SEE RED LINED PLANS. WINDOWS MAY NOT EXTEND INTO THE 5' REQUIRED SIDE YARD SETBACK.
|
Plan assigned to (LEG) Tisha | 10/6/2015 | | 10/7/2015 | | DEFR |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/6/2015 | | DONE |
|
|
|
|
Intake Approval | | | 10/6/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/6/2015 | | DONE |
|
|
|
|
Application received | | 10/5/2015 | | | |
|
|
|
|