Permit Information
Permit NumberBLD15-03767
StatusFinaled
Name SAGE INTERNATIONAL SCHOOL OF BOISE
Site Address 421 E PARKCENTER BLVD
Project NameSage International School
Customer Number 
ePlanReviewYes
Description
(SAGE INTERNATIONAL SCHOOL – Phase II) This project is to convert the remainder of an existing covered mall building (Parkcenter Mall) into a new school. PLAN MODIFICATION - Plan mod to change a previously approved double door to a single 42 inch wide door due to structural constraints. 2-12-16 **TLW** The building is fire sprinklered for area increase. Under Phase I 30,0000 square feet of the Northern part of the building was built out (BLD14-00884). Under this phase the remaining 54,850 square feet will be built out with new classrooms, a library, cafeteria, and common area. Work is to include: [structural upgrades including: new wood sheer walls, new wood hold-downs, new drag sheer blocking and strapping, new wood headers, and concrete repairs], exterior site improvements, [construction of interior non-bearing walls to create 27 classrooms, 5 offices, 6 core restrooms, a staff room, two multipurpose assembly rooms, and a library], installation of new exterior windows, installation of a new roof on the entire structure, installation of accessible doors / hardware, installation of the second side of a two-hour wall assembly (first side completed in phase I), and interior finishes. NOTE: This permit fulfills the “Upgrade Agreement” on file for this building. When the building is finaled a request to nullify the existing “Upgrade Agreement” based on completion of this work should be submitted. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  12/2/2016 DONE
Third Notice 10/15/201611/21/2016 DONE
Third Notice 9/17/201610/10/2016 DONE
Print Occupancy Form  9/30/2016 DONE
Permanent Occupancy  9/30/2016 DONE
Second Notice 8/22/20169/12/2016 DONE
Mailed 9-13-16
First Notice7/28/20167/28/20168/12/2016 DONE
DetailsJim Storey
Mailed 8-15-16
BLD-Final7/28/20167/28/20167/28/2016PPASS
DetailsJim Storey
DOC - Permit Finaled7/28/20167/28/20167/28/2016PPASS
DetailsJim Storey
FIRE-Final Inspection7/28/20167/28/20167/28/2016PPASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher are in place with current inspection tags. Final life fire safety inspection passed/complete.
BLD-Final7/27/20167/28/20167/28/2016ANR
DetailsJim Storey
Boyd Phone #: ###-####
FIRE-Final Inspection7/27/20167/27/20167/27/2016PCANC
DetailsJim Page
Inspection request cancelled, FIR permits for fire alarm and fire sprinklers still in issued status, inspections for these permits needs to be completed and passed before life fire safety inspection can be performed.
BLD-Ceiling Grid Inspection6/17/20166/20/20166/20/2016APASS
DetailsJim Storey
Boyd Phone #: ###-####
BLD-Ceiling Grid Inspection6/3/20166/6/20166/6/2016APASS
DetailsJim Storey
Boyd Phone #: ###-####
BLD-Ceiling Grid Inspection5/12/20165/13/20165/13/2016APASS
DetailsJim Storey
Boyd Phone #: ###-#### 1 of 4 ok pending trades
BLD-Framing/Rough-in5/12/20165/13/20165/13/2016APASS
DetailsJim Storey
Boyd Phone #: ###-####
BLD-Framing/Rough-in4/8/20164/8/20164/8/2016PPASS
DetailsJim Storey
Boyd Phone #: ###-####
BLD-Energy code compliance3/22/20163/23/20163/23/2016APASS
DetailsJim Storey
Boyd Phone #: ###-#### west drag strut in place with hold downs straps an hangers/ all exterior and roof insulation ok
BLD-Framing/Rough-in3/18/20163/18/20163/18/2016PPASS
DetailsJim Storey
Boyd Phone #: ###-#### colm supports at openings ok/ roof openings ok/ mez resupport ok/ backing for ada ok
