BLD-Aging Inspection | 7/13/2016 | 7/13/2016 | 7/14/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Final | 7/12/2016 | 7/13/2016 | 7/13/2016 | P | PASS |
Tony Young
|
|
|
Phil Phone #: ###-####
|
DOC - Permit Finaled | 7/13/2016 | 7/13/2016 | 7/13/2016 | P | PASS |
Tony Young
|
|
|
c of o issued
|
PubWorks Occupancy Approval | 7/13/2016 | 7/13/2016 | 7/13/2016 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 7/12/2016 | 7/12/2016 | 7/12/2016 | P | NR |
Tony Young
|
|
|
Phil Phone #: ###-####,, needs public works approval,, walk through only
|
BLD-Final | 7/11/2016 | 7/12/2016 | 7/12/2016 | A | DEFR |
Tony Young
|
|
|
Phil Phone #: ###-####
|
BLD-Final | 7/11/2016 | 7/11/2016 | 7/12/2016 | P | DEFR |
Tony Young
|
|
|
Phil Phone #: ###-####
|
BLD-Energy code compliance | 2/29/2016 | 3/1/2016 | 3/1/2016 | A | PASS |
Jim Sly
|
|
|
Phil Phone #: ###-####
|
BLD-Framing/Rough-in | 2/22/2016 | 2/23/2016 | 2/23/2016 | A | PART |
Tony Young
|
|
|
Phil Phone #: ###-####,, ok to insulate walls,, need to have sprinklers inspected prior to cover
|
OVERRIDE | | | 2/22/2016 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/22/2016 | | DONE |
Christina Prado
|
|
|
All requirements met for Plan mod, no fees due
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/22/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/22/2016 | | DONE |
Christina Prado
|
|
|
All requirements met for Plan mod, no fees due
|
Routing - PLAN CHECK | 2/17/2016 | | 2/22/2016 | | PASS |
David Ferguson
|
|
|
|
Routing - FIRE | 2/17/2016 | 2/17/2016 | 2/17/2016 | | PASS |
Scott Arellano
|
|
|
Approved; with attached comments in case. This structure is required to be fire sprinklered as an approved code alternate to other Fire Code deficiencies.
|
BLD-Wall Bracing | 2/4/2016 | 2/5/2016 | 2/5/2016 | A | PASS |
Jim Sly
|
|
|
John Phone #: ###-####
|
BLD-Foundation | 12/2/2015 | 12/2/2015 | 12/2/2015 | P | PASS |
Tony Young
|
|
|
Bern Phone #: ###-####
|
BLD-Footing | 11/18/2015 | 11/19/2015 | 11/20/2015 | P | PART |
Tony Young
|
|
|
Dane Phone #: ###-####,, work in progress
|
PubWorks Subgrade Approval | 11/18/2015 | 11/18/2015 | 11/18/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 11/2/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 10/30/2015 | | |
|
|
|
|
Telephone call | | | 10/30/2015 | | DONE |
|
|
|
Left a message for John informing him that the permit is ready and the fee amount that is due. Also informed him that there are no Sewer fees because there is no city sewer in that area
|
Inspection Record Card- Bld | | | 10/30/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/30/2015 | | DONE |
|
|
|
requirements met
|
Plan assigned to (DAF) | 10/14/2015 | 10/14/2015 | 10/29/2015 | | DONE |
David Ferguson
|
|
|
due 10/29 L2
|
Routing - PLAN CHECK | 10/20/2015 | | 10/29/2015 | | PASS |
David Ferguson
|
|
|
|
1st review completed | | | 10/29/2015 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 10/29/2015 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/29/2015 | | DONE |
|
|
|
|
Routing - FIRE | 10/19/2015 | | 10/20/2015 | | FAIL |
Scott Arellano
|
|
|
Emailed plan review report to applicant. Attached report to case.
|
Routing - MECHANICAL | 10/13/2015 | | 10/19/2015 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 10/19/2015 | | 10/19/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
WUI Zone A; Permit for the construction of a new 3,624 sq. ft., two story (main level 2,822 sq. ft., upper level 198 sq. ft. and a finished basement 604 sq. ft. ) single family dwelling with 4 bedrooms, 4 bathrooms, approximately 117 sq. ft. of covered patio/porch and a 831 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1A zoning and setbacks per planning.
|
Plan assigned to (LEG) Tisha | 10/8/2015 | | 10/14/2015 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - PLANNING | 10/12/2015 | | 10/13/2015 | | PASS |
Sue Cummings
|
|
|
CAT 1 Hillside - JCT
|
Routing - Addressing | 10/8/2015 | | 10/12/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 10/12/2015 | | 10/12/2015 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Grading-Hillside | 10/12/2015 | | 10/12/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 10/8/2015 | | 10/8/2015 | | FAIL |
David Ferguson
|
|
|
Need sprinkler approval
|
Plans ACCEPTED BY PLAN TECH | | | 10/8/2015 | | DONE |
|
|
|
|
Intake Approval | | | 10/8/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/8/2015 | | DONE |
|
|
|
|
Application received | | 10/8/2015 | | | |
|
|
|
|