BLD-Final | 4/27/2016 | 4/28/2016 | 4/28/2016 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
DOC - Permit Finaled | 4/28/2016 | 4/28/2016 | 4/28/2016 | P | PASS |
Jim Storey
|
|
|
|
PubWorks Occupancy Approval | 4/27/2016 | 4/27/2016 | 4/27/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 1/18/2016 | 1/19/2016 | 1/19/2016 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Wall cover | 1/14/2016 | 1/15/2016 | 1/15/2016 | P | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-####
|
BLD-Framing/Rough-in | 1/14/2016 | 1/15/2016 | 1/15/2016 | P | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 1/15/2016 | | DONE |
|
|
|
as per Jim Storey; final has not been completed yet
|
Plan Modification Accepted | | | 1/7/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 1/7/2016 | | 1/7/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
Case Summary (BLD) | | | 1/6/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/6/2016 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 1/6/2016 | | DONE |
|
|
|
Contractor Bryan Murdoch from Doug Lasher Const. brought in issued set of plans. Redlined issue set and office set for WUI A requirements.
|
Telephone call | | | 12/18/2015 | | DONE |
|
|
|
e-mailed Doug Lasher and called and left voicemail. Permit issued in error as WUI B, should have been WUI B with Zone A requirements. Please submit revisions additional details for WUI A requirements.
|
BLD-Foundation | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 11/10/2015 | 11/10/2015 | 11/10/2015 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 11/9/2015 | 11/10/2015 | 11/10/2015 | A | CANC |
Jim Sly
|
|
|
Josh Phone #: ###-####
|
PubWorks Subgrade Approval | 11/9/2015 | 11/9/2015 | 11/9/2015 | | DONE |
Jason C. Taylor
|
|
|
* CRAWLSPACE FOOTINGS**A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 11/6/2015 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/6/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/6/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/6/2015 | | DONE |
|
|
|
requirements met
|
Plan assigned to (LEG) Tisha | 10/8/2015 | | 11/5/2015 | | DONE |
Tisha Gallop
|
|
|
2nd review 11/3; 1st review 10/29; plan check (plan review report)
|
Plan resubmittals received | | | 11/5/2015 | | DONE |
|
|
|
Two copies of Shearwal Calculations, two copies of sheets A-103, S-101, S-102, and S-108. Taken to Tisha
|
Case Summary (BLD) | | | 11/5/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/5/2015 | | 11/5/2015 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/3/2015 | | 11/3/2015 | | FAIL |
Tisha Gallop
|
|
|
see plan review report
|
Plan resubmittals received | | | 10/30/2015 | | DONE |
|
|
|
Three copies of sheet A-104, S-102, S-103, S-107, S-108 and two copies of Tall wall, lateral and foundation calcs
|
Routing - PLAN CHECK | 10/19/2015 | | 10/29/2015 | | FAIL |
Tisha Gallop
|
|
|
see plan review report in documents
|
1st review completed | | | 10/29/2015 | | FAIL |
|
|
|
pending approval from Building
|
Routing - FIRE | 10/19/2015 | | 10/19/2015 | | PASS |
Scott Arellano
|
|
|
No comments.
|
Routing - MECHANICAL | 10/13/2015 | | 10/19/2015 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 10/19/2015 | | 10/19/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
WUI Zone B; Permit for the construction of a new 3,370 sq. ft., two story (main level 2,174 sq. ft., second level 1,196 sq. ft.) single family dwelling with 5 bedrooms, 3 and a half bathrooms, approximately 238 sq. ft. of covered patio/porch and a 1,288 sq. ft. attached garage
|
Routing - PLANNING | 10/12/2015 | | 10/13/2015 | | PASS |
Colleen T Carroll
|
|
|
CAT1 Hillside - JCT
|
Routing PW Grading-Hillside | 10/12/2015 | | 10/12/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - Addressing | 10/8/2015 | | 10/12/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 10/12/2015 | | 10/12/2015 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/8/2015 | | DONE |
|
|
|
|
Intake Approval | | | 10/8/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/8/2015 | | DONE |
|
|
|
|
Application received | | 10/8/2015 | | | |
|
|
|
|