First Notice | | 2/18/2016 | 2/22/2016 | | DONE |
|
|
|
This permit finaled on the web by derek cooper
|
First Notice | 2/2/2016 | 2/2/2016 | 2/22/2016 | | DONE |
Jim Sly
|
|
|
This permit finaled on the web by derek cooper
|
Permanent Occupancy | | | 2/8/2016 | | DONE |
|
|
|
|
BLD-Final | 2/2/2016 | 2/2/2016 | 2/2/2016 | P | PASS |
Jim Sly
|
|
|
Robert Phone #: ###-####
|
DOC - Permit Finaled | 2/2/2016 | 2/2/2016 | 2/2/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 1/28/2016 | 1/28/2016 | 1/28/2016 | P | NR |
Jim Sly
|
|
|
Robert Phone #: ###-#### need mech gas piping final.
|
FIRE-Final Inspection | 1/28/2016 | 1/28/2016 | 1/28/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Provide sticker at main exit as discussed prior to a building inspection
|
BLD-Final | 1/20/2016 | 1/21/2016 | 1/22/2016 | P | NR |
Jim Sly
|
|
|
Robert Phone #: ###-#### Need fire final.
|
FIRE-Final Inspection | 1/20/2016 | 1/21/2016 | 1/21/2016 | A | FAIL |
Troy Cobbley
|
|
|
The pendant sprinkler head at the new restroom is overspaced. The maximum spacing for these heads is 130 sq. ft. Also automatic flush bolts are needed for the inactive leaf of the main exit or get with plan review and see if hardware can be deleted.
|
(F) Reprint permit | | | 1/20/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/20/2016 | | DONE |
|
|
|
|
Plan assigned to (JG) | 12/23/2015 | 12/23/2015 | 12/30/2015 | | PASS |
Javier Guzman
|
|
|
modification to the floor plan, Pending others
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/30/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/30/2015 | | DONE |
Christina Prado
|
|
|
Need Revised cert of value for added plan mod value for issuance
***DO NOT RE-ISSUE*** Plan Mod only!!!!
|
Routing PW Sewer Rating | 12/24/2015 | | 12/29/2015 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 12/24/2015 | | 12/28/2015 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/24/2015 | | 12/28/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PLAN CHECK | 12/23/2015 | | 12/24/2015 | | PASS |
Javier Guzman
|
|
|
|
Plan Modification Accepted | | | 12/23/2015 | | DONE |
|
|
|
modification to the floor plan
|
BLD-Framing/Rough-in | 12/21/2015 | 12/22/2015 | 12/22/2015 | A | PART |
Jim Sly
|
|
|
Derick Phone #: ###-#### Framing per plan OK. Framing at office space......not on approved plan< needs to be approved by PDS Dept. Derick said he would have approval by final insp.
|
Issue PAID IN FULL permit | | | 10/13/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/13/2015 | | DONE |
|
|
|
|
Plan assigned to (JG) | 10/9/2015 | 10/9/2015 | 10/12/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, Pending addessing, 10/15 L1 Vanilla Finish Suite 10390
|
Routing - PLAN CHECK | 10/9/2015 | | 10/12/2015 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 10/12/2015 | | FAIL |
Javier Guzman
|
|
|
Pending addressing
|
Routing - Addressing | 10/12/2015 | | 10/12/2015 | | PASS |
Emily Dixon
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/12/2015 | | DONE |
|
|
|
Need GC and Revised Cert of Value
|
Routing - Addressing | 10/9/2015 | | 10/9/2015 | | FAIL |
Emily Dixon
|
|
|
Address does not match vicinity map. Please correct one or the other.
|
Routing - PUBLIC WORKS | 10/9/2015 | | 10/9/2015 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 10/9/2015 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 10/7/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 7 2015 9:36AM
|
Intake Approval | | | 10/7/2015 | | FAIL |
David Ferguson
|
|
|
Provide key plan so that our addressing department can verify the address.
|