Second Notice | | 12/20/2015 | 1/11/2016 | | DONE |
|
|
|
Mailed 1-12-16
|
First Notice | | 11/22/2015 | 12/10/2015 | | DONE |
|
|
|
Mailed 12-11-15
|
BLD-Final | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####-please call to meet/discuss. ok fo rperm occ. Noted that contractor stated that tenant they will not install the curtains as noted on plans. No documentation was provided. The tenant has issued a letter staing that curtains will not be installed unlees they meet the code requirements.
|
Permanent Occupancy | | | 11/12/2015 | | DONE |
|
|
|
|
BLD-Final | 11/9/2015 | 11/10/2015 | 11/10/2015 | A | FAIL |
Mike Jordan
|
|
|
Robert Phone #: ###-####. Remove the thumb turn dead bolt from the rear exit and repair the in place panic hardware. Provide documentation to show compliance with NFPA 701 flame propagation for curtains.
|
FIRE-Final Inspection | 11/9/2015 | 11/9/2015 | 11/9/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Conference | 11/4/2015 | 11/4/2015 | 11/4/2015 | P | DONE |
Mike Jordan
|
|
|
John-existing bath Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/2/2015 | 11/3/2015 | 11/3/2015 | A | PART |
Mike Jordan
|
|
|
John Phone #: ###-####. grid ok, pending other trades.
|
BLD-Framing/Rough-in | 10/23/2015 | 10/23/2015 | 10/23/2015 | P | PART |
Mike Jordan
|
|
|
John Phone #: ###-####. interior steel stud framed walls ok. Pend. electrical rough in inspection.
|
Issue PAID IN FULL permit | | | 10/21/2015 | | DONE |
|
|
|
|
Plan assigned to (JG) | 10/13/2015 | 10/13/2015 | 10/20/2015 | | PASS |
Javier Guzman
|
|
|
(see email from Scott)
|
Routing - PLAN CHECK | | | 10/20/2015 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 10/20/2015 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 10/20/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/20/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/20/2015 | | DONE |
|
|
|
need GC & Rev Cert of Val
|
Print Occupancy Form | | | 10/20/2015 | | DONE |
|
|
|
|
Telephone call | | | 10/20/2015 | | DONE |
|
|
|
talked to GC, he saw on the web that the permit is ready so he called and i told him he needed forms #302 & 306
|
Routing - Addressing | 10/13/2015 | | 10/14/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/13/2015 | | DONE |
|
|
|
|
Intake Approval | | | 10/13/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/13/2015 | | DONE |
|
|
|
|
Application received | | 10/13/2015 | | | |
|
|
|
|
Routing - PUBLIC WORKS | 10/14/2015 | | | | PASS |
Rachael Beierle
|
|
|
signed off in PW review report by Rachael B.
|