BLD-Final | 3/11/2016 | 3/15/2016 | 3/15/2016 | A | PASS |
Jim Sly
|
|
|
Doug Phone #: ###-####
|
DOC - Permit Finaled | 3/15/2016 | 3/15/2016 | 3/15/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 11/19/2015 | 11/20/2015 | 11/20/2015 | P | PASS |
Phil Shearer
|
|
|
Doug Phone #: ###-####
|
BLD-Energy code compliance | 11/20/2015 | 11/20/2015 | 11/20/2015 | P | PASS |
Phil Shearer
|
|
|
Doug Phone #: ###-####
|
BLD-Conference | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | DONE |
Phil Shearer
|
|
|
Doug Phone #: ###-####
|
Plan assigned to (BJM) | 10/16/2015 | 10/16/2015 | 10/23/2015 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/23/2015 | | 10/23/2015 | | PASS |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/23/2015 | | |
|
|
|
requirements met
|
Issue PAID IN FULL permit | | | 10/23/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/22/2015 | | 10/22/2015 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/16/2015 | | 10/19/2015 | | FAIL |
Brian McGowan
|
|
|
Requested more detailed drawings
|
1st review completed | | | 10/19/2015 | | FAIL |
Brian McGowan
|
|
|
Needed more detailed drawings
|
Plans ACCEPTED BY PLAN TECH | | | 10/16/2015 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/16/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 10/16/2015 | | PASS |
Christina Prado
|
|
|
|
Application received | | | 10/12/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 12 2015 10:31AM
|
Intake Approval | | | 10/12/2015 | | FAIL |
|
|
|
drawings need to be uploaded individually and put into the drawings folder. Also need existing floor plan, proposed floor plan, and a wall section
|