BLD-Framing/Rough-in3/8/20163/8/20163/8/2016PPASS
DetailsJim Storey
Boyd Phone #: ###-####
BLD-Framing/Rough-in2/26/20162/26/20162/26/2016PPASS
DetailsJim Storey
First inspection please for SE Corner - Boyd Phone #: ###-#### phase 1 ok pending si report for epoxy hardware and headers ok to cover/ footting ok at mez
CHANGE STATUS TO (ISS)  2/26/2016 DONE
all fees paid
OVERRIDE  2/12/2016  
Plan assigned to (TLW)2/9/2016 2/12/2016 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK2/9/2016 2/12/2016 PASS
DetailsTim L. Woodard
Approved Plan Mod to change a double door to a single door. TLW
PLANS/APPL TAKEN TO FRONT DESK  2/12/2016 DONE
Permit Ready to Issue  2/12/2016 DONE
DetailsChristina Prado
PLAN MOD ONLY - DO NOT RE-ISSUE!! All requirements met for plan mod approval

Must pay Plan Mod fees prior to changing status to ISS
Plan Modification Accepted  2/9/2016 DONE
plan mod recieved for exit door changes
Issue PAID IN FULL permit  12/14/2015 DONE
Inspection Record Card- Bld  12/14/2015 DONE
OVERRIDE  12/8/2015  
Permit Ready to Issue  12/8/2015 DONE
DetailsChristina Prado
***ALL REQUIRMENTS MET 12-11-15 //CEV
Need GC, RP & Revised Certificate of value for issuance
Plan resubmittals received  12/7/2015 DONE
Routing - PLAN CHECK12/7/2015 12/7/2015 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  12/7/2015 DONE
Plan assigned to (TLW)10/20/2015 12/7/2015 PASS
DetailsTim L. Woodard
Level 3 TI - ePlanReview - Sage International School
Routing - PLAN CHECK10/20/2015 11/16/2015 FAIL
DetailsTim L. Woodard
1st review completed  11/16/2015 DONE
Routing - MECHANICAL10/20/2015 11/10/2015 PASS
DetailsTroy James
Routing PW Sewer Rating10/20/2015 11/3/2015 PASS
DetailsJennifer Bruner
Routing - PLUMBING10/20/2015 10/26/2015 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing - FIRE10/20/201510/20/201510/23/2015 PASS
DetailsScott Arellano
Comments attached to case.
Routing - Erosion and Sediment10/22/2015 10/22/2015 PASS
DetailsEvan Jenkins
(SAGE INTERNATIONAL SCHOOL)(PHASE II REMODEL) This work applies to an existing Upgrade Agreement on file under Phase I building permit BLD14-00884. Phase I CUP13-00066, Phase I DRH14-00082. Phase II to remodel southern 54,000 sq.ft. of remaining parkcenter Mall building to combine with phase I for a total of 84,000 sq.ft. Interior construction to include demolition of all partition walls, interior finishes, etc. and the construction of new partition walls to form 28 classrooms, 1 library, 1 commons/lunch room, 1 multi-purpose room, 4 offices and 4 banks of offices. Insert exterior windows into designated walls on the East, South & West sides of the existing Parkcenter Mall/Sage International School building to bring more light into new classrooms.
Routing - ELECTRICAL10/20/2015 10/22/2015 PASS
DetailsJavier Guzman
Routing - Design Review10/20/2015 10/22/2015 PASS
DetailsJosh Wilson
Ok per DRH15-00417
Routing - Erosion and Sediment10/20/2015 10/21/2015 FAIL
DetailsEvan Jenkins
ESC Waiver Letter Request Required per BCC 8-17
Routing - PLANNING10/20/2015 10/20/2015 PASS
DetailsCody Riddle
Cody Riddle - CUP13-00066
Routing - Addressing10/20/2015 10/20/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS10/20/2015 10/20/2015 PASS
DetailsBeverly Mountain
Pending Assignment by JCB10/20/2015 10/20/2015 DONE
DetailsJason Blais
Intake Approval  10/19/2015 FAIL
DetailsCarl D Madsen
Special inspection start up for required
Intake Approval  10/19/2015 PASS
DetailsJason Blais
Prescreen approved by Carl Madsen and plan review fees paid.
Application received  10/14/2015 DONE
Application submitted via PDS Online on Oct 14 2015 1:31PM