Third Notice | | 6/16/2018 | 6/16/2018 | | DONE |
|
|
|
This permit finaled on the web by Ami Tracy
|
Third Notice | | 5/15/2018 | 6/11/2018 | | DONE |
|
|
|
Mailed 6-12
|
Second Notice | | 4/20/2018 | 5/10/2018 | | DONE |
|
|
|
mailed 5-11-18
|
First Notice | | 3/17/2018 | 4/10/2018 | | DONE |
|
|
|
mailed 4-11-18
|
BLD-Final | 3/7/2018 | 3/8/2018 | 3/7/2018 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
Permanent Occupancy | | | 3/7/2018 | | DONE |
|
|
|
|
BLD-Final | 2/28/2018 | 3/1/2018 | 3/2/2018 | P | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Final | 3/1/2018 | 3/2/2018 | 3/2/2018 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
Zoning Approval | 3/2/2018 | 3/2/2018 | 3/2/2018 | | PASS |
Sarah Schafer
|
|
|
|
FIRE-Final Inspection | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection for this permit complete.
|
FIRE-Final Inspection | 2/22/2018 | 2/22/2018 | 2/22/2018 | P | FAIL |
Jim Page
|
|
|
Provide as-builts for stairwell pressurization activation automatic function/manual function and overide, fire alarm permit will not be finaled until as-builts are submitted and approved.
|
Temporary Occupancy | 2/2/2018 | 5/3/2018 | 2/2/2018 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | PART |
Jim Page
|
|
|
Fire sprinkler inspection complete for level 1 lobby and level 2 common areas. Fire alarm testing partially complete for parking levels, additional notification required on level 1.5 landing on southside of garage. Fire alarm testing complete for level 1 lobby and level 2 common areas. Fire extinguishers are in place with current inspection tags.
|
BLD-Final | 1/25/2018 | 1/26/2018 | 1/29/2018 | P | PEND |
Dave Hannah
|
|
|
Level 1 and 2 not 2nd garage live work units Jason Phone #: ###-####
|
FIRE-Final Inspection | 1/25/2018 | 1/26/2018 | 1/26/2018 | P | CANC |
Jim Page
|
|
|
Inspection request for life fire safety TCO will be rescheduled for 29JAN2018.
|
BLD-Final | 1/19/2018 | 1/23/2018 | 1/23/2018 | P | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
FIRE-Final Inspection | 1/22/2018 | 1/23/2018 | 1/23/2018 | A | CANC |
Jim Page
|
|
|
Issues with fire alarm on level 6, more testing needs to be completed before TCO, this request is cancelled.
|
FIRE-Final Inspection | 1/19/2018 | 1/22/2018 | 1/22/2018 | A | CANC |
Jim Page
|
|
|
Due to inspection load, this inspection will be rescheduled by Jason Phone #: ###-#### for 9AM, this request is cancelled.
|
BLD-Conference | 1/3/2018 | 1/3/2018 | 1/4/2018 | P | DONE |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/2/2018 | 1/2/2018 | 1/2/2018 | P | PASS |
Dave Hannah
|
|
|
Inspection request for the ceiling grid at the management office. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus
|
BLD-Final | 12/20/2017 | 12/22/2017 | 12/22/2017 | A | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-####
Dave, requesting partial final for garage only up to mezzanine. Chad has signed off for mechancal on card in my office. Sarah is going out this afternoon to inspect garage interior. Public Works sign off not needed for this phase. Thanks, Angie ok for temp occ obn phase one parking garege only.
|
Temporary Occupancy | 12/22/2017 | 3/22/2018 | 12/22/2017 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 12/18/2017 | 12/19/2017 | 12/19/2017 | A | PART |
Jim Page
|
|
|
Life fire safety inspection for phase 1 TCO complete.
