BLD-Final | 6/1/2016 | 6/2/2016 | 6/2/2016 | A | PASS |
Phil Shearer
|
|
|
Call 30 minutes in advance Phone #: ###-#### Inspection requested via web by bryan murdoch
|
DOC - Permit Finaled | 6/2/2016 | 6/2/2016 | 6/2/2016 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 6/1/2016 | 6/1/2016 | 6/1/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
PubWorks Subgrade Approval | 5/31/2016 | 5/31/2016 | 5/31/2016 | | FAIL |
Jason C. Taylor
|
|
|
Need adjacent lot owners approval for crossing of drain line outside of drainage easement. JCT
|
BLD-Energy code compliance | 3/8/2016 | 3/9/2016 | 3/9/2016 | P | PASS |
Jim Sly
|
|
|
Thank you Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 3/8/2016 | 3/8/2016 | 3/8/2016 | P | PASS |
Jim Sly
|
|
|
Wall bracing also please. Phone #: ###-#### Inspection requested via web by bryan murdoch Wall bracing OK.
|
Plan Modification Accepted | | | 2/23/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 2/23/2016 | | 2/23/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 12/14/2015 | 12/15/2015 | 12/15/2015 | A | PASS |
Dave Hannah
|
|
|
Eric ###-#### Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Foundation | 12/11/2015 | 12/14/2015 | 12/14/2015 | A | CANC |
Phil Shearer
|
|
|
Eric ###-#### Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Footing | 11/23/2015 | 11/24/2015 | 11/24/2015 | P | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
PubWorks Subgrade Approval | 11/24/2015 | 11/24/2015 | 11/24/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 11/12/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 11/10/2015 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/10/2015 | | DONE |
|
|
|
|
Telephone call | | | 11/10/2015 | | DONE |
|
|
|
called Doug- left message that permit is ready for pick up and fees due
|
Plan resubmittals received | | | 11/10/2015 | | DONE |
|
|
|
received engineering calculation addendum
|
Routing - PLAN CHECK | 11/10/2015 | | 11/10/2015 | | PASS |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 11/10/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/10/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/10/2015 | | DONE |
|
|
|
All Met
|
Plan assigned to (LEG) Tisha | 10/13/2015 | | 11/10/2015 | | DONE |
Tisha Gallop
|
|
|
2nd review 11/4; 1st review 10-30; plan check (plan review report)
|
Plan resubmittals received | | | 11/5/2015 | | DONE |
|
|
|
Two copies of Foundation Calcs. Two copies of sheet S-102, S-107, S108, and S-110 Taken to Tisha
|
Routing - PLAN CHECK | 11/3/2015 | | 11/4/2015 | | FAIL |
Tisha Gallop
|
|
|
see plan review report
|
Plan resubmittals received | | | 11/3/2015 | | DONE |
|
|
|
received (2) sets of; Floor Plan, Wall Section, Framing Plan
|
Routing - PLAN CHECK | 10/26/2015 | | 10/30/2015 | | FAIL |
Tisha Gallop
|
|
|
plan review report
|
1st review completed | | | 10/30/2015 | | FAIL |
Tisha Gallop
|
|
|
pending approval from plan check
|
Routing - PLANNING | 10/16/2015 | | 10/30/2015 | | PASS |
Susan Riggs
|
|
|
CFH15-00055
|
Routing - FIRE | 10/21/2015 | 10/13/2015 | 10/26/2015 | | PASS |
Scott Arellano
|
|
|
No comments.
|
Routing - Erosion and Sediment | 10/20/2015 | | 10/21/2015 | | PASS |
Andy J. Long
|
|
|
ESC plan submitted and approved. Valid RP and PD designated. Site prepartion inspection and BMP installation required.
|
Routing - MECHANICAL | | | 10/20/2015 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 10/13/2015 | | 10/16/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing PW Grading-Hillside | | | 10/16/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 10/16/2015 | | 10/16/2015 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/13/2015 | | DONE |
|
|
|
|
Intake Approval | | | 10/13/2015 | | PASS |
|
|
|
as per Rita; okay to intake during appeal period
|
Override - Parcel Holds | | | 10/13/2015 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/13/2015 | | DONE |
|
|
|
|
Application received | | 10/13/2015 | | | |
|
|
|
|