BLD-Final | 10/24/2016 | 10/24/2016 | 10/24/2016 | P | PASS |
Jim Storey
|
|
|
Goldy Phone #: ###-####
|
DOC - Permit Finaled | 10/24/2016 | 10/24/2016 | 10/24/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 10/19/2016 | 10/20/2016 | 10/20/2016 | P | PART |
Jim Storey
|
|
|
Goldy Phone #: ###-#### handt front stair exterior /only isue
|
BLD-Conference | 9/28/2016 | 9/29/2016 | 9/29/2016 | A | DONE |
Dave Hannah
|
|
|
Concerns of sidewalk and driveway encroachment. Cathy @ ###-####
|
BLD-Energy code compliance | 7/14/2016 | 7/15/2016 | 7/15/2016 | A | PASS |
Jim Storey
|
|
|
Goldy Phone #: ###-####
|
BLD-Framing/Rough-in | 7/11/2016 | 7/12/2016 | 7/12/2016 | A | PASS |
Jim Storey
|
|
|
Goldy Phone #: ###-####
|
BLD-Wall cover | 5/16/2016 | 5/17/2016 | 5/17/2016 | A | PASS |
Jim Storey
|
|
|
Not there until 9 am......Shear // Goldy Phone #: ###-####
|
BLD-Footing | 4/6/2016 | 4/7/2016 | 4/7/2016 | A | PASS |
Jim Storey
|
|
|
Terry Phone #: ###-####
|
BLD-Footing | 4/5/2016 | 4/6/2016 | 4/6/2016 | A | PART |
Mike Jordan
|
|
|
Terry Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/17/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 3/2/2016 | | |
|
|
|
|
Telephone call | | | 3/2/2016 | | DONE |
|
|
|
Spok with M.A. Goldy informing him that this permit is ready and the fee amount that is due
|
Plan assigned to (LEG) Tisha | 2/16/2016 | | 3/2/2016 | | DONE |
Tisha Gallop
|
|
|
Plan Modification 1st review 2/18
|
Case Summary (BLD) | | | 3/2/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/2/2016 | | DONE |
|
|
|
All Met
|
Routing - PLAN CHECK | 2/26/2016 | | 3/1/2016 | | PASS |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 3/1/2016 | | DONE |
|
|
|
|
Routing - Design Review | 3/1/2016 | | 3/1/2016 | | PASS |
Andrea Tuning
|
|
|
|
Plan resubmittals received | | | 2/26/2016 | | DONE |
|
|
|
received two copies of Enerflo packets and 2 copies of details for sheet 1A and 2A. put with plans on Tisha's desk
|
Routing - PLAN CHECK | 2/16/2016 | | 2/18/2016 | | FAIL |
Tisha Gallop
|
|
|
emailed Goldy
|
Plan Reviewer's activity | | | 2/18/2016 | | DONE |
Tisha Gallop
|
|
|
Minor exterior changes. Changed to two glass doors on second level to windows. Per Andrea Tuning no modification to DR required.
|
Plan resubmittals received | | | 2/16/2016 | | DONE |
|
|
|
received two complete sets of plans for a modification- put with original plans and set on Tisha's desk
|
BLD-Conference | 2/12/2016 | 2/12/2016 | 2/12/2016 | P | DONE |
Phil Shearer
|
|
|
|
OVERRIDE | | | 12/3/2015 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/3/2015 | | DONE |
|
|
|
|
Telephone call | | | 12/3/2015 | | DONE |
|
|
|
called Goldy t let know permit is ready and how much is owed-
|
Routing - PLAN CHECK | 12/2/2015 | | 12/3/2015 | | PASS |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 12/3/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/3/2015 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 10/14/2015 | | 12/3/2015 | | DONE |
Tisha Gallop
|
|
|
1st review 10/28; failed planning (needs DR)
|
Routing - PLANNING | 12/2/2015 | | 12/2/2015 | | PASS |
Andrea Tuning
|
|
|
DRH15-00432
|
Routing - PLAN CHECK | 10/22/2015 | | 10/28/2015 | | PASS |
Tisha Gallop
|
|
|
|
1st review completed | | | 10/28/2015 | | FAIL |
Tisha Gallop
|
|
|
pending approval from Planning (Design Review)
|
Routing - MECHANICAL | 10/20/2015 | | 10/22/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 10/20/2015 | | 10/20/2015 | | FAIL |
Andrea Tuning
|
|
|
The applicant has not gone through the Design Review Process. The application will go before the DR Committee on Novmber 18, 2015.
|
Routing - Addressing | 10/14/2015 | | 10/20/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 10/20/2015 | | 10/20/2015 | | PASS |
Rachael Beierle
|
|
|
|
Route to Impact Fee Review | 10/14/2015 | 10/17/2015 | 10/19/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/14/2015 | | DONE |
|
|
|
|
Intake Approval | | | 10/14/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/14/2015 | | DONE |
|
|
|
|
Application received | | 10/13/2015 | | | |
|
|
|
|