|
Print Occupancy Form | | | 12/18/2017 | | DONE |
Christina Prado
|
|
|
|
BLD-Conference | 12/4/2017 | 12/5/2017 | 12/5/2017 | P | DONE |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Conference | 11/17/2017 | 11/20/2017 | 11/20/2017 | A | PASS |
Dave Hannah
|
|
|
Conference request for Core ; Shell. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus
|
BLD-Ceiling Grid Inspection | 11/16/2017 | 11/17/2017 | 11/17/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for the ceiling grid in the Live Works and Housing lobby. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Ceiling Grid Inspection | 10/30/2017 | 10/30/2017 | 10/30/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection Request for ceiling grids and wall covering. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus
|
BLD-Ceiling Grid Inspection | 10/24/2017 | 10/25/2017 | 10/25/2017 | A | FAIL |
Dave Hannah
|
|
|
Inspection request for (2) two grid ceilings on the first floor. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus fire stopping above ceiling
|
BLD-Other | 10/19/2017 | 10/20/2017 | 10/20/2017 | A | PASS |
Dave Hannah
|
|
|
Monte-fire wall in trash room Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/16/2017 | 10/17/2017 | 10/17/2017 | A | PASS |
Dave Hannah
|
|
|
Monty-3A Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/20/2017 | 9/21/2017 | 9/21/2017 | A | PASS |
Dave Hannah
|
|
|
level 5 & 6 // Monte Phone #: ###-####
|
BLD-Framing/Rough-in | 9/19/2017 | 9/20/2017 | 9/20/2017 | A | PART |
Dave Hannah
|
|
|
Inspection request for 5th floor Drop Ceilings. Phone #: ###-#### Inspection requested via web by Carl Benjamin needs to fix some fire assemblies
|
BLD-Energy code compliance | 9/19/2017 | 9/20/2017 | 9/20/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for Live Works ! thru 5 Insulation and main entry Lobby fire caulking Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Framing/Rough-in | 9/18/2017 | 9/19/2017 | 9/19/2017 | A | PASS |
Dave Hannah
|
|
|
6B roof & ceiling 5A & 5B - Monty Phone #: ###-#### 6B only ok to cover
|
BLD-Framing/Rough-in | 9/15/2017 | 9/18/2017 | 9/18/2017 | A | FAIL |
Dave Hannah
|
|
|
Inspection request for framing in the entry lobby walls. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Ceiling Grid Inspection | 9/11/2017 | 9/12/2017 | 9/12/2017 | A | PASS |
Dave Hannah
|
|
|
7th floor // monte Phone #: ###-####
|
BLD-Framing/Rough-in | 8/8/2017 | 8/9/2017 | 8/9/2017 | A | PART |
Brandon Shaw
|
|
|
For the Mechanical Soffit Framing at the garage side of the Live work.
|
BLD-Aging Inspection | 7/7/2017 | 7/7/2017 | 7/7/2017 | | PASS |
Dave Hannah
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/12/2017 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 6/12/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 6/5/2017 | | |
|
|
|
|
Plan assigned to (AJS) | 5/12/2017 | 5/12/2017 | 6/5/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Permit Ready to Issue | | | 6/5/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod approved, all requirements met
DO NOT RE-ISSUE
|
Routing - PLAN CHECK | 6/1/2017 | | 6/2/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Plan mod for ASI046 only, removing partition wall in commercial space A/B and D and associated plumbing and mechanical.
|
BLD-Other | 5/26/2017 | 5/30/2017 | 5/30/2017 | A | PASS |
Dave Hannah
|
|
|
Live work , fire caulking - Carl Phone #: ###-####
|
Routing - PLAN CHECK | 5/15/2017 | | 5/24/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Environmental | 5/15/2017 | | 5/22/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - FIRE | 5/15/2017 | 5/15/2017 | 5/17/2017 | | PASS |
Katie Marron
|
|
|
Modifications to include heat pump and electrical panel for future tenant space reviewed. No additional comments required.
|
Routing - Design Review | 5/15/2017 | | 5/16/2017 | | PASS |
Sarah Schafer
|
|
|
|
Routing PW Drainage | 5/15/2017 | | 5/15/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - MECHANICAL | 5/15/2017 | | 5/15/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 5/15/2017 | | 5/15/2017 | | PASS |
Daryl Spivey
|
|
|
Per Plan & ISPC
|
Routing - Addressing | 5/15/2017 | | 5/15/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 5/15/2017 | | 5/15/2017 | | PASS |
Rachael Beierle
|
|
|
PREPARING FOR FUTURE DINING. FEES APPLIED WEN TI IS SUBMITTED
|
Plan Modification Accepted | | | 5/12/2017 | | DONE |
Christina Prado
|
|
|
Modifications to commercial tenant A/B space to provide MEP rough-in for future tenant use: location of heat pumps noted for future install by tenant; cold water line stubbed in; power for canopy-mounted letter signs revised to stub into tenant space
200A electrical panel added where conduit previously stubbed for future use, to be surface mounted to existing 1-hr rated; demising wall.
|
BLD-Conference | 4/5/2017 | 4/6/2017 | 4/6/2017 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Benjamin ok to use fire details for first floor work live units
|
BLD-Framing/Rough-in | 2/22/2017 | 2/22/2017 | 2/23/2017 | P | PART |
Dave Hannah
|
|
|
Chris Phone #: ###-#### ext framing first and second floor ok to cover ext.
