Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-03784
StatusFinaled
Name THE CHRISTENSEN CORPORATION
Site Address 950 W BANNOCK ST Unit: 370
Project NamePremier Nutrition Suite 370
Customer Number 
ePlanReviewNo
Description
(PREMIER NUTRITION – BANNER BANK BUILDING – 3rd FLOOR UNIT 370 ) The fire sprinkler system is used for high rise and for story increase. Permit is to remodel an existing 3,085 square foot office tenant space on the 3rd floor of a high-rise building. Work is to include: removal of select NXTWALL demountable partitions, installation of NXTWALL demountable partitions to create (3) storage rooms, a kitchen, a conference room, a reception area, (2) offices, a work room, an open office area and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  3/21/2016 DONE
Third Notice 2/17/20163/10/2016 DONE
Second Notice 1/22/20162/12/2016 DONE
sent with mail 2-16-16
First Notice 12/14/20151/12/2016 DONE
Mailed 1-13-16
BLD-Final12/3/201512/4/201512/4/2015APASS
DetailsDave Hannah
Phone #: 8415809 >> Inspection requested via mobile web by Mike
Permanent Occupancy  12/4/2015 DONE
FIRE-Final Inspection12/3/201512/3/201512/3/2015PPASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete. Life fire safety passed/complete
BLD-Framing/Rough-in11/11/201511/12/201511/12/2015APASS
DetailsDave Hannah
Phone #: 8415809 >> Inspection requested via mobile web by Mike
Case Summary (BLD)  11/6/2015 DONE
Plan assigned to (JG)10/16/201510/16/201510/23/2015 PASS
DetailsJavier Guzman
10/29 L2 Premier Nutrition
Routing - PLAN CHECK  10/23/2015 PASS
DetailsJavier Guzman
1st review completed  10/23/2015 DONE
DetailsJavier Guzman
Case Summary (BLD)  10/23/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  10/23/2015 DONE
Permit Ready to Issue  10/23/2015 DONE
GC was Applicant
Print Occupancy Form  10/23/2015 DONE
Telephone call  10/23/2015 DONE
Left a message for Sam informing him that the permit is ready and the fee amount that is due
Issue PAID IN FULL permit  10/23/2015 DONE
Routing - Addressing10/16/2015 10/20/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS10/20/2015 10/20/2015 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  10/16/2015 DONE
Intake Approval  10/16/2015 PASS
Recd Pcfee & Taken To Pln CK  10/16/2015 DONE
Application received 10/15/2015