|
BLD-Framing/Rough-in | 1/18/2017 | 1/19/2017 | 1/20/2017 | A | PART |
Dave Hannah
|
|
|
Inspection request for Metal Stud Framing at East Elevation of Floors 1 and 2. Phone #: ###-#### Inspection requested via web by Carl Benjamin ok to cover ext e wall
|
Place hold on job | 2/22/2016 | | 4/12/2016 | | DONE |
Brittany Hill
|
|
|
Need ACHD, RP, Revised Certificate of Value and GC form for issuance
DO NOT ISSUE WITHOUT BLD15-03423 & BLD15-03424
|
Issue PAID IN FULL permit | | | 4/12/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/12/2016 | | DONE |
|
|
|
|
Telephone call | | | 4/7/2016 | | DONE |
|
|
|
Left a message with Leslie informing her that this is one of three permits for this address, but that this one is showing it will expire in ten days and if they would like a 180 day extension they would need to email Jason B
|
Expiration Notice | 3/22/2016 | 4/12/2016 | 3/22/2016 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 2/22/2016 | | |
|
|
|
|
Routing - PLAN CHECK | 2/4/2016 | | 2/22/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 2/4/2016 | | 2/22/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved in E-Plan. TLW
|
Routing Off Site - STRUCTURAL | 2/4/2016 | | 2/22/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved in E-Plan Review. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/22/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/4/2016 | | 2/22/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved in E-Plan Review. TLW
|
Routing - MECHANICAL | 2/4/2016 | | 2/22/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved per E-Plan. TLW
|
Permit Ready to Issue | | | 2/22/2016 | | DONE |
Christina Prado
|
|
|
Need ACHD, RP, Revised Certificate of Value and GC form for issuance//All requirements met 4/11/16 CDP
DO NOT ISSUE WITHOUT BLD15-03423 & BLD15-03424
|
Plan assigned to (TLW) | 10/19/2015 | | 2/22/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 2/4/2016 | | |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 12/28/2015 | 12/28/2015 | 12/28/2015 | | PASS |
Katie Marron
|
|
|
Fire correction items resubmitted under BLD15-03423 (upper apartment bldg permit). Approved per revised report.
|
Routing Off Site - STRUCTURAL | 10/19/2015 | | 11/18/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
1st review completed | | | 11/18/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/19/2015 | | 11/18/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - MECHANICAL | 10/19/2015 | | 11/18/2015 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 10/19/2015 | | 11/18/2015 | | FAIL |
Daryl Spivey
|
|
|
|
Routing - PUBLIC WORKS | 10/19/2015 | | 11/18/2015 | | PASS |
Tim L. Woodard
|
|
|
per BLD15-03423 by Beverly Mountain
|
Routing PW Sewer Design | 10/23/2015 | | 11/18/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Sewer Rating | 10/23/2015 | | 11/3/2015 | | PASS |
Barbara Moore
|
|
|
|
Routing PW Environmental | 10/23/2015 | | 10/26/2015 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Solid Waste | 10/23/2015 | | 10/23/2015 | | PASS |
Megan Durrell
|
|
|
|
Routing PW Geothermal | 10/23/2015 | | 10/23/2015 | | PASS |
Jon R. Gunnerson
|
|
|
Coordinate geothermal connection with Public Works - 208.384.3935
|
Routing - Addressing | 10/19/2015 | | 10/23/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - Design Review | 10/19/2015 | | 10/23/2015 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH15-00152
|
Routing PW Drainage | 10/23/2015 | | 10/23/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 10/23/2015 | | 10/23/2015 | | FAIL |
Mike D Hedge
|
|
|
See BLD15-03423 in E Plan.
|
Routing - FIRE | 10/19/2015 | 10/19/2015 | 10/20/2015 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing - PLANNING Land Div | 10/19/2015 | | 10/20/2015 | | PASS |
Dave Abo
|
|
|
|
Routing - Erosion and Sediment | 10/19/2015 | | 10/20/2015 | | FAIL |
Evan Jenkins
|
|
|
Full ESC Narrative or SWPPP (To Meet Federal EPA ESC Requirements for 2012 CGP) Required per BCC 8-17 ESC Requirements, for approval. Evan Jenkins 794.3958
|
Pending Assignment by TLW | 10/19/2015 | | 10/19/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 10/16/2015 | | |
Tim L. Woodard
|
|
|
|
Application received | | 10/19/2015 | | | |
|
|
|
|
Routing - MECHANICAL | 6/1/2017 | | | | |
|
|
|
|